排水土工复合材料
高效排水与过滤
排水复合材料是在排水芯材外热粘成一层或两层具有反滤功能的土工布组成。具有过滤、排水、隔离、防渗和保护等功能。 但其主要功能还是排水,因此,复合材料的长期排水性能必须得到保证(压缩蠕变流量变化、过滤效率等)。
成功案例
建成,而不仅仅是纸上画的
发现更多
DILMUNIA GRAND CANAL & MARINA (DGCM)
Bahrain
Ithmaar Development Company is developing the reclaimed island of Dilmunia on the north-eastern coast of the island of Muharraq, Kingdom of Bahrain. The development project includes the construction of a nearly 1. 5 km leisure canal (Dilmunia Grand Canal), which will be the central attraction of the island's architectural design, including water activities, fountains, cascades, and waterfalls. Dilmunia canal is elevated few meters above the surrounding ground level, and any potential leaks may become visible and are highly undesirable. Therefore, the project foresees to waterproof the canal structure with various geosynthetic products, including several complementary watertight and drainage elements either installed inside and outside the peripheral walls.
发现更多
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The Micorosa area, designated as a National Interest Site (SIN), posed significant environmental challenges due to the presence of an industrial waste landfill. The critical environmental levels in this SIN area necessitated a permanent security intervention. The project, authorized by the Italian Ministry of the Environment, aimed to address the persistent issues through capping and physical girdling using a plastic diaphragm.
发现更多
Museum of the Future - GREEN COVERAGE AND DRAINAGE SYSTEM
United Arab Emirates
The Museum of the Future (MOTF) is a unique initiative by the Dubai government that explores the future of science, technology, and innovation and will be located at a prime spot in Sheikh Zayed Road and near the Burj Khalifa. The architect Kila designed MOTF in three main parts: the lower green hill, the upper building, and the elliptical void, representing earth, mankind & innovation, respectively. The inspiration for the green hill was also to elevate the building calmly and unobtrusively above the metro line and create greenery in elevation where visitors can enjoy while engaging with the Museum. The green hill is to be done through a smooth transition from the site as an earthen, vegetated mound with a minimal visible built intervention. A three-story podium structure will be embedded inside the green hill, which will house the lobby, auditorium, cafés, restaurants, retail, car parking, etc. For the aforementioned reasons, the vegetated mount must be done as a THIN CLADDING of varying slopes rather than a solid earth hill.
发现更多
深入了解
排水土工复合材料
使用场景:
排水土工复合材料
联系我们
[contactForm_txtSuccessSubmit]