เรื่องราวความสำเร็จของเรา

เรื่องราวความสำเร็จของเรา

44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massView
star
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,View
star
A2 / A282 JUNCTION IMPROVEMENTS
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecView
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MView
star
ALWATHUGODA RETAINING WALL
ALWATHUGODA RETAINING WALL
The Contractor asked the assistance of Maccaferri for a cheap and suitable slope protection system. A gravity retaining wall structure using MaccaferrView
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5View
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosView
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AZUDES SITIO RAMSAR RÍO DESAGUADERO
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxView
star
BAFOKENG CIVIC CENTRE MACWALL
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaView
star
BALESIN ISLAND CLUB RUNWAY
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TView
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsView
star
BEACH PROTECTION IN MAURITIUS
BEACH PROTECTION IN MAURITIUS
The solution encompassed the combined usage of a GeoMac™ sea wall and a Macreef™ submerged breakwater. The submerged breakwater consisted of 2 seView
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trView
star
BIFURCATION A10/171 ORLEANS
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7View
star
BLACK MOUNTAIN GOLF COURSE
BLACK MOUNTAIN GOLF COURSE
After considering all the options, finally the client had accepted Maccaferri Gabion Retaining Wall as the best solution. Not only the gravity wall coView
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that View
star
BONIFICA DISCARICA PONTONE PONTONICCHIO LESINA FOGGIA
BONIFICA DISCARICA PONTONE PONTONICCHIO LESINA FOGGIA
La ditta Favellato avvierà e porterà a compimento un ampio programma di Messa in Sicurezza (MISP) della vasta area di discarica (11 ettari ovvero l’eqView
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to View
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshView
star
BRIDGE AND RIVERBANK PROTECTION AT KOK RIVER
BRIDGE AND RIVERBANK PROTECTION AT KOK RIVER
The Department of Rural Road (DRR) with the assistance from Maccaferri technical team came up with erosion protection system using Maccaferri gabion aView
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenView
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisView
star
CAP MALHEUREUX CEMETERY SEA WALL
CAP MALHEUREUX CEMETERY SEA WALL
A Gabion revetment was constructed using 2x1x0,5 PVC coated gabions. The first 4 rows of the wall (2m high) were laid in HEADER fashion to absorb theView
star
CHARLEROI HOSPITAL
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installView
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the View
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal View
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightView
star
CR110 SOFTEYE BETWEEN TAMPINES NORTH STATION AND DEFU STATION
After a comparison in terms of cost and demolition timing, the Contractor opted for the construction of a “Soft-Eye” for the launching of the TBM.View
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basView
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonView
star
DEBRIS FLOW BARRIER AT DISCOVERY BAY NORTH DEVELOPMENT: TOWN PLAZA
DEBRIS FLOW BARRIER AT DISCOVERY BAY NORTH DEVELOPMENT: TOWN PLAZA
To meet the project requirements, Maccaferri dynamic barriers has been proposed for the authorities' approval. All major components of the dynamicView
star
DEBRIS FLOW PROTECTION LERINI STREAM
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeView
star
DEBRIS FLOW PROTECTION SOLUTION AT HIGHWAY ROUTE 225
DEBRIS FLOW PROTECTION SOLUTION AT HIGHWAY ROUTE 225
Various options were considered, but due to time constraints from the fast approaching monsoon, the option to use open slope debris flow barriers was View
star
DEFENDER LANE MASS MOVEMENT REMEDIATION
DEFENDER LANE MASS MOVEMENT REMEDIATION
The green terramesh (GTM) embankment was the chosen solution because of the long term durability of the structure, ability to withstand multiple impacView
star
DÉPLACEMENT DIGUES SUITE À CONSTRUCTION DE LA NOUVELLE LIGNE TGV
DÉPLACEMENT DIGUES SUITE À CONSTRUCTION DE LA NOUVELLE LIGNE TGV
Sur la rive droite, à Lunel, la digue définitive est conçue pour être déversante sur un linéaire de 150 m. En amont et en aval, la digue est raccordéeView
