Gabion Defense - Cajuca East Corridor

年份
2020
地点
NAZCA - ICA - Perú
客户
CONSORCIO CAJUCA
设计者
MUNICIPALIDAD PROVINCIAL NAZCA

挑战

Given the events following the El Niño phenomenon in 1998, the Nazca Valley has been affected by river overflow and ravines. The high vulnerability to overflowing on the right bank of the natural drain in the Cajuca area of the Nazca district poses a latent danger to the entire population of the populated centers Cajuca I, II, and Buena Fe.

解决方案

The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determined as a solution is the dredging and channeling through a river defense structure with gabions and an anti-undermining base of 1,300 meters on the right bank of the natural drain of Cajuca. Maccaferri provided technical advice to the Cajuca consortium, responsible for the execution of the project, in order to ensure the optimal functionality of the project and the completion of the construction process.

下载 成功案例

Gabion Defense - Cajuca East Corridor

下载
Gabion Defense - Cajuca East Corridor

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *