NONG SLIK WEIR RETIFICATION PROJECT

Home > Success stories > NONG SLIK WEIR RETIFICATION PROJECT

Weirs, Culverts and Transverse Structures

2020

 LAMPHOON PROVINCE -    - Thailand

Tipakorn CO., Ltd.

NONG SLIK WEIR RETIFICATION PROJECT

Problem

The objective of weirs is to reduce the attitude of the river to transport sediment material downstream, protecting at the same time river flanks. This attitude is achieved by reducing longitudinal river slope through backfilling.

Solution

Comparing all available solutions, Maccaferri Gabions and Reno Mattresses solution has the following advantages: • Permeability • Flexibility • Ease of installation • Ease of maintenance • Environmental footprint).friendliness (greening and low carbon The following products were used in order to construct the 3m height weir: Galmac Gabion 2x1x0.5 27,382 m3 Galmac Gabion 2x1x1 440 m3 Galmac Reno Mattress 2x1x0.3 2,173.20 m2 The productivity rate was equal to 0-50 m3 per man per day.

Used Products

กล่องลวดตาข่ายเกเบียน
กล่องลวดตาข่ายเกเบียน
กล่องลวดตาข่ายเกเบียน ของ Maccaferri เป็นกล่องลวดตาข่ายแบบบิดเกลียวคู่ (Doubled Twist) ที่ถูกนำมาขึ้นรูปเป็นภาชนะที่มีหลากหลายขนาด โดยภายในถูกแบ่งอView
star
กล่องลวดตาข่ายแมทเทรสชนิดเสริมประสิทธิภาพ
กล่องลวดตาข่ายแมทเทรสชนิดเสริมประสิทธิภาพ
วิธีดั้งเดิมในการป้องกันตลิ่งแม่น้ำคือการทิ้งหินที่ต้องให้มีความหนาจึงจะมีประสิทธิภาพ เนื่องจากความเป็นจริงหินไม่ได้ถูกกำหนดขอบเขตและไม่สามารถวางไดView
star