RINGFIETSPAD ANTWERP

年份
2019
地点
ANTWERP - ANTWERP - Belgium
客户
Texion Geosythetics N.V.
设计者
Tractebel Engineering N.V.

挑战

This project has implied reinforced soil wall design, material supply and installation for a high-speed bike lane between the neighborhood of Deurne and Borgerhout in the city of Antwerp (Belgium). The main contractor was the Colas Group. Tractebel Engineering N.V. made the whole design with several different inclinations of the RSS to give a more natural and pleasant view. The walls were built along a very trafficked highway and they were aimed to act as a sound barrier for the houses in the suburban neighborhood as well. 

解决方案

Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh Green Light that was produced specifically to meet the design requirements and slope inclinations. The project included also welded gabions walls and RSS built using EPS blocks to reduce the weight of the walls since the poor bearing capacity of the soil in situ. The construction took place between May 2019 and November 2019. In May 2020 the slopes were already completely vegetated.

下载 成功案例

RINGFIETSPAD ANTWERP

下载
RINGFIETSPAD ANTWERP

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *