CANTERA ZIORDIA

年份
2021
地点
ZIORDIA - NAVARRA - España
客户
Cantera de Ziordia
设计者
CRS Ingeniería

挑战

The Ziordia quarry has an orography formed by limestone rock, with steep slopes as a result of quarrying, and potentially unstable large blocks. The company CRS Ingeniería contacted Bianchini Ingeniero to analyse the situation and possible solutions, and subsequently the company Inaccés Geotècnica Vertical also intervened. One of the main risks was the blocks that could fall from a 40-metre-high, 15-metre-wide mochón, located on one of the quarry's usual passageways. This represented a potential risk for the installations and the workers themselves. Therefore, a series of actions were carried out to stabilise these blocks and protect the area.

解决方案

To secure the area, two types of actions were carried out: 1. An "active" solution to prevent the larger blocks from being mobilised. This system consists of: - ICAF 44 double cable flexible anchors, which fix the unstable blocks to the part of the rock massif that is sound. - HEA 300x300-10 cable net, a cable net with a wire knot of very high resistance and rigidity, which retains the unstable blocks as a girdle. - Steel cables, which distribute the tensions of the cable net to the flexible anchors embedded in the ground. 2. In addition, a "passive" solution, consisting of: - A dynamic barrier RB 3000, 6m high and 150m long. The function of this barrier is to stop the smaller blocks that could fall so that they do not affect the quarry installations. Both the HEA 300-8 cable net and the dynamic barrier have CE marking and full-scale tests in accordance with current regulations, which guarantees their performance.

下载 成功案例

CANTERA ZIORDIA

下载
CANTERA ZIORDIA

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *