This site was known to be underlain by historical mine workings in a limestone layer of the Upper Oil Shale Group of the Carboniferous Age, and in this area, it is known to be a particularly thick stratigraphic unit.

An assessment of the potential for mine-related collapses or subsidence found the seam was last worked in 1898. Subsequent intrusive investigation works found up to 10m thick open voids in one area. The recommendation was for the area to be sterilized and a high-strength geosynthetic to be used to safeguard against future collapses at the surface.

The developer planned to make use of the sterile area to create a children's play area, shaped earth mounds and a SuDS pond to attenuate surface water runoff.

解决方案

The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution.

The proposed site topography was complex as it included a number of mounds, slopes and a SuDS pond along with a meandering footpath network to connect with neighbouring districts. To fully understand and analyse the requirements Maccaferri built a 3D model of the site. This digital modelling approach enabled the identification of two discrete areas on the site, and optimise the design by using different strengths of geogrid appropriate to the local conditions in each area.

The structure of the product and technology used in the manufacture of ParaLink® means that during the design process, a lower material partial safety factor can be used compared to other geogrids. This, coupled with the analysis from the model completed a design which utilised 200kN and 400kN strength geogrids and consequently a significant cost reduction compared to a proposal by other alternative geogrids which required 600kN strength across the site. The design was in accordance with BS8006-1:2010+A1:2016.

As the construction phase started ParaLink® was delivered to the works programme directly from the Maccaferri factory in West Yorkshire. Maccaferri We worked closely with the contractor and shared the digital model to incorporate the ParaLink® extents in the project earthworks software. 

下载 成功案例

VOID SPANNING IN HOUSING DEVELOPMENT

下载
VOID SPANNING IN HOUSING DEVELOPMENT

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *