挑战

They needed to protect their new infrastructure from erosion caused by the Deadman Wash in North Phoenix Arizona. They needed to re-grade a channel that was 2 miles long, 300 ft wide and 6 ft tall to divert the storm water and prevent soil loss at the bed and banks. We also used semi-rigid hydraulic protection to suit the arid climate of the region. They needed to complete the project in a short time, with enough monetary savings and approval from the Maricopa Flood Control District. The Installation of the project was performed by BUESING Corporation Contracting.

解决方案

Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion along the channel, they installed a series of sloped weirs that lowered the bed gradient. Each weir was about 300 ft wide and 80 ft long, and they were spaced about 340 ft apart. We also used slope mattresses to cover the curved slopes. The materials that were used included 7600 CY of 9” Reno mattresses, 7750 CY of 12” gabion mattresses, 2800 CY of 3’x3’ gabions and 64,000 SY MacTex N59.1. The Installation of the project was performed by BUESING Corporation Contracting.

下载 成功案例

DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE

下载
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *