44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massView
star
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,View
star
50 Year Old Reno Mattress Reventment
50 Year Old Reno Mattress Reventment
The erosion was controlled and prevented from further erosion by providing Reno mattress protection to the sand dunes. A filter geotextile was incorpView
star
A2 / A282 JUNCTION IMPROVEMENTS
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecView
star
A2 Downhill
A2 Downhill
The A2 Seacoast Road and neighbouring rail line, hug the exposed coastal strip through an area of outstanding natural beauty and, at a point a few milView
star
A38 Station Road
A38 Station Road
To ensure there were no risks of concrete spalling onto the carriageway, the Highway Agency asked its consulting engineer Parson Brinkerhoff (PB) for View
star
A45 PICKFORD GREEN INTERCHANGE
A45 PICKFORD GREEN INTERCHANGE
Throughout 2022 Maccaferri worked closely with project designers at Pell Frischmann to come up with a design solution using Paralink 600 high-strengthView
star
A5130 BUSWAY PARK & RIDE
A5130 BUSWAY PARK & RIDE
Three Green Terramesh® reinforced slopes with a total length of 240m and a maximum height of 3.6m run south from the Northfield roundabout to the BusView
star
A75 Trunk Road Asphalt Reinforcement
A75 Trunk Road Asphalt Reinforcement
It was decided that this section of the road be reconstructed by incorporating Maccaferri’s Road Mesh™, double-twist wire mesh, and reinforcing meView
star
A82 Pulpit Rock Improvements
A82 Pulpit Rock Improvements
McLaughlin & Harvey won the design & build contract which included earthworks, the formation of new rock cuttings, rock mass stabilisation, coView
star
A90 Trunk Road Scheme
A90 Trunk Road Scheme
Consulting Engineers for the project, Fairhurst Partners selected a soil nailing solution in conjunction with Maccaferri Geomac System; an innovative View
star
A93 Craighall Gorge
A93 Craighall Gorge
Maccaferri submitted a design comprising a hybrid reinforced earth geogrid wrap-around structure, in conjunction with a hard, stone-faced Gabion TerraView
star
AGRIPORT, MAYDON WHARF
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have View
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MView
star
Alexandar Stadium
Alexandar Stadium
An 8.0m high stone-filled Gabion Terramesh® facing wall placed approximately 5.0m from the stadium building and stepped back at each 1.0m high courseView
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5View
star
ASTON HOTEL ANYER BREAKWATER STRUCTURE
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tView
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosView
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AWPR A96
AWPR A96
The bridge, which was sub contracted to Balfour Beatty, began late in 2015 and stayed in place for 6 months until building works were complete. WorkinView
star
AZUDES SITIO RAMSAR RÍO DESAGUADERO
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxView
star
B6454 Pinkie Road Asphalt Reinforcement Trial
B6454 Pinkie Road Asphalt Reinforcement Trial
Road Mesh™was installed within both 100mm and 250mm overlays. A 250mm overlay with a glass fibre geogrid reinforcement was also installed in an adjaView
star
B7052 Whauphill Highway Improvements
B7052 Whauphill Highway Improvements
A mile-long section of this rural road at Whauphill was badly affected, due to the highway being constructed on soft ground. This section was rehabiliView
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsView
star
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall View
star
BBC Cardiff
BBC Cardiff
A free-standing double-sided welded wire Gabion wall created a ‘cliff face’ appearance using locally sourced sandstone paving off-cuts as the infiView
star
BE-ANTWERP MALINAS
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned View
star
BE-MECHELEN R6
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tView
star
BEAVERNETTING EVERTSOORD
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bView
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trView
star
Birnam Crescent Housing Development
Birnam Crescent Housing Development
Maccaferri Construction was awarded the contract by Ground Developments Ltd (GDL) to design, supply and install a retaining structure to retain the siView
star
Black Rock Quarry
Black Rock Quarry
The solution proposed was Maccaferri DT mesh to the upper two faces and Maccaferri Steelgrid HR100 PVC to the lower face. The mesh was fixed with at tView
star
BOB 230KV SWITCHYARD
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aView
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that View
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to View
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshView
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshView
star
Boston’s Boatyard
Boston’s Boatyard
The principal designer CGL was appointed to provide detailed geotechnical design and engineering supervision during construction. The following desiView
star
Brigsteer Road, Kendal
Brigsteer Road, Kendal
In order to achieve vegetation growth along the slope, topsoil was required and due to the gradient, any unsupported topsoil would be washed down to tView
star
Brookhouse Farm
Brookhouse Farm
Maccaferri were approached by contractor Alun Griffiths to offer an engineered retaining wall solution to meet the requirements of the AIP. The chosenView
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenView
star
BRUG VAN DEN AZIJN
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concreteView
star
C46 Road Rehabilitation, Galloway Forest Park
C46 Road Rehabilitation, Galloway Forest Park
The road was rehabilitated in 2001 with a 60mm Road Mesh™ reinforced overlay. Road Mesh™ was designed for use within the bituminous bound layers oView
star
Canning Town Phase 2
Canning Town Phase 2
The first task to be solved was the diaphragm wall. The diaphragm wall has been constructed from the existing ground level. A prepared working piling View
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisView
star
Catalan Bay Road Protection
Catalan Bay Road Protection
The project comprised the installation of fixed galvanised heavy steel H beams with Maccaferri HEA panels suspended between. While lacking the technicView
star
CATO MANOR PIPELINE & ROAD PROTECTION
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiView
star
CHOI YING ESTATE DEVELOPMENT
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assembleView
star
CLIPPER WASH BANK PROTECTION
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lView
star
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6  feet tall. The proposed channel sidewalls will be stabilized   with gabiView
star
Coastal Erosion Control At Airport
Coastal Erosion Control At Airport
Project Consulting Engineers, Pick Everard designed a robust revetment that could withstand the exposure conditions. The 500m long revetment structurView
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the View
star
COBHAM SERVICES HGV EXPANSION
COBHAM SERVICES HGV EXPANSION
The proposal is to increase the parking numbers by 79 new spaces, to the west of the petrol filling station (PFS). The proposal sits into the ground tView
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal View
star
Coed Darcy Development
Coed Darcy Development
Phase one of the development St Modwen homes development required a retaining structure to stabilise an exposed rock face and also create garden/ walkView
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightView
star
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). View
star
Cookbridge Rail
Cookbridge Rail
The main contractor Volker Fitzpatrick approached Maccaferri for the supply of a suitable mesh product for the stabilisation of the rail cutting. MaccView
star
ÇÖPLER GOLD MINE ROCK FALL PROJECT
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic View
star
Croft Avenue Developments
Croft Avenue Developments
The designer chose to accept Maccaferri’s high strength, high stiffness geocomposite product Steelgrid to act as the facing to the anchors chosen toView
star
Cycleway Ramp & Footing
Cycleway Ramp & Footing
Maccaferri proposed the use of the Green Terramesh® reinforced soil retaining system to create the upper and lower retaining structures. Green TerramView
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basView
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonView
star
DEBRIS FLOW PROTECTION LERINI STREAM
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeView
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tView
star
Dudley Ward Road Reopening
Dudley Ward Road Reopening
Following their research, Golder Associates proposed a combination of rockfall mitigation measures to protect the 500 m-long stretches of road leadingView
star
Dunball New Bridge
Dunball New Bridge
To repair and avert possible future problems, work under Dunball Old Bridge was followed up by a Somerset County Council scheme to repair and strengthView
star
Dynamic Barriers – Long Term Study
Dynamic Barriers – Long Term Study
Following careful geotechnical assessment of the slope and detailed rockfall trajectory analysis URS’s Derby office proposed the Maccaferri CTR 10-0View
star
East Bay Link
East Bay Link
Maccaferri worked alongside Dawnus Construction Holdings to come up with a temporary work structure. Maccaferri suggested the use of FlexMac DT which View
star
Eden Brows
Eden Brows
The landslip caused the ground below the railway to slip 2.5 metres below its normal level during the weeks that followed and led to a £23 million reView
star
Edenbridge Rail Embankment Protection
Edenbridge Rail Embankment Protection
Maccaferri’s RenoMesh Anti Burrowing Mesh has been proven to be a strong deterrent to burrowing animals. Unlike any plastic ‘geogrid’ style or tView
star
Eisteddford Field
Eisteddford Field
A biodegradable woven coir erosion control matting, Maccaferri Biomac was selected to protect the new channel banks. It was pinned to the banks usingView
star
EROSION CONTROL AGAINST MAMMAL BURROWING
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required View
star
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeView
star
Erosion Control at Le Mont Gabard St Martin
Erosion Control at Le Mont Gabard St Martin
Due to the danger, the embankment could cause, the slope needed protection from erosion. MacMat® R was chosen as the best solution for this problem.TView
star
Erosion Control at Russell Homes, Saltersford Gardens
Erosion Control at Russell Homes, Saltersford Gardens
Maccaferri was tasked with proposing remedial measures to reinstate the slipped topsoil layer and provide a long-term enhanced erosion control solutioView
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aView
star
Eskmills Development River Wall
Eskmills Development River Wall
Given the importance of the riverside retaining wall to the project as a whole, both in terms of programme and quality, Maccaferri Construction Ltd waView
star
EXPO HOUSE AT DOHA EXPO 2023
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cView
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeView
star
Factory Haulage Yard Expansion
Factory Haulage Yard Expansion
Maccaferri proposed a structure up to 5m high. A balance was found between the height of the structure, the stability of the slope above the wall and View
star
FESTIVAL SUPERMALL MOUND PROMONTORY
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DueView
star
Floating Roads Trial
Floating Roads Trial
Three trial roads serving the communities of Syre, Kinbrace and Helmsdale in Sutherland, have had bituminous overlays applied which incorporate MaccafView
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toView
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSERY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSERY
The chosen solution for this site was the MacWall Vertica 4° Segmental Block Retaining Wall System. ParaGrid geogrid was used as the reinforcement beView
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system creView
star
FV17 LIAFJELLET-OLVIKVATNET
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theView
star
GABION TERRAMESH SYSTEM USED IN ROAD WIDENING PROJECT
GABION TERRAMESH SYSTEM USED IN ROAD WIDENING PROJECT
A hybrid reinforced soil structure solution was designed by MHB Consultants to retain the highway yet minimise the impact on the surroundings. The strView
star
GATEWAY SOUTH HEADWALLS
GATEWAY SOUTH HEADWALLS
Maccaferri was approached by designers Patrick Parsons and contractors Buckingham Group Ltd and asked for advice on a suitable erosion protection systView
star
Glasgow to Edinburgh Mainline
Glasgow to Edinburgh Mainline
Speed of installation was therefore of the essence and Maccaferri Construction working with First Engineering, Railtrack’s appointed contractors, waView
star
Green Facia’ to Piled Wall
Green Facia’ to Piled Wall
Due to very limited working space a very buildable solution was required. Maccaferri Green Terramesh® is a very quick and easy reinforced soil systeView
star
Hackbridge
Hackbridge
A hybrid retaining wall solution comprising 70-degree Maccaferri Green Terramesh reinforced slopes to three of the approach ramp faces and one concretView
star
Hanneys Crossing
Hanneys Crossing
The solution proposed by Tony Gee and Partners with detailed design work undertaken by Maccaferri, required the complete removal of the original rampsView
star
HAROLD COURT EAST REGIONAL SERVICE CENTER
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challeView
star
HASANKEYF ARCHEOPARK PROJECT
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysView
star
Heads of The Valleys, A465
Heads of The Valleys, A465
Slope stabilisation was an important element of the scheme, and both CAN Geotechnical and BAM Ritchies have been working closely with the Costain teamView
star
HENNEAULAAN ZAVENTEM
HENNEAULAAN ZAVENTEM
Maccaferri´s Corporate Technical Department, in cooperation with the local partner TEXION, has proposed an optimised solution with has supported the View
star
Hoel Pentre Bach
