挑战

Gridliance West Transco planned to expand its 230KV transmission system in Boulder Nevada. A Hydraulic Channel was needed to divert and protect from the rainstorm water coming from the Sloan Canyon Mountains. The Channel had to circumvent the expansion pad that stores the new power station.

Several options were considered such as concrete, soil cement and rip rap. Due to steep differences in elevation, The channel required three vertical grade control structures up to 13 feet high, retaining walls up to 21 feet in height and 39 feet wide. With the channel length close to 950 ft, the flows were approximately 900 cubic feet per second, and the presence of corrosive soils was noted.

解决方案

Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel and mass gravity walls.

The materials specified included 12-inch-thick Reno Mattresses for the bottom of the channel as an erosion control measure and Gabions for the Mass Gravity Walls with the purpose to provide stability to the channel banks and the vertical weirs.

Further considerations for this project involved using Galvanized & PVC Coated Gabions to prevent the steel from corrosion caused by corrosive soils in the area. A Filter Fabric was needed to provide the separation from the soil and the Gabions.

Maccaferri MacTex N47.1 was specified to prevent loss of fines in the bottom of the structure. The structure required 4" to 8" rock that was readily available within the Area, providing substantial savings when compared to Concrete, soil cement and big rip rap.

下载 成功案例

BOB 230KV SWITCHYARD

下载
BOB 230KV SWITCHYARD

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *