AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL

年份
2021
地点
APPROACH ROAD TO ROHTANG TUNNEL SOUTH PORTAL - HIMACHAL PRADESH - India
客户
Border Roads Organisation (BRO) - ROHTANG
设计者
MACCAFERRI ENVIRONEMNTAL SOLUTIONS PVT. LTD.

挑战

Atal Tunnel (formerly Rohtang Tunnel) is a strategic all-weather highway tunnel and one of the longest road tunnels in India. Being built on extremely challenging Himalayan terrain, the overall alignment and its vicinity is prone to many natural hazards such as cloud bursts, earthquakes, landslides, rockfalls, avalanches etc. Many locations along the approach road to the Manali south portal (MSP) have been susceptible to snow avalanche events, which have been causing considerable harm to people, infrastructure and machinery. Some critical locations, such as MSP 11 (at km 10.5) are identified near the MSP where avalanche paths are identified with starting (formation) zones located at very high altitudes of approx. 3100m above, where avalanche control structures are required to be provided. The reported snow thickness at MSP 11 is approx.4m.

解决方案

Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErdoX) units are selected for MSP 11. Snow ErdoX units are advanced avalanche protection system, which are self stable and has metallic structure with pyramid shape, lesser weight, easy to transport and quick to install. As the snow accumulates on the slope, these innovative control measures retain the accumulated snow pack, thus preventing the initiation of an avalanche. Based on functional design, 10 lines of Snow ErdoX barriers (120 no.s (external reinforced units and internal unreinforced units) are constructed to constitute a total stretch length of 469m. The design of Snow ErdoX is based on Swiss technical guideline(2007). The lines are spanning above and below the highway based on the min. spacing calculated and overall identified formation area with individual Snow ErdoX units installed at distance of a 50 cm from each other(to allow the passage between the structures, which is prevented by traditional barriers). The end units on each of the barrier lines shall be of reinforced type. The foundation system of Snow ErdoX units are of anchors -SDA-32mm and pull out tests are performed to verify the bond strength considerations. 

下载 成功案例

AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL

下载
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *