MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH

年份
2021
地点
LAMBAGARH - UTTARAKHAND - India
客户
NH-Uttarakhand PWD
设计者
Casta Engineers and Byucksan India Pvt Ltd JV

挑战

Lambagarh slide is located on NH-58, the road leading to the holy shrine of Badrinath which receives large number of visitors every year. The slide is very steep with an average inclination of 60°, near vertical at the crest and 34-38° below the road. Alaknanda river runs along the toe of the slide. Deep gullies can be seen on the face of the slide due to surface runoff, leading to erosion of fines, loosening of boulders, toe cutting and formation of overhangs. This area comes under chronic slip zone with slides hampering traffic every rainy season. In 2013, the road was badly damaged because of landslide caused by the flash floods.   The main causative forces were:• Toe erosion by river Alaknanda. • Water seepage (glacier melting).• Rainfall (triggers the surface erosion). • Steep slope. • Anthropogenic activities. The site faced challenges of limited uninterrupted working period of only 5 months, clearances, maintenance of existing roads and slides on hill side. The client was looking for an effective and innovative solution to protect the road from landslides. 

解决方案

Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting of the existing road from its current location through construction of a flexible reinforced soil wall (RS wall) with gabions as facia (Maccaferri Terramesh® system- 3m*1m*1m and 0.5m with 2m long integrated tail) and high strength geogrid (ParaLink®) as reinforcement towards the valley side. This counteracted the destabilizing forces due to heavy hill surcharge with seepage. The height of the wall varied from 27m to 44m and length is 500m. The stones and backfill material for the wall were locally sourced hence making the solution economical with low carbon-footprint. Structure was protected from scour and boulder hit with RCC jacketing upto a depth 5m below bed level.  A rockfall embankment (using back to back Terramesh® and ParaLink® reinforcement) of 320m length and 10m height was constructed at hill side toe to protect road from direct impact of falling debris and rocks. A new flexible pavement was also constructed as part of the project.

下载 成功案例

MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH

下载
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *