Success Stories
ALWATHUGODA RETAINING WALL
The Contractor asked the assistance of Maccaferri for a cheap and suitable slope protection system. A gravity retaining wall structure using MaccaferrViewstar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaViewstar
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TViewstar
BEACH PROTECTION IN MAURITIUS
The solution encompassed the combined usage of a GeoMac™ sea wall and a Macreef™ submerged breakwater. The submerged breakwater consisted of 2 seViewstar
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Viewstar
BLACK MOUNTAIN GOLF COURSE
After considering all the options, finally the client had accepted Maccaferri Gabion Retaining Wall as the best solution. Not only the gravity wall coViewstar
BONIFICA DISCARICA PONTONE PONTONICCHIO LESINA FOGGIA
La ditta Favellato avvierà e porterà a compimento un ampio programma di Messa in Sicurezza (MISP) della vasta area di discarica (11 ettari ovvero l’eqViewstar
BRIDGE AND RIVERBANK PROTECTION AT KOK RIVER
The Department of Rural Road (DRR) with the assistance from Maccaferri technical team came up with erosion protection system using Maccaferri gabion aViewstar
CAP MALHEUREUX CEMETERY SEA WALL
A Gabion revetment was constructed using 2x1x0,5 PVC coated gabions. The first 4 rows of the wall (2m high) were laid in HEADER fashion to absorb theViewstar
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installViewstar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Viewstar
CR110 SOFTEYE BETWEEN TAMPINES NORTH STATION AND DEFU STATION
After a comparison in terms of cost and demolition timing, the Contractor opted for the construction of a “Soft-Eye” for the launching of the TBM.Viewstar
DEBRIS FLOW BARRIER AT DISCOVERY BAY NORTH DEVELOPMENT: TOWN PLAZA
To meet the project requirements, Maccaferri dynamic barriers has been proposed for the authorities' approval. All major components of the dynamicViewstar
DEBRIS FLOW PROTECTION SOLUTION AT HIGHWAY ROUTE 225
Various options were considered, but due to time constraints from the fast approaching monsoon, the option to use open slope debris flow barriers was Viewstar
DEFENDER LANE MASS MOVEMENT REMEDIATION
The green terramesh (GTM) embankment was the chosen solution because of the long term durability of the structure, ability to withstand multiple impacViewstar
DÉPLACEMENT DIGUES SUITE À CONSTRUCTION DE LA NOUVELLE LIGNE TGV
Sur la rive droite, à Lunel, la digue définitive est conçue pour être déversante sur un linéaire de 150 m. En amont et en aval, la digue est raccordéeViewstar
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeViewstar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tViewstar
EARTHQUAKE PERFORMANCE OF GABION WALL FOR BORAL GAS
In addition to the technical requirements for the site Maccaferri NZ Ltd was also requested to offer product that would provide the maximum level of dViewstar
EAST GATE SLIP
A 2000 kJ Maccaferri RMC200A certified fence was installed at some distance from the road level to intercept any rock fall and moderate the level of sViewstar
EAST GATE SLIP ROCKFALL PROTECTION SOLUTION
The final decision was to install Maccaferri 2,000kJ certified fence – some distance from the road level to intercept any rock fall and moderate levViewstar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aViewstar
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionViewstar
EROSION PROTECTION FOR POWER HOUSE
5m height PVC Gabion wall was chosen as the best costs effective solution. It shows many advantages that are: • Permeability • Flexibility • DurViewstar
EROSION PROTECTION FOR TRASMISSION TOWER
A solution using combination of gabion retaining wall and filter fabric was proposed by Maccaferri technical team. The proposal includes: 1.0 Gabion gViewstar
FLEMINGTON RACECOURSE
A 1.6km long x 2.5m high bund wall was built along the course’s river boundary which will cope with a one-in-100 year flood event. A number of optioViewstar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toViewstar
FLYOVER AT TRAN THI LY INTERCHANGE
The system consists of a combination of geostrip soil reinforcement connected to large concrete facing panels. The ParaWeb® polymer geostrip linear rViewstar
