
The construction of the first 138m long and 21m high retaining structure has started
First time on our website?
To be able to login, you have to register first.
The construction of the first 138m long and 21m high retaining structure has started
Green Terramesh contributed to the creation of a jobsite access road within the TAP project in Albania.
Retaining wall to be used as grandstand in multi-sport centre
The third tier of the wall is a soil reinforcement structure made up of a Terramesh System.
Securing of key drilling site in Albania with Maccaferri’s retaining walls solutions
Maccaferri’s surface stabilization and soil reinforcement solutions to help the Nature.