44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massPogled
star
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,Pogled
star
AGRIPORT, MAYDON WHARF
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Pogled
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MPogled
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Pogled
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Pogled
star
ASTON HOTEL ANYER BREAKWATER STRUCTURE
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tPogled
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosPogled
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErPogled
star
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErPogled
star
AZUDES SITIO RAMSAR RÍO DESAGUADERO
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxPogled
star
BAFOKENG CIVIC CENTRE MACWALL
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaPogled
star
BALESIN ISLAND CLUB RUNWAY
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TPogled
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsPogled
star
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Pogled
star
BE-ANTWERP MALINAS
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Pogled
star
BE-MECHELEN R6
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tPogled
star
BEAVERNETTING EVERTSOORD
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bPogled
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trPogled
star
BIFURCATION A10/171 ORLEANS
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Pogled
star
BOB 230KV SWITCHYARD
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aPogled
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that Pogled
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to Pogled
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenPogled
star
BRUG VAN DEN AZIJN
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concretePogled
star
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinPogled
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisPogled
star
CATO MANOR PIPELINE & ROAD PROTECTION
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiPogled
star
CHARLEROI HOSPITAL
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installPogled
star
CHOI YING ESTATE DEVELOPMENT
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assemblePogled
star
CLIPPER WASH BANK PROTECTION
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lPogled
star
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6  feet tall. The proposed channel sidewalls will be stabilized   with gabiPogled
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Pogled
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal Pogled
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightPogled
star
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Pogled
star
ÇÖPLER GOLD MINE ROCK FALL PROJECT
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Pogled
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basPogled
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonPogled
star
DEBRIS FLOW PROTECTION LERINI STREAM
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effePogled
star
DIDIPIO MINE ACCESS ROAD
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopePogled
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tPogled
star
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PePogled
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aPogled
star
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionPogled
star
EXPO HOUSE AT DOHA EXPO 2023
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cPogled
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comePogled
star
FESTIVAL SUPERMALL MOUND PROMONTORY
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DuePogled
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toPogled
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system crePogled
star
Gabion Defense – Cajuca East Corridor
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determinePogled
star
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cPogled
star
HAROLD COURT EAST REGIONAL SERVICE CENTER
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challePogled
star
HASANKEYF ARCHEOPARK PROJECT
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysPogled
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Pogled
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the usePogled
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawPogled
star
KOSOVO MOTORWAY PROJECT
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystPogled
star
KURINGEN BRIDGE 19
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beePogled
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengePogled
star
LU-A13 DUDELANGE-BURANGE
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Pogled
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallPogled
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiPogled
star
MANILA-CAVITE EXPRESSWAY
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duPogled
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesPogled
star
MEERHOUT BRIDGE 34
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moPogled
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesPogled
star
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a nePogled
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Pogled
star
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walPogled
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retPogled
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thPogled
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thPogled
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructurePogled
star
NEW AIRPORT IN MOUNTAINOUS REGION
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Pogled
star
NEW SHARJAH-KHORFAKKAN ROAD
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Pogled
star
NL BERGEN
NL BERGEN
The anti-erosion mat MacMat R020 is reinforced by a polyester geogrid with a tensile strength of 20 kN/m. The MacMat R020 was secured to the slope witPogled
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a Pogled
star
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsPogled
star
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPogled
star
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPogled
star
OOSTERWEEL VERBINDING -LINKEROEVER, G17
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPogled
star
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPogled
star
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPogled
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiPogled
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Pogled
star
PODLJUBELJ ROCKFALL PROTECTION
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAPogled
star
PRESA FRANCISCO ABELLÁN
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofPogled
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rPogled
star
PROTEÇÃO COSTEIRA COM GABIÕES
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Pogled
star
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Pogled
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netPogled
star
Rehabilitation due to Undermining in Villalobos
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizPogled
star
Reinforced Soil Retaining Structure and Slope Reinforcement
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininPogled
star
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforcePogled
star
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Pogled
star
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in  the Windsor area, was tasked by the Town of Amherstburg   to devise aPogled
star
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofPogled
star
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyPogled
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreePogled
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Pogled
star
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedPogled
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringPogled
star
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mPogled
star
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thPogled
star
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Pogled
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Pogled
star
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VPogled
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designPogled
star
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fPogled
star
SPOORLIJN 51A – ZWANKENDAMME
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplPogled
star
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
Initially, a granular drain mat was installed at the PST (Upper Part of Earthworks) level to capture flows and percolations from surrounding water basPogled
star
SUNSET CLIFF
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersPogled
star
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tPogled
star
TELAL EL SOKHNA’ PROJECT
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiPogled
star
TERRAMESH RD PATRIMONIAL
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Pogled
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaPogled
star
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bPogled
star
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengPogled
star
Test addiction in serbo
generazionepdfsoluzione 3Pogled
star
The Ash Yard of the Thermal Power Plant
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionPogled
star
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacPogled
star
THE GRAND BOHEMIAN HOTEL
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prPogled
star
THE NEW ROUTE DU LITTORAL
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Pogled
star
THREE CITIES TRAIL
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and  implemented a tie-back reinforced gabion retaining wall to   act as the slPogled
star
TK 2018 – 006 – MRV
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxPogled
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comPogled
star
WALTHAM HIGH SCHOOL
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mPogled
star
YELLOWSTONE HWY 20
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfalPogled
star

Niste pronašli ono što ste tražili?

Filter by:
napredna pretraga












Upoznajte naše stručnjake

Predstavljamo pobedničkog partnera za kompleksan svet građevinarstva, kako civilnog tako i industrijskog. Zahvaljujući širokom spektru naših proizvoda, pružamo odgovor na različite tehničke zahteve sektora: od drenaže i zaštite, preko vodenih i vodonepropusnih rešenja za strukture i obloge, do energetske efikasnosti i udobnosti stambenih prostora, od kontrole pare do pitanja koja se odnose na ovo područje.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.