麦克垫
用于侵蚀控制与土体加筋的先进解决方案
Geomats 麦克垫由抗UV、不可降解的聚合物热粘结制成,这些细丝被热缠结形成三维,高度变形且高孔隙率(通常约为90%甚至更高)。 可对边坡进行长期的侵蚀防护,同时提供了一个能促进植物在土工垫上生长的环境来进一步增强土壤的抗侵蚀能力。 这些垫子能够给边坡浅层土体提供更好的侵蚀防护效果
成功案例
建成,而不仅仅是纸上画的
发现更多
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
United States
They needed to protect their new infrastructure from erosion caused by the Deadman Wash in North Phoenix Arizona. They needed to re-grade a channel that was 2 miles long, 300 ft wide and 6 ft tall to divert the storm water and prevent soil loss at the bed and banks. We also used semi-rigid hydraulic protection to suit the arid climate of the region. They needed to complete the project in a short time, with enough monetary savings and approval from the Maricopa Flood Control District. The Installation of the project was performed by BUESING Corporation Contracting.
发现更多
DIDIPIO MINE ACCESS ROAD
OceanaGold (Philippines), Inc. owns and operates the high-grade gold and copper Didipio mining project bounded by the provinces of Quirino and Nueva Vizcaya, about 270 km north of Manila, Philippines. Prior to opening the site for operation, construction of a 24-kilometer access road was required. Large portions of mountain slopes were cut for the said purpose. The cut slopes, when exposed to rain, were prone to erosion. Immediate prevention was required to address the problem.
发现更多
FESTIVAL SUPERMALL MOUND PROMONTORY
Filinvest Land Incorporated (FLI), one of the country’s top land developers, expanded and upgraded an existing shopping mall complex, the Festival Supermall, located in the southern part of Metro Manila. The mall features a scenic landscape of terrains and flats, and right at the heart of the mall's green landscapes was a proposed mound promontory. The promontory is a naturally-cut slope with average facing angle of 70 degrees. A visit to the site was first conducted in the first quarter of 2015. The top portion of the mound was planned to be used as a small park and as a viewing deck. In this, to protect the cut slopes of the mound promontory against possible erosion due to rainfall and surface runoff, FLI required a slope protection system.
发现更多
使用场景:
麦克垫
联系我们
[contactForm_txtSuccessSubmit]