Hoel Pentre Bach
Due to the nature of the levels found at the Northern section of the site, a retaining wall was required. This was to create and support garden spacesView
star
Hoel Pentre Felin, Lllangy Fellach
Hoel Pentre Felin, Lllangy Fellach
Maccaferri was approached by George Brown Consultancy to offer alternative retaining structure solutions to meet the client's brief and budget. ThView
star
Hookbrook Link Road Bridge
Hookbrook Link Road Bridge
In December 2015, the latest phase of the Hoobrook Link Road was finalised with the construction of the bridge over the canal and river. This saw largView
star
Hope Valley Rail Line
Hope Valley Rail Line
Project designer, Mott MacDonald specified Maccaferri MacMat HS30 P as the drapery mesh element of a soil-nailed rockfall protection system. MacmView
star
Hornsea Offshore Wind Farm
Hornsea Offshore Wind Farm
Murphy contacted Maccaferri to find a solution to the problem and Maccaferri proposed to use Flexmac DT which would create the temporary retaining walView
star
HOUSING DEVELOPMENT PLOT LEVELLING
HOUSING DEVELOPMENT PLOT LEVELLING
Due to the differential levels at the west end, a reinforced soil slope was utilised. A 70-degree face Green Terramesh solution was chosen as it was dView
star
HOUSING DEVELOPMENT SITE OPTIMISATION
HOUSING DEVELOPMENT SITE OPTIMISATION
Readie Construction approached Maccaferri to provide an eco-friendly and cost-effective solution that would fit within the natural surroundings of theView
star
HOUSING DEVELOPMENT, LADY EDITH DRIVE
HOUSING DEVELOPMENT, LADY EDITH DRIVE
Maccaferri proposed the use of a range of solutions to suit the topography, geotechnics of the site and the aesthetics needed;MacWall – segmental blocView
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useView
star
I54 Development
I54 Development
Throughout 2019, Staffordshire Council and their engineering consultant Amey, engaged with Maccaferri to develop multiple proposals for a double-sidedView
star
Ightam Sands Quarry
Ightam Sands Quarry
The solution was to undertake the work in vertical strips to help alleviate the aforementioned risk. This however did create difficulties in setting oView
star
Ince Park Biomass Energy Plant
Ince Park Biomass Energy Plant
Maccaferri proposed an innovative method for designing this type of structure. The design method is based on applying the load on a defined rectangulaView
star
JD Sports Distribution Centre
JD Sports Distribution Centre
Working for Winvic Construction, Maccaferri provided a retaining wall solution which was to be installed around the perimeter of the development. The View
star
Karstic Void Spanning In Housing Development
Karstic Void Spanning In Housing Development
Maccaferri was approached to develop a geogrid-based solution to mitigate the risk of future collapses under the adoptable highways as part of a serieView
star
KGX1 Project – Google HQ
KGX1 Project – Google HQ
Maccaferri was asked to facilitate the construction by designing and supplying a temporary piling platform which would stand at 7m high. An MSE wall wView
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawView
star
KINGSWAY CANAL BRIDGE : BRP
KINGSWAY CANAL BRIDGE : BRP
Maccaferri proposed that the Paralink strip system be used instead of the clients proposed multiple layer blanket system. In conjunction with Stent PiView
star
KOSOVO MOTORWAY PROJECT
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystView
star
KURINGEN BRIDGE 19
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beeView
star
Lidl Bottling Plant
Lidl Bottling Plant
Maccaferri proposed the use of its Macline GCL W20 to impermeably line the attenuation pond and this was accepted by contractors AFS Earthmoving Ltd iView
star
LINCOLNSHIRE EFW
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of  ground level wet and dry holding lagoons. These were   impermeably lineView
star
Lincolnshire Energy From Waste
Lincolnshire Energy From Waste
Consulting engineers, Arup, devised a curved double-sided access ramp formed of opposing vertical walls of Maccaferri MacRes® concrete retaining wallView
star
LISTENING MIRRORS HISTORIC SITE
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and View
star
Llanfoist
Llanfoist
The solution provided by Maccaferri was that SteelGrid HR 30 was fit for the consolidation works. The system is a drapery high strength mesh with highView
star
Llyn Bodlyn Dam
Llyn Bodlyn Dam
Mott MacDonald Bentley (MMB) has been commissioned by Dŵr Cymru Welsh Water to carry out remedial works of the dam and a rockfill berm on the downstView
star
London Gatwick Airport Acoustic Bund
London Gatwick Airport Acoustic Bund
