44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was considered sufficient to construct a stepped retaining wall from massPohľadstar
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion apron (0.5m thick). The volume of protection was approximately 13,Pohľadstar
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecPohľadstar
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Pohľadstar
AHLA DEPONI RECYCLING CENTER
The final coverage of the Ahla landfill (stage 1/Etapp 1) was carried out with LLDPE. Therefore, a layer of Maccaferri´s drainage mat MacDrain W 1041Pohľadstar
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and proposed the MacWall Landmark segmental reinforced soil wall system. MPohľadstar
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Pohľadstar
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tPohľadstar
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosPohľadstar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErPohľadstar
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErPohľadstar
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxPohľadstar
B19 – BLAICHACH BURGBERG
The GTM units met the requirements of the tight construction schedule due to its fast and undelayed construction process, even during the wintertime. Pohľadstar
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaPohľadstar
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TPohľadstar
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsPohľadstar
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Pohľadstar
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Pohľadstar
BE-CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installPohľadstar
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tPohľadstar
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bPohľadstar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trPohľadstar
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Pohľadstar
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aPohľadstar
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up with a suitable solution for the posed site problems. It was agreed that Pohľadstar
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings extensively along the 35-mile route which connects Edinburgh to Pohľadstar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshPohľadstar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshPohľadstar
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenPohľadstar
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concretePohľadstar
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinPohľadstar
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisPohľadstar
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiPohľadstar
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installPohľadstar
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assemblePohľadstar
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lPohľadstar
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6 feet tall. The proposed channel sidewalls will be stabilized with gabiPohľadstar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Pohľadstar
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by 79 new spaces, to the west of the petrol filling station. The proposal Pohľadstar
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically stabilised earth walls into the pile foundations beneath. The maximum heightPohľadstar
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Pohľadstar
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Pohľadstar
D1 DUBNÁ SKALA-TURANY, SO 146-00 RELOCATION OF ACCESS ROAD
Construction of reinforced steep green slope is part of the object SO 146-00 section C.1. Object is holding widening embankment in the section before Pohľadstar
D1 HRIČOVSKÉ PODHRADIE – LIETAVSKÁ LÚČKA, SO 100-00
Zvýšenie únosnosti podložia sa realizovalo pomocou geosyntetickej vrstvy v kombinácii s kvalitným štrkovým materiálom. Použité geosyntetickPohľadstar
D1 HRIČOVSKÉ PODHRADIE – LIETAVSKÁ LÚČKA, SO 206-00
As a most appropriate systems of retaining wall was selected TerraMesh system – consisting of gabion face element with an integrated reinforced mesh.Pohľadstar
D1 HRIČOVSKÉ PODHRADIE – LIETAVSKÁ LÚČKA, SO 221-00
Vzhľadom na výškový rozdiel medzi niveletou a základovou škárou, málo únosné vrstvy deluviálnych sedimentov a morfológiu terénu je objektPohľadstar
D1 HRIČOVSKÉ PODHRADIE – LIETAVSKÁ LÚČKA, SO101-00
Pravá strana zárezu: Zaistenie porušeného pravostranného zárezu je navrhnuté pomocou kotvenej pilotovej steny a klincovaného svahu výšky 6,0Pohľadstar
D1 HRIČOVSKÉ PODHRAIDE – LIETAVSKÁ LÚČKA, SO 206-00
As a most appropriate systems of retaining wall was selected TerraMesh system – consisting of gabion face element with an integrated reinforced mesh.Pohľadstar
D3 ČADCA, BUKOV – SVRČINOVEC, SO 281-10
Medzi hlavné charakteristické objekty patrí objekt SO 281-10, ktorý zaisťuje ľavý jazdný pás diaľnice D3 v km 38,590 000 až km 38,889 780,Pohľadstar
D3 ČADCA, BUKOV – SVRČINOVEC, SO 281-15,18
Medzi najvýznamnejšie objekty patri vystužený oporný múr SO 281-18, ktorý zaisťuje pravý jazdný pás vetvy „PB“ križovatky Podzávoz Pohľadstar
D3 ČADCA, BUKOV – SVRČINOVEC, SO 283-10
Vystužený oporný múr 283-10 Podzávoz – Vystužený násyp komunikácie SO 125-00 Diaľnica D3 Čadca, Bukov – Svrčinovec rieši zabezpečenie ľPohľadstar
D3 ČADCA, BUKOV – SVRČINOVEC, SO 283-13
Oporný múr je tvorený výstužnými blokmi Terramesh®, ktoré sú tvorené gabionovým košom v kombinácii s horizontálnou výstužnou oceľovPohľadstar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basPohľadstar
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonPohľadstar
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effePohľadstar
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopePohľadstar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tPohľadstar
DISCARICA DI BELLOLAMPO V VASCA
La realizzazione della vasca prevede l'impiego di una membrana in HDPE, di un gesontetico bentonitico e di un gecomposito drenante per la captazioPohľadstar
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Pohľadstar
EAST UMEA – GABION VERTICAL COVERING A SHEET PILE WALL
The solution consisted in special gabions manufactured with a longitudinal diaphragm with a preattached geotextile. The wall height varies from 1.5 upPohľadstar
