EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA

年份
2020
地点
SUMEDANG - JAWA BARAT - Indonesia
客户
MCC-WIKA-NINDYA-WASKITA JOINT OPERATION

挑战

Cut slopes at Cisumdawu Toll Road (Phase II – Tunnel Area) are prone to soil erosion due to its vulnerability to rainfall and lack of vegetation on the slope surface. The selection of proper material was necessary in order to provide an integrated and comprehensive solution. Erosion Control Solution by Maccaferri Indonesia was selected considering its ability to allow surface seepage and to grow vegetation (LCC – Legume Cover Crop). Permanent Open Drainage (Vertical and Horizontal) is constructed on the cut slopes and it enhances controlling the surface water flow.

解决方案

The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 Pengendali Erosi Lereng” following the inclination of the slopes, the suitable material is “Tipe II – Selimut Pengendali Erosi Polimer”. Hence, the material MacMat EM was selected. MacMat EM is made from UV Stabilized HDPE Geomat. The polymeric Geomat controls surface soil erosion and helps to propagate vegetation. An array of mulching contained seeds was applied onto the MacMat EM to bring vegetation. Available in rolls of 2m x 30m, MacMat EM was installed with the support of a T-shape deformed bar to hold the material on the cut slopes. Erosion Control System by Maccaferri Indonesia has great advantages such as: • Easy and Convenient Installation; • Available for Combination with Soul Nailing for Slope Stabilization; • Allows drainage on the surface of the slope; • Vegetation as Rehabilitation; • Economically Competitive.

下载 成功案例

EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA

下载
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *