44 YEAR OLD GABION STRUCTURE

地点
DOWNDERRY - CORNWALL - United Kingdom
客户
Caradon District Council
设计者
Maccaferri Construction

挑战

Adjacent to the village of Downderry the beach was affected by erosion. Tidal action undermined the toe of the cliff and threatened to cause a major slip. Properties, including a Hotel, were endangered by possible subsidence.

解决方案

As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from mass gravity gabions. The work was completed in   1971, and the threat of erosion was removed. The properties   on the cliff were also stabilized and no longer in danger of   possible subsidence. After 44 years, the gabion coating and   structure seems to show no sign of any significant damage   and the gabion structure is perfectly integrated with the   coastal environment.

下载 成功案例

44 YEAR OLD GABION STRUCTURE

下载
44 YEAR OLD GABION STRUCTURE

我们的相关
产品 成功案例

联系我们

如果您同意公司的隐私政策并已理解其内容,数据控制者将询问您是否同意按照公司隐私政策规定的方式处理您的数据,以便发送有关数据控制者提供的服务/活动的推广性通讯。 *

此外,数据控制者还将询问您是否同意将您的个人数据传输给 Maccaferri 关联公司,以及由此可能产生的欧盟境外数据传输,用于这些关联公司自身的目的,包括推广性目的(发送营销通讯) *