DEBRIS FLOW PROTECTION LERINI STREAM

年份
2015
地点
BAJRAM CURRI - KUKES - Albania
客户
Korporata Elektroenergjitike Shqiptare (KESH)
设计者
EBS sh.p.k, Tirane

挑战

Lake Komani in Bajram Curri, Albania, was constantly threatened by debris flow from Lerini-Salca stream, growing this way the water level in the lake and giving the dam additional and artificial charges, also separating the lake in two parts. The strong water flows generated this way were creating difficulties for the ship which sail in the lake.

解决方案

After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effectiveness, designing and full supplying and technical support on the job site. The barriers installed are 3 Debris Flow Barrier 200 DF (200 KJ), one after the other 5 meters high, two of which are 20 m long, one 40 m long. The two 20m long DF barriers were fixed with 2 columns, the 40 m long one was installed with three columns, separating the length of the barrier in 4 pieces.

Each horizontal meter of the Mac Ring Net was reinforced with wire rope diameter 22 mm. Maccaferri Ring Nets have the highest strengths of any mesh in the Mac.RO Systems range. With high strain performance, Ring Nets are ideal for situations where there is a high risk of dynamic impacts.

Maccaferri Ring Nets can accommodate these high local stresses without sustaining damage.

Upon impact with the debris flow, the DF Barrier progressively deforms due to compression release brake and the system absorbes energy.

Maccaferri DF Barriers offer strength and high performance without the aesthetic intrusion of other debris flow systems.

下载 成功案例

DEBRIS FLOW PROTECTION LERINI STREAM

下载
DEBRIS FLOW PROTECTION LERINI STREAM

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *