年份
2023
地点
ZAVENTEM - FLANDERS - Belgium
客户
Werken aan de Ring
设计者
Smet-F&C nv

挑战

The construction of part of the new Hector Hennaulaan bridge over the R0 motorway in the municipality of Zaventem, Belgium, required the construction of new access roads to the bridge. The designer adopted the solution, where the two

access ramps had to be built using a reinforced soil structure. The choice of Mineral Terramesh was very well appreciated because of the ease of construction and

because of the nice external finishing. Moreover, the Municipality did not want to carry any maintenance of green facings under the bridge abutments, therefore the stone facing has been very well appreciated by the public authority. on the contrary, the green facing of Green Terramesh was adopted for all other reinforced soil structures, creating a more pleasant and natural facing.

解决方案

Maccaferri´s Corporate Technical Department, in cooperation with the local partner TEXION, has proposed an optimised solution with has supported the main designers step by step from the first preliminary Global and Internal stability checks with

Limit Equilibrium Method (LEM) analyses carried out with MacStars Software.

The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex, considering the design combinations DA 1.1 and DA 1.2. The possibility of modifying the units to follow the exact shape of the bridge has been very well appreciated by the contractor

Besix.

A total amount of 1650 sqm of facing of Mineral Terramesh and 1870 sqm of Green Terramesh units were in total installed during the construction works.

下载 成功案例

下载

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *