44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massPohľad
star
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,Pohľad
star
A2 / A282 JUNCTION IMPROVEMENTS
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecPohľad
star
AGRIPORT, MAYDON WHARF
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Pohľad
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MPohľad
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Pohľad
star
ASTON HOTEL ANYER BREAKWATER STRUCTURE
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tPohľad
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosPohľad
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErPohľad
star
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErPohľad
star
AZUDES SITIO RAMSAR RÍO DESAGUADERO
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxPohľad
star
BAFOKENG CIVIC CENTRE MACWALL
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaPohľad
star
BALESIN ISLAND CLUB RUNWAY
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TPohľad
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsPohľad
star
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Pohľad
star
BE-ANTWERP MALINAS
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Pohľad
star
BE-MECHELEN R6
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tPohľad
star
BEAVERNETTING EVERTSOORD
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bPohľad
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trPohľad
star
BIFURCATION A10/171 ORLEANS
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Pohľad
star
BOB 230KV SWITCHYARD
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aPohľad
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that Pohľad
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to Pohľad
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshPohľad
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshPohľad
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenPohľad
star
BRUG VAN DEN AZIJN
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concretePohľad
star
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinPohľad
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisPohľad
star
CATO MANOR PIPELINE & ROAD PROTECTION
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiPohľad
star
CHARLEROI HOSPITAL
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installPohľad
star
CHOI YING ESTATE DEVELOPMENT
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assemblePohľad
star
CLIPPER WASH BANK PROTECTION
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lPohľad
star
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6  feet tall. The proposed channel sidewalls will be stabilized   with gabiPohľad
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Pohľad
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal Pohľad
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightPohľad
star
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Pohľad
star
ÇÖPLER GOLD MINE ROCK FALL PROJECT
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Pohľad
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basPohľad
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonPohľad
star
DEBRIS FLOW PROTECTION LERINI STREAM
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effePohľad
star
DIDIPIO MINE ACCESS ROAD
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopePohľad
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tPohľad
star
Drainage of structures
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Pohľad
star
EROSION CONTROL AGAINST MAMMAL BURROWING
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Pohľad
star
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PePohľad
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aPohľad
star
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionPohľad
star
EXPO HOUSE AT DOHA EXPO 2023
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cPohľad
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comePohľad
star
FESTIVAL SUPERMALL MOUND PROMONTORY
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DuePohľad
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toPohľad
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system crePohľad
star
FV17 LIAFJELLET-OLVIKVATNET
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing thePohľad
star
Gabion Defense – Cajuca East Corridor
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determinePohľad
star
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cPohľad
star
HAROLD COURT EAST REGIONAL SERVICE CENTER
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challePohľad
star
HASANKEYF ARCHEOPARK PROJECT
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysPohľad
star
HELBOR BROOKLIN
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdPohľad
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Pohľad
star
HENNEAULAAN ZAVENTEM
HENNEAULAAN ZAVENTEM
Maccaferri´s Corporate Technical Department, in cooperation with the local partner TEXION, has proposed an optimised solution with has supported the Pohľad
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the usePohľad
star
IPO DAM SILT CURTAINS
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are bePohľad
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawPohľad
star
KOSOVO MOTORWAY PROJECT
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystPohľad
star
KURINGEN BRIDGE 19
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beePohľad
star
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyPohľad
star
LINCOLNSHIRE EFW
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of  ground level wet and dry holding lagoons. These were   impermeably linePohľad
star
LISTENING MIRRORS HISTORIC SITE
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Pohľad
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengePohľad
star
Lower Campbell Repair
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iPohľad
star
LU-A13 DUDELANGE-BURANGE
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Pohľad
star
LUOYANG FOUR RIVER TONGZHI PROJECT
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipPohľad
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallPohľad
star
MacSport AC Monza
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaPohľad
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiPohľad
star
MANILA-CAVITE EXPRESSWAY
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duPohľad
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesPohľad
star
Mass Gravity Retaining Walls
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Pohľad
star
MEERHOUT BRIDGE 34
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moPohľad
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesPohľad
star
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a nePohľad
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Pohľad
star
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walPohľad
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retPohľad
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thPohľad
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thPohľad
