Optimus Point

Home > Success stories > Optimus Point

Mass Gravity Retaining Walls

2017

M1 Junction 21A, Leicestershire

Wilson Bowden Developments

Winvic Construction Ltd

BWB Consulting Ltd

Optimus Point

Problem

Optimus Point is a popular and sought-after location for warehouse/distribution in the UK and sits off junction 21a of the M1. This 65-acre site is providing industrial warehouses and distribution facilities ranging from 30,000 sq. ft. to 150,000 sq. ft.

Solution

Working for Winvic Construction, Maccaferri has provided a design, supply and installation service to construct several gabion and Terramesh System walls in various locations.

Maccaferri Construction has installed a 4.5m high Terramesh System wall to retain ground forming the plot which has been occupied by Geary’s Bakery and allow for the levelling of the site which will be occupied by James Latham timber merchants.

A 3m high mass gravity gabion wall was also constructed to the south of the plot.