ERDOX ZERMATT
Die Gornergrat Bahn hat verschiedene Systeme miteinander verglichen und sich für das wirtschaftlichste System, das ErdoX System von Maccaferri entschPohľadstar
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Pohľadstar
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PePohľadstar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aPohľadstar
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionPohľadstar
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cPohľadstar
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comePohľadstar
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DuePohľadstar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toPohľadstar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system crePohľadstar
FV 5096 SKREDSIKRING STRONGASVA, EIDFJORD
Maccaferri provided a dynamic barrier with 3000 kJ of energy absorption capacity and 5m height. The line of installation was chosen directly above thePohľadstar
FV. 41 GYDALEN SKREDSIKRING
Maccaferri proposed a 1000 KJ barrier, the RB 1000 PLUS barrier with a better corrosion protection (95% zinc and 5% alluminium). The barrier line of iPohľadstar
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing thePohľadstar
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determinePohľadstar
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cPohľadstar
GEDIMINAS HILL
In cooperation with state officials, local geologists and experts, Maccaferri was invited to propose solutions for the soil reinforcement measures. DuPohľadstar
GUDVANGEN – BAKKATUNNELEN
Fortunately, two years ago, some rows of rockfall barriers type EPFM 5000 with an energy capacity of 5000 kJ were installed to protect the road and roPohľadstar
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challePohľadstar
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysPohľadstar
HASSELT N71 HERKENRODESINGEL
AWV Limburg chose to use the Maccaferri Road Mesh Type “Omega” to be installed under the new roadway. The Omega type is produced following the COPPohľadstar
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdPohľadstar
HELLOMAC – Ponza – Cala Fonte
Maccaferri has always pursued innovation and has already taken part in this digital transformation developing a new alert system: HELLOMAC. Thanks to Pohľadstar
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Pohľadstar
HENNEAULAAN ZAVENTEM
Maccaferri´s Corporate Technical Department, in cooperation with the local partner TEXION, has proposed an optimised solution with has supported the Pohľadstar
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the usePohľadstar
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are bePohľadstar
KAMP-EROSION CONTROL
Maccaferri proposed a cost-effective alternative solution with RENO mattresses®. Based on the different sections the mattresses had different lengthsPohľadstar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawPohľadstar
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystPohľadstar
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beePohľadstar
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyPohľadstar
LERBJERG BRIDGE, FAVRSKOV, AARHUS-LANGÅ
Maccaferri technical department was involved in the design of the geogrid reinforcement and collaborated with Aarsleff A/S to find the proper solutionPohľadstar
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of ground level wet and dry holding lagoons. These were impermeably linePohľadstar
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Pohľadstar
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengePohľadstar
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iPohľadstar
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Pohľadstar
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipPohľadstar
LV STGEGIA
The client (road authority) decided to use the most economical and effective system, the Maccaferri snow nets. It was a great challenge to install thePohľadstar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallPohľadstar
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaPohľadstar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiPohľadstar
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duPohľadstar
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesPohľadstar
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Pohľadstar
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moPohľadstar
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesPohľadstar
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a nePohľadstar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Pohľadstar
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walPohľadstar
MOTORWAY R1, BANSKÁ BYSTRICA – NORTH BYPASS, SO 100-00
The stability of the embankment is secure with a reinforcing mono-axial semi rigid geogrid. The thicknesses of the reinforced soil layers are about 40Pohľadstar
MOTORWAY SPLIT-PLOCE, RETAINING WALL STRUCTURE
For the construction of a retaining wall on the highway section Split-Ploče has been chosen the Terramesh system, because of flexible space modificatPohľadstar
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retPohľadstar
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thPohľadstar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thPohľadstar
N837 YVOIR
The choice of Green Terramesh was very well appreciated because of the environmental friendliness and the ease of construction. Moreover, geogrids (PaPohľadstar
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructurePohľadstar
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Pohľadstar
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Pohľadstar
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Pohľadstar
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to impermeably line the attenuation pond and this was accepted by client HitPohľadstar
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having removed the refuse, a separator geotextile was placed to provide a Pohľadstar
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsPohľadstar
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoPohľadstar
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPohľadstar
OOSTERWEEL VERBINDING -LINKEROEVER, G03