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructurePohľad
star
NEW AIRPORT IN MOUNTAINOUS REGION
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Pohľad
star
NEW ASDA STORE
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Pohľad
star
NEW SHARJAH-KHORFAKKAN ROAD
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Pohľad
star
NEWHURST ENERGY FROM WASTE FACILITY
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to  impermeably line the attenuation pond and this was   accepted by client HitPohľad
star
NL BERGEN
NL BERGEN
The anti-erosion mat MacMat R020 is reinforced by a polyester geogrid with a tensile strength of 20 kN/m. The MacMat R020 was secured to the slope witPohľad
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a Pohľad
star
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsPohľad
star
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoPohľad
star
OCEANS UMHLANGA MALL
OCEANS UMHLANGA MALL
After evaluating the geotechnical parameters, loading  constraints and required structure geometry, Maccaferri   provided a designPohľad
star
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPohľad
star
OOSTERWEEL VERBINDING -LINKEROEVER, G17
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPohľad
star
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPohľad
star
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPohľad
star
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshPohľad
star
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Pohľad
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiPohľad
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Pohľad
star
PODLJUBELJ ROCKFALL PROTECTION
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAPohľad
star
PRESA FRANCISCO ABELLÁN
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofPohľad
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rPohľad
star
PROTEÇÃO COSTEIRA COM GABIÕES
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Pohľad
star
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aPohľad
star
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Pohľad
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netPohľad
star
REDROW HOMES DEVELOPMENT
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiPohľad
star
Rehabilitation due to Undermining in Villalobos
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizPohľad
star
Reinforced Soil Retaining Structure and Slope Reinforcement
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininPohľad
star
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforcePohľad
star
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Pohľad
star
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in  the Windsor area, was tasked by the Town of Amherstburg   to devise aPohľad
star
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofPohľad
star
RETAINING WALL SUPPORTING A630
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was  originally proposed within the design. However, the PVC   coating on weldedPohľad
star
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyPohľad
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreePohľad
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Pohľad
star
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedPohľad
star
ROCK SUPPORT IN VÍCAR, ALMERÍA
ROCK SUPPORT IN VÍCAR, ALMERÍA
To address this problem, the following support measures were implemented:LEA 300-8 cable net with a tensile strength of 130 kN/m and a puncture resistPohľad
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringPohľad
star
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RPohľad
star
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mPohľad
star
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thPohľad
star
SADAWARNA DAM PARAMESH WALL
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshPohľad
star
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Pohľad
star
SEATION TRAMWAY
SEATION TRAMWAY
The site is situated above an area of soft soil that required  substantial ground improvement.The new platform area   adjacent to Pohľad
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Pohľad
star
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VPohľad
star
SLOPE STABILISATION PORT OF ZIERBENA
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryPohľad
star
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safePohľad
star
Small green lung in the Metelliana Valley
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoPohľad
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designPohľad
star
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fPohľad
star
SPOORLIJN 51A – ZWANKENDAMME
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplPohľad
star
St Andrews Royal & Ancient Golf Club
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byPohľad
star
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
Initially, a granular drain mat was installed at the PST (Upper Part of Earthworks) level to capture flows and percolations from surrounding water basPohľad
star
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaPohľad
star
SUNSET CLIFF
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersPohľad
star
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tPohľad
star
TELAL EL SOKHNA’ PROJECT
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiPohľad
star
TERRAMESH RD PATRIMONIAL
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Pohľad
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaPohľad
star
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bPohľad
star
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengPohľad
star
The Ash Yard of the Thermal Power Plant
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionPohľad
star
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacPohľad
star
THE GRAND BOHEMIAN HOTEL
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prPohľad
star
THE NEW ROUTE DU LITTORAL
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Pohľad
star
THREE CITIES TRAIL
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and  implemented a tie-back reinforced gabion retaining wall to   act as the slPohľad
star
TK 2018 – 006 – MRV
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxPohľad
star
Village Brow, Crawfordsburn
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingPohľad
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comPohľad
star
WALTHAM HIGH SCHOOL
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mPohľad
star
YELLOWSTONE HWY 20
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfaPohľad
star

Nenašli jste, co jste hledali?

Filter by:
Rozšírené vyhľadávanie












Poznejte naše odborníky

Zastupujeme vítězného partnera pro komplexní svět civilního a průmyslového stavitelství. Díky široké škále našich produktů jsme schopni odpovědět na různé technické požadavky tohoto odvětví: od drenáže a ochrany, přes vodotěsnost struktur a krytů, úsporu energie a pohodlí bydlení, až po kontrolu páry a související problémy s tímto odvětvím.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.