star
DIDIPIO MINE ACCESS ROAD
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeView
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tView
star
DISCARICA DI BELLOLAMPO V VASCA
DISCARICA DI BELLOLAMPO V VASCA
La realizzazione della vasca prevede l'impiego di una membrana in HDPE, di un gesontetico bentonitico e di un gecomposito drenante per la captazioView
star
Drainage of structures
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed View
star
EARTHQUAKE PERFORMANCE OF GABION WALL FOR BORAL GAS
EARTHQUAKE PERFORMANCE OF GABION WALL FOR BORAL GAS
In addition to the technical requirements for the site Maccaferri NZ Ltd was also requested to offer product that would provide the maximum level of dView
star
EAST GATE SLIP
EAST GATE SLIP
A 2000 kJ Maccaferri RMC200A certified fence was installed at some distance from the road level to intercept any rock fall and moderate the level of sView
star
EAST GATE SLIP ROCKFALL PROTECTION SOLUTION
EAST GATE SLIP ROCKFALL PROTECTION SOLUTION
The final decision was to install Maccaferri 2,000kJ certified fence – some distance from the road level to intercept any rock fall and moderate levView
star
EROSION CONTROL AGAINST MAMMAL BURROWING
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required View
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aView
star
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionView
star
EROSION PROTECTION FOR POWER HOUSE
EROSION PROTECTION FOR POWER HOUSE
5m height PVC Gabion wall was chosen as the best costs effective solution. It shows many advantages that are: • Permeability • Flexibility • DurView
star
EROSION PROTECTION FOR TRASMISSION TOWER
EROSION PROTECTION FOR TRASMISSION TOWER
A solution using combination of gabion retaining wall and filter fabric was proposed by Maccaferri technical team. The proposal includes: 1.0 Gabion gView
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeView
star
FLEMINGTON RACECOURSE
FLEMINGTON RACECOURSE
A 1.6km long x 2.5m high bund wall was built along the course’s river boundary which will cope with a one-in-100 year flood event. A number of optioView
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toView
star
FLYOVER AT TRAN THI LY INTERCHANGE
FLYOVER AT TRAN THI LY INTERCHANGE
The system consists of a combination of geostrip soil reinforcement connected to large concrete facing panels. The ParaWeb® polymer geostrip linear rView
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system creView
star
FV17 LIAFJELLET-OLVIKVATNET
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theView
star
Gabion Defense – Cajuca East Corridor
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineView
star
GABIONS RETAINING WALL FOR LANDSLIDING PROTECTION
GABIONS RETAINING WALL FOR LANDSLIDING PROTECTION
A 2 m height reinforced embankment structure with Zinc Gabions was chosen as able to reconstructed the landslide location. Gabions with its permeable View
star
HASANKEYF ARCHEOPARK PROJECT
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysView
star
HELBOR BROOKLIN
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdView
star
HELLOMAC – Ponza – Cala Fonte
HELLOMAC – Ponza – Cala Fonte
Maccaferri has always pursued innovation and has already taken part in this digital transformation developing a new alert system: HELLOMAC. Thanks to View
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-View
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useView
star
IPO DAM SILT CURTAINS
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beView
star
KAIKOURA SH1ROCKFALL/ SHALLOW SLIPS PROTECTION: SITE SR32
KAIKOURA SH1ROCKFALL/ SHALLOW SLIPS PROTECTION: SITE SR32
ETAG energy certified fences with a minimum kinetic energy capacity of 2000 kJ were identificated to protect the road and rail below. There are 3 fencView
star
KELANIYA FLY OVER PROJECT
KELANIYA FLY OVER PROJECT
As required fast construction Gabion retaining wall is proposed extension side of bypass road which was constructed as alternative road during the coView
star
KHA-SAT RIVERBANK PROTECTION
KHA-SAT RIVERBANK PROTECTION
Maccaferri proposal of using combination of gabion and reno mattress as erosion protection system was accepted by the client because rocks which are lView
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawView
star
KIMPO APARTMENTS
KIMPO APARTMENTS
Gabion wall proposal forwarded by Achung Industry was accepted by the Clients. During the course of construction, the layout, which originally was a sView