The maximum retaining height of the direct bridge abutment called G03 is 13m with a front inclination of 85°. For the front Terramesh units were usedPohľadstar
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPohľadstar
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPohľadstar
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aPohľadstar
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshPohľadstar
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Pohľadstar
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiPohľadstar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Pohľadstar
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAPohľadstar
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofPohľadstar
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential for differential movement were resolved by supporting the approach rPohľadstar
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Pohľadstar
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aPohľadstar
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Pohľadstar
R3 ORAVSKÝ PODZÁMOK
Consultants decided to resolve the constructions close to the Orava river with gravity retaining walls made with gabions. They choose technology doublPohľadstar
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a strong rodent deterrent. Unlike any plastic grids or thin rabbit netPohľadstar
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiPohľadstar
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizPohľadstar
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininPohľadstar
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforcePohľadstar
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Pohľadstar
REKONŠTRUKCIA SVAHOV POZDĹŽ CESTY R1-210 / 1110 – VISOKO
Riešením na zaistenie svahu bolo použitie kotvenia sieťovaním s vysokou pevnosťou. Použitá bola vysokopevnostná dvojzákrutová oceľová siePohľadstar
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in the Windsor area, was tasked by the Town of Amherstburg to devise aPohľadstar
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofPohľadstar
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was originally proposed within the design. However, the PVC coating on weldedPohľadstar
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyPohľadstar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreePohľadstar
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Pohľadstar
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedPohľadstar
ROCK SUPPORT IN VÍCAR, ALMERÍA
To address this problem, the following support measures were implemented:LEA 300-8 cable net with a tensile strength of 130 kN/m and a puncture resistPohľadstar
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringPohľadstar
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RPohľadstar
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mPohľadstar
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thPohľadstar
SAAS BALEN
Maccaferri proposed using the greenable, environmentally friendly, modular Green Terramesh earth reinforcement system. Green Terramesh consists of prePohľadstar
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshPohľadstar
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Pohľadstar
SANÁCIA HAVARIJNÉHO STAVU SVAHOV NA CESTE V ZALI
Na základe uvedenej udalosti pristúpili lokálne autority k okamžitému riešeniu havarijnej situácie a zabezpečeniu dočasných opatrení vo forPohľadstar
SCHOTEN HOOGMOLENBRUG BRIDGE 54
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moPohľadstar
SEATION TRAMWAY
The site is situated above an area of soft soil that required substantial ground improvement.The new platform area adjacent to Pohľadstar
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Pohľadstar
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VPohľadstar
SLOPE PROTECTION ON R1 NORTHERN BYPASS
Reno Mattresses were selected due to their flexibility, ease of construction and the competitive installed cost. The mattresses were placed on the slPohľadstar
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryPohľadstar
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safePohľadstar
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoPohľadstar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designPohľadstar
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fPohľadstar
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplPohľadstar
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byPohľadstar
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
Initially, a granular drain mat was installed at the PST (Upper Part of Earthworks) level to capture flows and percolations from surrounding water basPohľadstar
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaPohľadstar
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersPohľadstar
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tPohľadstar
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiPohľadstar
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Pohľadstar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaPohľadstar
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bPohľadstar
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengPohľadstar
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionPohľadstar
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacPohľadstar
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prPohľadstar
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Pohľadstar
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and implemented a tie-back reinforced gabion retaining wall to act as the slPohľadstar
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxPohľadstar
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingPohľadstar
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comPohľadstar
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mPohľadstar
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfaPohľadstar
Nenašli ste, čo ste hľadali?
Spoznajte našich odborníkov
Zastupujeme víťazného partnera pre komplexný svet civilného a priemyselného stavebníctva. Vďaka širokej škále naše produkty predstavujú odpoveď na rôzne technické požiadavky tohto odvetvia: od drenáže a ochrany, cez vodotesnosť štruktúr a krytov, úsporu energie a komfort bývania, až po kontrolu pary a problémy súvisiace s týmto odvetvím.