
One step forward towards completion of Highway R2-Pstruša – Kriváň. We have completed the hydro seeding of the slopes of embankment from Green Terramesh and Paragrid´s. The aim is to protect the toe of embankment in the flooded area of river Slatina, flowing by, to prevent from flooding, to avoid the potential degradation of toe (washout) and the sliding of embankment.