star
KOGGALA BEACH HOTEL RETAINING WALL  
KOGGALA BEACH HOTEL RETAINING WALL  
Maccaferri Gabion gravity retaining wall was recognized as the best solution for the slope protection (Swimming pool, Restaurant and Rooms area). The View
star
LANDSLIDE PROTECTION BARRIER AT MUELLER STREET
LANDSLIDE PROTECTION BARRIER AT MUELLER STREET
The landslide protection works comprise of land clearing works to remove the landslide debris, platform construction for landslide embankment, construView
star
LANDSLIPS WITH MINERAL TERRAMESH AT EUREKA BEND
Geofabrics New Zealand (GNZ) partner of Maccaferri worked with consulting engineer GHD to design the Mineral Terramesh® system. The Mineral TerrameshView
star
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyView
star
LAYAN GARDEN
LAYAN GARDEN
Maccaferri Gabion gravity retaining wall was recognized as the best solution for the slope protection. This is due to Gabion's peculiar characterView
star
LINCOLNSHIRE EFW
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of  ground level wet and dry holding lagoons. These were   impermeably lineView
star
LISTENING MIRRORS HISTORIC SITE
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and View
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeView
star
Lower Campbell Repair
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iView
star
LPMITP WORKS IN SHAM WAT ROAD, WEST LANTAU
LPMITP WORKS IN SHAM WAT ROAD, WEST LANTAU
Maccaferri 8,600kJ capacity dynamic barrier was proposed as it has undergone ETAG 027 assessment and proven to be a competent barrier. After rigorous View
star
LUOYANG FOUR RIVER TONGZHI PROJECT
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipView
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallView
star
MacSport AC Monza
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaView
star
MAE KHA CHANNEL PROTECTION
MAE KHA CHANNEL PROTECTION
The galvanized Reno mattress lining designed by Maccaferri offered a more economical alternative to the Marine Department as compared to a traditionalView
star
MAE KLONG RIVER BANK PROTECTION
MAE KLONG RIVER BANK PROTECTION
The solution designed by the Harbour Department with technical assistance from Maccaferri Asia included : • Strengthening of the existing river bankView
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiView
star
MANILA-CAVITE EXPRESSWAY
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duView
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesView
star
Mass Gravity Retaining Walls
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in View
star
MEAKLONG RIVERBANK PROTECTION
MEAKLONG RIVERBANK PROTECTION
The solution proposed by the MD involved Galmac coated Gabions and Reno Mattresses. Reno Mattresses allow tangential river flow velocities up to 6m/s View
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesView
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting View
star
MONTAGNE COUPEÉ
MONTAGNE COUPEÉ
The initial solution consisted in a mixed design, including a mass gravity gabion wall at the toe, and a Terramesh™ soil reinforced structure in theView
star
MOUNT BARKER WASTEWATER TREATMENT PLANT
MOUNT BARKER WASTEWATER TREATMENT PLANT
The large wind and wave loading resulting from the long length of baffles and the distance between them ruled out traditional baffle methods such as fView
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retView
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thView
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thView
star
NAN RIVERBANK PROTECTION
NAN RIVERBANK PROTECTION
Zinc Gabions (3x2x0.5) & Zinc Mattress (6x2x0.3) have been used. The gabion of 0.5m thick with 2m width has been put in the river at the toe of existiView
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureView
star
NEW ASDA STORE
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and View
star
NEWHURST ENERGY FROM WASTE FACILITY
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to  impermeably line the attenuation pond and this was   accepted by client HitView
star
NL BERGEN
NL BERGEN
The anti-erosion mat MacMat R020 is reinforced by a polyester geogrid with a tensile strength of 20 kN/m. The MacMat R020 was secured to the slope witView
star
NONG SLIK WEIR RETIFICATION PROJECT
NONG SLIK WEIR RETIFICATION PROJECT
Comparing all available solutions, Maccaferri Gabions and Reno Mattresses solution has the following advantages: • Permeability • Flexibility • View