Consulting engineers Scott Wilson and Maccaferri worked with main contractor Carillion plc, specialist soil reinforcement installer PML Geotech and fiView
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeView
star
LU-A13 DUDELANGE-BURANGE
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000View
star
M23 JN 8 – 10 MORTORWAY IMPROVEMENTS
M23 JN 8 – 10 MORTORWAY IMPROVEMENTS
Due to the small amount of available land a traditional reinforced earth solution would not fit. For this reason, the designers chose a hybrid reinforView
star
M32 Bus Lane Bridge Extension
M32 Bus Lane Bridge Extension
A smarter way of travelling was needed to speed up bus journey times, relieve congestion and reduce pollution. As one of the many bus priority improveView
star
M4 Acoustic Bund
M4 Acoustic Bund
Maccaferri’s solution was a soil-reinforced bund with a steep-sided embankment slope, 60 degrees from the horizontal, and a shallow rear face embankView
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallView
star
M8/M74 Improvement Scheme
M8/M74 Improvement Scheme
The procurement process was tendered and the successful bidder, Scottish Roads Partnership (SRP), was a consortium with a construction joint venture oView
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiView
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesView
star
MEERHOUT BRIDGE 34
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moView
star
MERSEY GATEWAY BRIDGE
MERSEY GATEWAY BRIDGE
The whole infrastructure is one of the largest ones currently going on in the UK, and is one of the government’s top-40 priority projects. This is wView
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesView
star
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a neView
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting View
star
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walView
star
Morfa Nefyn Golf Club Cliff Edge
Morfa Nefyn Golf Club Cliff Edge
Maccaferri was contacted by specialist rockfall contractors Colin Jones Rock Engineering Ltd and asked to supply a drapery mesh that would be able to View
star
Mossmorran Rockslide Protection
Mossmorran Rockslide Protection
The site was de-scaled and suitable blocks were removed by specialist contractor CAN. Following the installation of crest and toe cables the rock slopView
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retView
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thView
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thView
star
Mythe Water Treatment
Mythe Water Treatment
Following the event and the damage caused, repair works were proposed. CiM6 requested that Maccaferri carry out a design covering the stability of a gView
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureView
star
NBAR North Bexhill Access Road
NBAR North Bexhill Access Road
The Static Method was then used for the design of the temporary haul roads and hard standings working platforms. The ground conditions encountered on View
star
NEW AIRPORT IN MOUNTAINOUS REGION
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) View
star
NEW ASDA STORE
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and View
star
NEW SHARJAH-KHORFAKKAN ROAD
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as View
star
NEW STREET RESURFACING
NEW STREET RESURFACING
Oxfordshire County Council had appointed Aggregate Industries as surfacing contractor for the project and they approached Maccaferri’s specialist asView
star
New Warehouse Extension at Allan Water
New Warehouse Extension at Allan Water
Maccaferri Ltd was approached by the project consultant for assistance in developing the channel scheme. To maintain the two-stage channel shape, whView
star
NEWHURST ENERGY FROM WASTE FACILITY
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to  impermeably line the attenuation pond and this was   accepted by client HitView
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a View
star
Oakleigh Road South Vehicle Depot
Oakleigh Road South Vehicle Depot
A reinforced pavement structure was then defined considering a subgrade CRB=1% and the use of the Maccaferri EG40S geogrid as soil stabilisation withiView
star
Olney Park Development
Olney Park Development
The client was looking for a natural finish in a cut situation. Maccaferri's Double-twist woven gabions provided an economically friendly solutionView
star
On The Right Track At Cumberworth
On The Right Track At Cumberworth
Access to the site was difficult as the cutting is some distance from the nearest road and wooded areas at the head of the cutting, making it difficulView
star
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aView
star
Optimus Point
Optimus Point