GABIONS RETAINING WALL FOR LANDSLIDING PROTECTION
A 2 m height reinforced embankment structure with Zinc Gabions was chosen as able to reconstructed the landslide location. Gabions with its permeable Viewstar
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Viewstar
KAIKOURA SH1ROCKFALL/ SHALLOW SLIPS PROTECTION: SITE SR32
ETAG energy certified fences with a minimum kinetic energy capacity of 2000 kJ were identificated to protect the road and rail below. There are 3 fencViewstar
KELANIYA FLY OVER PROJECT
As required fast construction Gabion retaining wall is proposed extension side of bypass road which was constructed as alternative road during the coViewstar
KHA-SAT RIVERBANK PROTECTION
Maccaferri proposal of using combination of gabion and reno mattress as erosion protection system was accepted by the client because rocks which are lViewstar
KIMPO APARTMENTS
Gabion wall proposal forwarded by Achung Industry was accepted by the Clients. During the course of construction, the layout, which originally was a sViewstar
KOGGALA BEACH HOTEL RETAINING WALL
Maccaferri Gabion gravity retaining wall was recognized as the best solution for the slope protection (Swimming pool, Restaurant and Rooms area). The Viewstar
LANDSLIDE PROTECTION BARRIER AT MUELLER STREET
The landslide protection works comprise of land clearing works to remove the landslide debris, platform construction for landslide embankment, construViewstar
LANDSLIPS WITH MINERAL TERRAMESH AT EUREKA BEND
Geofabrics New Zealand (GNZ) partner of Maccaferri worked with consulting engineer GHD to design the Mineral Terramesh® system. The Mineral TerrameshViewstar
LAYAN GARDEN
Maccaferri Gabion gravity retaining wall was recognized as the best solution for the slope protection. This is due to Gabion's peculiar characterViewstar
LPMITP WORKS IN SHAM WAT ROAD, WEST LANTAU
Maccaferri 8,600kJ capacity dynamic barrier was proposed as it has undergone ETAG 027 assessment and proven to be a competent barrier. After rigorous Viewstar
MAE KHA CHANNEL PROTECTION
The galvanized Reno mattress lining designed by Maccaferri offered a more economical alternative to the Marine Department as compared to a traditionalViewstar
MAE KLONG RIVER BANK PROTECTION
The solution designed by the Harbour Department with technical assistance from Maccaferri Asia included : • Strengthening of the existing river bankViewstar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiViewstar
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duViewstar
MEAKLONG RIVERBANK PROTECTION
The solution proposed by the MD involved Galmac coated Gabions and Reno Mattresses. Reno Mattresses allow tangential river flow velocities up to 6m/s Viewstar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Viewstar
MONTAGNE COUPEÉ
The initial solution consisted in a mixed design, including a mass gravity gabion wall at the toe, and a Terramesh™ soil reinforced structure in theViewstar
MOUNT BARKER WASTEWATER TREATMENT PLANT
The large wind and wave loading resulting from the long length of baffles and the distance between them ruled out traditional baffle methods such as fViewstar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thViewstar
NAN RIVERBANK PROTECTION
Zinc Gabions (3x2x0.5) & Zinc Mattress (6x2x0.3) have been used. The gabion of 0.5m thick with 2m width has been put in the river at the toe of existiViewstar
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureViewstar
NONG SLIK WEIR RETIFICATION PROJECT
Comparing all available solutions, Maccaferri Gabions and Reno Mattresses solution has the following advantages: • Permeability • Flexibility • Viewstar
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsViewstar
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aViewstar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Viewstar
PRACHUABKIRIKHAN BAY RENOVATION
Maccaferri was approached by the client to provide the most suitable solution to prevent further deterioration of the shoreline. After careful studiesViewstar
PRACHUAP KHIRI KHAN BAY PROTECTION
For several years, systems using double twisted wire mesh have been performed successfully in civil engineering applications. This is due to their pecViewstar
