TERZO VALICO DEI GIOVI - GENOVA JUNCTION

年份
2023
地点
GENOVA - LIGURIA - ITALY
客户
Rete Ferroviaria Italiana (RFI)
设计者
COCIV / Rocksoil

挑战

The Terzo Valico dei Giovi is an ambitious project aimed at enhancing the Italian railway network, particularly the Genoa Node - Campasso Route. This initiative is crucial in improving both national and international connectivity, facilitating the transportation of goods and passengers. However, the excavation phase has encountered substantial geological complexities, resulting in significant challenges. The instability of the mass and the distress of the primary lining have necessitated the installation of struts to ensure stability at the excavation front and prevent delays in project progression. A primary focus is on mitigating risks for workers and expediting the primary lining phase to ensure that operations continue without impediment. These challenges not only impact production but also raise concerns regarding the safety and timeliness of ongoing operations.

解决方案

Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a length of 3.7 kilometers) along with fiberglass reinforced solutions (GFRP) pipes (installing 250,000 meters). The decision to adopt this solution was influenced by its distinct advantages. 

The automation of the Automated Tunnel Rib facilitated installation without manual labor at the front, whether during lifting or connecting to the preceding Automated Tunnel Rib using automated links. This method significantly contributed to the stability of the excavation, allowing the final linings to be positioned further from the front, thereby enhancing production rates. The uniqueness and advantages of our solution are evident. The automated installation, eliminating the necessity for onsite labor, ensures not only speed and precision in execution but, more importantly, a remarkable increase in worker safety. This streamlined process not only ensures operational efficiency but also maintains a high standard of accuracy, distinguishing our approach in terms of both safety and productivity.

下载 成功案例

TERZO VALICO DEI GIOVI - GENOVA JUNCTION

下载
TERZO VALICO DEI GIOVI - GENOVA JUNCTION

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *