马克菲尔MacRes 系统由高强度聚酯纱线制成,包含预制混凝土面板和 ParaWeb 增强层。表面覆盖聚乙烯涂层作为化学屏障,即使在高度侵蚀性的环境中也能最大限度地降低化学侵蚀的风险。 ParaWeb 加筋土与预制混凝土面板机械连接,主要用于基础设施和城市环境,作为传统垂直结构的替代物以保留土体,其特点是具有高摩擦和拔出性能。
成功案例
建成,而不仅仅是纸上画的
发现更多
BRUG VAN DEN AZIJN
De Vlaamse Waterweg (Flemish Waterway Authority) invested more than 15 million Euro in the construction of the new Burgemeester Eduard Waghemansbrug, better known as Brug van den Azijn. 12. 5 million were dedicated to the bridge construction while 2. 5 million for the widening of the N130 between the district of Merksem and Deurne. The project included bus lanes in both directions, a one-way cycle lane, and a pedestrian path. The abutments were designed to support a 123 m span arch bridge, approximately 16 m wide. The new bridge clearance was targeted to be 9. 1 m high, allowing the passage of ships with four layers of containers. The architects of the project designed an articulated façade for the bridge structures. Therefore, the reinforced soil walls and the true abutments were designed with a 75° inclination.
发现更多
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
Congo
The extension project of the Corniche road in Brazzaville is part of a larger construction contract involving urban developments in the Bacongo and Makélékélé neighborhoods. The extension of the Corniche road to a 2x2 lane configuration covers approximately 5 kilometers between the Djoué Bridge and the Case de Gaulle. The route, on a slope, runs along the Congo River and requires the construction of several support structures. The technical solution specified in the contract was a patterned concrete L-wall with reinforcement of the embankment using geotextile boudins. Maccaferri proposed an alternative solution with a reinforced embankment featuring patterned concrete facing Macres®, which was favored by the company as it met the technical and aesthetic requirements of the project while significantly saving installation time and providing overall cost savings.
发现更多
Rehabilitation due to Undermining in Villalobos
There is a significant erosion issue posing a risk to the stability of the area. Due to the erosion caused by a transverse culvert, the safety factors of the slope are compromised, exacerbating the situation. Additionally, the presence of a river at the base of the slope, flowing into the southern basin of Guatemala, exacerbates the problem due to flooding and ongoing rains that continue to erode the area. A protective structure with metal mesh DT is required to safeguard the integrity of the infrastructure.
发现更多