REDBANK TUNNEL DEVIATION
Macmat R was chosen not only for its effectiveness as a unique solution but also for the substantial cost saving realized by requiring only one singleViewstar
REMEDIATION AND ENVIRONMENTAL RESTORATION OF THE MUNICIPAL DUMP
L’impiego del sistema terramesh “Liner” costituito dal sistema Terramesh Verde o Liner con inserito all’interno un cassero sul quale è stato posto un Viewstar
RENOVATE OF WATER CANAL DR 2.8 AND DR 15.8
The first section of canal is connected to the big main river Nan, 1m thick Gabions have been chosen to protect the bed of canal from erosion, the widViewstar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeViewstar
RIVERVIEW MINING SUBSIDENCE
Commonly used remediation measures for subsidence caused by voids are wide-scale grouting of the underground cavities, providing structural bridging uViewstar
ROAD EMBANKMENT RETAINING WALL FOR KENGTENG BYPASS ROAD
The Paramesh system has been used in three different locations along the 10km road. The walls are around 6m high and the design has been done with MViewstar
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringViewstar
ROCKFALL PROTECTION AT BHUMIBOL DAM
Macacferri proposed simple drapery system as the most effective and economical solution to protect the dam from falling rocks. It consist of double twViewstar
ROCKFALL PROTECTION SOLUTION AT NGAU CHI WAN PARK
Maccaferri is involved in the project since preliminary design stage up until handover of the dynamic barriers to the client. The accepted proposal Viewstar
ROCKFALL PROTECTION SYSTEM AT KAENG KHOI CEMENT PLANT
Maccaferri worked closely with the Client’s Consultant to come up with a cost-effective and optimum rockfall solution. The consultant has consideredViewstar
ROCKFALL PROTECTION SYSTEM FOR ROUTE NM1016, KORAT
The source of rockfall is located on high and steep slope hence intervention measure close to point of rockfall is difficult and dangerous to construcViewstar
ROCKFALL PROTECTION WORKS FOR PYLON CY288
The proposed solution is a combination of two approaches to arrive at an effective outcome. High risk larger rock outcrops were removed through scalinViewstar
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thViewstar
SH6 MEYBILLE BAY
After identifying the most probable boulder size and rigorous detail rockfall trajectory analysis, Opus has ascertained the most suitable rockfall proViewstar
SH73 BELOW STARVATION POINT
The client had accepted a proposal to install a debris flow fence (without posts) with the capacity of capturing 300m³ debris volume accumulated fromViewstar
SHE RIVER BANK PROTECTION
3m high Gabion wall along with 20m length and 0.3m thick mattress protection below the wall were chosen to protect the bank from scouring and to reclaViewstar
SLOPE STABILIZATION SOLUTION ALONG CORAMBA ROAD
The contractor selected Steelgrid HR30 (SG HR30) as the secured drapery mesh for rock slopes and erosion control mat for the soil slope. The client anViewstar
SLOPE STRENGTHENING WORKS ALONG TOM’S CREEK ROAD
The contractor proposed Maccaferri Steelgrid HR30 (SG HR30) with an underlying layer of erosion control mat as a surface strengthening and protection Viewstar
SLOPE SURFACE PROTECTION AT LE ORCHID VILLAS
Maccaferri proposed MacMat®. MacMat® is a geomat consisting of a three-dimensional structure having a biconical cuspated shape made from polypropyleViewstar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designViewstar
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tViewstar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaViewstar
THE GREENFIELDS
The original concept was to canter lever a pool out from the sope with a negative edge and the city skyline being the focal point. The initial thoughtViewstar
Haven’t found what you were looking for?
Meet our Experts
We represent a winning partner for the complex world of civil and industrial constructions. Thanks to a wide range, our products are the answer to the various technical demands of the sector: from drainage and protection to water and waterproofing of structures and coverings, to energy-saving to housing comfort, from steam control to issues concerning.