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a View
star
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsView
star
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoView
star
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aView
star
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshView
star
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. View
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiView
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has View
star
PRACHUABKIRIKHAN BAY RENOVATION
PRACHUABKIRIKHAN BAY RENOVATION
Maccaferri was approached by the client to provide the most suitable solution to prevent further deterioration of the shoreline. After careful studiesView
star
PRACHUAP KHIRI KHAN BAY PROTECTION
PRACHUAP KHIRI KHAN BAY PROTECTION
For several years, systems using double twisted wire mesh have been performed successfully in civil engineering applications. This is due to their pecView
star
PRESA FRANCISCO ABELLÁN
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofView
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rView
star
PROTEÇÃO COSTEIRA COM GABIÕES
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,View
star
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aView
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netView
star
REDBANK TUNNEL DEVIATION
REDBANK TUNNEL DEVIATION
Macmat R was chosen not only for its effectiveness as a unique solution but also for the substantial cost saving realized by requiring only one singleView
star
REDROW HOMES DEVELOPMENT
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiView
star
Rehabilitation due to Undermining in Villalobos
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizView
star
Reinforced Soil Retaining Structure and Slope Reinforcement
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininView
star
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the View
star
REMEDIATION AND ENVIRONMENTAL RESTORATION OF THE MUNICIPAL DUMP
REMEDIATION AND ENVIRONMENTAL RESTORATION OF THE MUNICIPAL DUMP
L’impiego del sistema terramesh “Liner” costituito dal sistema Terramesh Verde o Liner con inserito all’interno un cassero sul quale è stato posto un View
star
RENOVATE OF WATER CANAL DR 2.8 AND DR 15.8
RENOVATE OF WATER CANAL DR 2.8 AND DR 15.8
The first section of canal is connected to the big main river Nan, 1m thick Gabions have been chosen to protect the bed of canal from erosion, the widView
star
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in  the Windsor area, was tasked by the Town of Amherstburg   to devise aView
star
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofView
star
RETAINING WALL SUPPORTING A630
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was  originally proposed within the design. However, the PVC   coating on weldedView
star
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyView
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeView
star
RIVERVIEW MINING SUBSIDENCE
RIVERVIEW MINING SUBSIDENCE
Commonly used remediation measures for subsidence caused by voids are wide-scale grouting of the underground cavities, providing structural bridging uView
star
ROAD EMBANKMENT RETAINING WALL FOR KENGTENG BYPASS ROAD
The Paramesh  system has been used in three different locations along the 10km road. The walls are around 6m high and the design has been done with MView
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in View
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringView
star
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RView
star
ROCKFALL PROTECTION AT BHUMIBOL DAM
ROCKFALL PROTECTION AT BHUMIBOL DAM
Macacferri proposed simple drapery system as the most effective and economical solution to protect the dam from falling rocks. It consist of double twView
star
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mView
star
ROCKFALL PROTECTION SOLUTION AT NGAU CHI WAN PARK
ROCKFALL PROTECTION SOLUTION AT NGAU CHI WAN PARK
Maccaferri is involved in the project since preliminary design stage up until handover of the dynamic barriers to the client. The accepted proposal View
star
ROCKFALL PROTECTION SYSTEM AT KAENG KHOI CEMENT PLANT
ROCKFALL PROTECTION SYSTEM AT KAENG KHOI CEMENT PLANT
Maccaferri worked closely with the Client’s Consultant to come up with a cost-effective and optimum rockfall solution. The consultant has consideredView
star
ROCKFALL PROTECTION SYSTEM FOR ROUTE NM1016, KORAT
ROCKFALL PROTECTION SYSTEM FOR ROUTE NM1016, KORAT
