MacRes混凝土面板
实现卓越土体加筋的创新挡墙系统
马克菲尔MacRes 系统由高强度聚酯纱线制成,包含预制混凝土面板和 ParaWeb 增强层。表面覆盖聚乙烯涂层作为化学屏障,即使在高度侵蚀性的环境中也能最大限度地降低化学侵蚀的风险。 ParaWeb 加筋土与预制混凝土面板机械连接,主要用于基础设施和城市环境,作为传统垂直结构的替代物以保留土体,其特点是具有高摩擦和拔出性能。
Success Stories
Built, not just drawn
Discover more
BRUG VAN DEN AZIJN
De Vlaamse Waterweg (Flemish Waterway Authority) invested more than 15 million Euro in the construction of the new Burgemeester Eduard Waghemansbrug, better known as Brug van den Azijn. 12. 5 million were dedicated to the bridge construction while 2. 5 million for the widening of the N130 between the district of Merksem and Deurne. The project included bus lanes in both directions, a one-way cycle lane, and a pedestrian path. The abutments were designed to support a 123 m span arch bridge, approximately 16 m wide. The new bridge clearance was targeted to be 9. 1 m high, allowing the passage of ships with four layers of containers. The architects of the project designed an articulated façade for the bridge structures. Therefore, the reinforced soil walls and the true abutments were designed with a 75° inclination.
Discover more
The Ash Yard of the Thermal Power Plant
The Punta Catalina thermoelectric power plant is the most important electricity generator in the Dominican Republic, as it produces 30% of the country's electricity. Its source of generation is coal, and as a byproduct of this process, residue known as ASH is produced. This ash is destined for confined cells due to its high content of heavy metals, preventing environmental damage to both the subsoil and the dispersal of volatile ashes in the air.
Discover more
Rehabilitation due to Undermining in Villalobos
There is a significant erosion issue posing a risk to the stability of the area. Due to the erosion caused by a transverse culvert, the safety factors of the slope are compromised, exacerbating the situation. Additionally, the presence of a river at the base of the slope, flowing into the southern basin of Guatemala, exacerbates the problem due to flooding and ongoing rains that continue to erode the area. A protective structure with metal mesh DT is required to safeguard the integrity of the infrastructure.
Discover more
What we can do with
MacRes混凝土面板
Get in touch with us
[contactForm_txtSuccessSubmit]