SUCCESS STORIES

Success Stories

AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
BAFOKENG CIVIC CENTRE MACWALL
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaView
star
BALESIN ISLAND CLUB RUNWAY
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TView
star
BIFURCATION A10/171 ORLEANS
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7View
star
CHARLEROI HOSPITAL
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installView
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the View
star
COBHAM SERVICES HGV EXPANSION
COBHAM SERVICES HGV EXPANSION
The proposal is to increase the parking numbers by 79 new spaces, to the west of the petrol filling station (PFS). The proposal sits into the ground tView
star
DIDIPIO MINE ACCESS ROAD
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeView
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tView
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aView
star
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionView
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toView
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSERY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSERY
The chosen solution for this site was the MacWall Vertica 4° Segmental Block Retaining Wall System. ParaGrid geogrid was used as the reinforcement beView
star
GABION TERRAMESH SYSTEM USED IN ROAD WIDENING PROJECT
GABION TERRAMESH SYSTEM USED IN ROAD WIDENING PROJECT
A hybrid reinforced soil structure solution was designed by MHB Consultants to retain the highway yet minimise the impact on the surroundings. The strView
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-View
star
KINGSWAY CANAL BRIDGE : BRP
KINGSWAY CANAL BRIDGE : BRP
Maccaferri proposed that the Paralink strip system be used instead of the clients proposed multiple layer blanket system. In conjunction with Stent PiView
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiView
star
MANILA-CAVITE EXPRESSWAY
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duView
star
MERSEY GATEWAY BRIDGE
MERSEY GATEWAY BRIDGE
The whole infrastructure is one of the largest ones currently going on in the UK, and is one of the government’s top-40 priority projects. This is wView
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting View
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thView
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureView
star
NL BERGEN
NL BERGEN
The anti-erosion mat MacMat R020 is reinforced by a polyester geogrid with a tensile strength of 20 kN/m. The MacMat R020 was secured to the slope witView
star
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsView
star
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aView
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has View
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeView
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringView
star
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thView
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designView
star
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tView
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaView
star
WAITROSE JOHN LEWIS
WAITROSE JOHN LEWIS
Maccaferri were instrumental in the design and construction of over 1,000sq metres of gabion façade on a new John Lewis & Waitrose Joint Store in BasView
star
WESTERN ACCESS ROAD
WESTERN ACCESS ROAD
A basal reinforced embankment with a single horizontal layer of Paralink placed at existing ground level was required at this location due to poorer tView
star
WINCHESTER SERVICES, M3 MOTORWAY
WINCHESTER SERVICES, M3 MOTORWAY
Solution: Maccaferri gabions could fulfill all these demands. Both carriageways of the M3 remained fully open during the construction phase. The gabioView
star

Haven’t found what you were looking for?

Filter by:
Advanced Search












Meet our Experts

We represent a winning partner for the complex world of civil and industrial constructions. Thanks to a wide range, our products are the answer to the various technical demands of the sector: from drainage and protection to water and waterproofing of structures and coverings, to energy-saving to housing comfort, from steam control to issues concerning.

Need technical assistance?

We're here to help you with your next project.