The source of rockfall is located on high and steep slope hence intervention measure close to point of rockfall is difficult and dangerous to construcView
star
ROCKFALL PROTECTION WORKS FOR PYLON CY288
ROCKFALL PROTECTION WORKS FOR PYLON CY288
The proposed solution is a combination of two approaches to arrive at an effective outcome. High risk larger rock outcrops were removed through scalinView
star
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thView
star
SADAWARNA DAM PARAMESH WALL
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshView
star
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for View
star
SEATION TRAMWAY
SEATION TRAMWAY
The site is situated above an area of soft soil that required  substantial ground improvement.The new platform area   adjacent to View
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with View
star
SH6 MEYBILLE BAY
SH6 MEYBILLE BAY
After identifying the most probable boulder size and rigorous detail rockfall trajectory analysis, Opus has ascertained the most suitable rockfall proView
star
SH73 BELOW STARVATION POINT
SH73 BELOW STARVATION POINT
The client had accepted a proposal to install a debris flow fence (without posts) with the capacity of capturing 300m³ debris volume accumulated fromView
star
SHE RIVER BANK PROTECTION
SHE RIVER BANK PROTECTION
3m high Gabion wall along with 20m length and 0.3m thick mattress protection below the wall were chosen to protect the bank from scouring and to reclaView
star
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VView
star
SLOPE STABILISATION PORT OF ZIERBENA
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryView
star
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeView
star
SLOPE STABILIZATION SOLUTION ALONG CORAMBA ROAD
SLOPE STABILIZATION SOLUTION ALONG CORAMBA ROAD
The contractor selected Steelgrid HR30 (SG HR30) as the secured drapery mesh for rock slopes and erosion control mat for the soil slope. The client anView
star
SLOPE STRENGTHENING WORKS ALONG TOM’S CREEK ROAD
SLOPE STRENGTHENING WORKS ALONG TOM’S CREEK ROAD
The contractor proposed Maccaferri Steelgrid HR30 (SG HR30) with an underlying layer of erosion control mat as a surface strengthening and protection View
star
SLOPE SURFACE PROTECTION AT LE ORCHID VILLAS
SLOPE SURFACE PROTECTION AT LE ORCHID VILLAS
Maccaferri proposed MacMat®. MacMat® is a geomat consisting of a three-dimensional structure having a biconical cuspated shape made from polypropyleView
star
Small green lung in the Metelliana Valley
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoView
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designView
star
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fView
star
St Andrews Royal & Ancient Golf Club
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byView
star
SUNSET CLIFF
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersView
star
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tView
star
TERRAMESH RD PATRIMONIAL
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the View
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaView
star
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengView
star
The Ash Yard of the Thermal Power Plant
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionView
star
THE GRAND BOHEMIAN HOTEL
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prView
star
THE GREENFIELDS
THE GREENFIELDS
The original concept was to canter lever a pool out from the sope with a negative edge and the city skyline being the focal point. The initial thoughtView
star
THE NEW ROUTE DU LITTORAL
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.View
star
THREE CITIES TRAIL
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and  implemented a tie-back reinforced gabion retaining wall to   act as the slView
star
TK 2018 – 006 – MRV
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxView
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comView
star
WALTHAM HIGH SCHOOL
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mView
star

Haven’t found what you were looking for?

กรองตาม
ค้นหาขั้นสูง












Meet our Experts

We represent a winning partner for the complex world of civil and industrial constructions. Thanks to a wide range, our products are the answer to the various technical demands of the sector: from drainage and protection to water and waterproofing of structures and coverings, to energy-saving to housing comfort, from steam control to issues concerning.