Working for Winvic Construction, Maccaferri has provided a design, supply and installation service to construct several gabion and Terramesh System wView
star
Paul’s Hill Windfarm
Paul’s Hill Windfarm
The scheme designer established general rock characteristics at the site and then demarked certain areas where the slope was deemed to be the greatestView
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiView
star
Plot Optimisation At Housing Development
Plot Optimisation At Housing Development
A 130m long structure had to have a green vegetated finish and be up to 6m in height. This reinforced soil structure was around the perimeter of the sView
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rView
star
Project Evergreen
Project Evergreen
As a conventional battered slope was not viable due to space restrictions consulting engineers Atkins proposed the construction of a near vertical 3.0View
star
Queen’s Elms Student Village
Queen’s Elms Student Village
The MacWall system, specified by Robinson and Patterson, solved these problems because of its speed of installation, flexibility and ease of constructView
star
Rail Embankment Slope Stabilisation
Rail Embankment Slope Stabilisation
A soil-nailed solution was designed by the project consulting engineer, Tony Gee. The project scope included 470 self-drilling soil nails with lengthsView
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netView
star
Railway Embankment Stabilisation
Railway Embankment Stabilisation
Cementation Foundations Skanska Ltd and their geotechnical design partner, Mott Macdonald Ltd, approached Maccaferri Ltd for assistance in identifyingView
star
RD38 – CONFORTEMENT RAVIN DE LA CHAUDIERE SAINT EUSEBE, 74, FRANCE
RD38 – CONFORTEMENT RAVIN DE LA CHAUDIERE SAINT EUSEBE, 74, FRANCE
La solution en remblai renforcé à parement végétalisable Terramesh Vert a été retenue pour son efficacité technique, sa rapidité et sa simplicView
star
Reading Viaduct – Elevated Railway
Reading Viaduct – Elevated Railway
To fit tight space constraints, Atkins conceived the solution, in their tender design, of vertical, reinforced soil walls (RSW) with discrete concreteView
star
REDROW HOMES DEVELOPMENT
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiView
star
Reinforced Slope Supporting Development
Reinforced Slope Supporting Development
Maccaferri designed a new 180m long retaining slope reinforced with Green Terramesh® units and additional Paragrid geogrids. This embankment is beingView
star
Remote Railway Rockfall Protection
Remote Railway Rockfall Protection
Network Rail conducts annual inspections and assessments of all their rock slopes and the Kyle Line is no exception. As part of their asset managementView
star
RESTAURANT SOUTHERN GATEWAY
RESTAURANT SOUTHERN GATEWAY
Maccaferri provided design and supply of materials to local contractors PGR Construction to construct a MacWall® segmental block-faced reinforced soiView
star
Retaining Wall For Bristol School
Retaining Wall For Bristol School
The chosen solution was MacWall, a segmental engineered retaining wall system. The system comprises a “split face” concrete fascia block with ParaView
star
Retaining Wall for new supermarket
Retaining Wall for new supermarket
The chosen solution was MacWall; a segmental engineered retaining wall system. The system comprises a “split face” concrete fascia blockwork wall View
star
RETAINING WALL SUPPORTING A630
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was  originally proposed within the design. However, the PVC   coating on weldedView
star
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyView
star
Richard Lee School
Richard Lee School
Maccaferri was approached by Wates Construction to provide a cost-effective solution to the retaining wall problem. Maccaferri FlexMac DT was identifiView
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in View
star
ROCK SUPPORT IN VÍCAR, ALMERÍA
ROCK SUPPORT IN VÍCAR, ALMERÍA
To address this problem, the following support measures were implemented:LEA 300-8 cable net with a tensile strength of 130 kN/m and a puncture resistView
star
Rotherhithe New Road
Rotherhithe New Road
To create a reinforced piling mat the contractor was looking for an engineering solution with a geosynthetics product, able to reinforce and reduce thView
star
Sadler’s Farm Junction Improvement Works
Sadler’s Farm Junction Improvement Works
Main contractor Birse Civils brought in Maccaferri who proposed the use of its MacRes® concrete panel-based reinforced soil system, which they were aView
star
SEATION TRAMWAY
SEATION TRAMWAY
The site is situated above an area of soft soil that required  substantial ground improvement.The new platform area   adjacent to View
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with View
star
Shutterton Park
Shutterton Park
It was then proposed to use a granular material SFHW type 6N for the 300mm depth of the load transfer platform with the lower strength site-won materView
star
Small green lung in the Metelliana Valley
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoView
star
Southam Road Acousic Barrier
Southam Road Acousic Barrier
The Client, Bellway Homes, preferred to maximise the use of normally unwanted site fill as much as possible. The material used was marginal and would View
star
SSSI Site – River Severn Estuary
SSSI Site – River Severn Estuary
As the erosion was acute, there would be no way that a soil-bioengineering solution alone (coir logs, root balls, riparian wattles etc) would offer suView
star
St Andrews Royal & Ancient Golf Club
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byView
star
St Anne’s Railway Cutting Protection
St Anne’s Railway Cutting Protection
White Young Green designed a series of interventions on the rock face to stabilise it. A mesh of high tensile cables was strapped across the sandstoneView
star
ST Ives Station Car Park
ST Ives Station Car Park
Maccaferri were the recommended solution provider and supplied the Steelgrid HR 30 PVC mesh rockfall protection system. This system entails a high-strView
star
Stewart Milne Homes
Stewart Milne Homes
With such a high structure at the Stewart Milne Homes site, a proven system needed to be selected. Reassuringly, MacWall® Landmark Walls of over 20 mView
star
SUDS PONDS ON HOUSING DEVELOPMENT
SUDS PONDS ON HOUSING DEVELOPMENT
Maccaferri MacLine GCL liners were used to provide the impermeable lining to the ponds. The MacLine GCL W20 is a geosynthetic clay liner (GCL) that coView
star
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaView
star
Sundays Hill Bypass
Sundays Hill Bypass
Paralink and Macwall were the chosen solutions for this project. The approaching embankments to the bridge were done with Macwall BBA due to the challView
star
Tarnato Quarry
Tarnato Quarry
Maccaferri proposed a 9m high reinforced soil solution using the Terramesh® System. The face of the structure was 75deg from horizontal thereby increView
star
The Avenue Stage 3
The Avenue Stage 3
Drainage was installed at the crest and toe as a mitigation measure and a sequence of soil nailing at 2m c/c was designed by Coffey Geotechnics to proView
star
Tolcarne Beach – Cliff Slope Stablisation
Tolcarne Beach – Cliff Slope Stablisation
Designed by John Grimes Partnership, the works involved drilling soil nails and anchors into the bedrock, some up to six metres in length. These will View
star
VALUE ENGINEERED WALLS FOR HOUSING SITE
VALUE ENGINEERED WALLS FOR HOUSING SITE
For the 200m long and up to 3.5m high structure, Maccaferri proposed a mass gravity gabion wall. This was built with a steep front face to maximise deView
star
Village Brow, Crawfordsburn
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingView
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comView
star
WAITROSE JOHN LEWIS
WAITROSE JOHN LEWIS
Maccaferri were instrumental in the design and construction of over 1,000sq metres of gabion façade on a new John Lewis & Waitrose Joint Store in BasView
star
Water Treatment Pumping Station
Water Treatment Pumping Station
Galliford Try—Morrison Construction (MGJV) is the main contractor and is dealing with all the works related: from the drainage connection to the pumView
star
West Benhar Wind Farm
West Benhar Wind Farm
Maccaferri was approached by Tony Gee and Partners in February 2021 to propose suitable high-strength geogrids for use as basal reinforcement for the View
star
WESTERN ACCESS ROAD
WESTERN ACCESS ROAD
A basal reinforced embankment with a single horizontal layer of Paralink placed at existing ground level was required at this location due to poorer tView
star
Whyburn Primary School
Whyburn Primary School
The MacWall Diamond system was specified by NCC after a preliminary costing exercise identified significant savings to programme and budget costs. AncView
star
WINCHESTER SERVICES, M3 MOTORWAY
WINCHESTER SERVICES, M3 MOTORWAY
Solution: Maccaferri gabions could fulfill all these demands. Both carriageways of the M3 remained fully open during the construction phase. The gabioView
star

Haven’t found what you were looking for?

Filter by:
Advanced Search












Meet our Experts

We represent a winning partner for the complex world of civil and industrial constructions. Thanks to a wide range, our products are the answer to the various technical demands of the sector: from drainage and protection to water and waterproofing of structures and coverings, to energy-saving to housing comfort, from steam control to issues concerning.