NEW MODI LEKHNATH 132 KV TRANSMISSION LINE PROJECT

Home > Success stories > NEW MODI LEKHNATH 132 KV TRANSMISSION LINE PROJECT

Longitudinal Protection

2020

PARBAT - NEPAL - Nepal

Nepal Electricity Authority

NEW MODI LEKHNATH 132 KV TRANSMISSION LINE PROJECT

Problem

The road to project site (New Modi Lekhnath 132 KV Transmission Line Project) runs along the bank of Patu river for approximately 700m. Patu is a steep river with large boulders on the bed and bank. The bank cutting during the monsoon can damage the road and road alignment. The client was looking for alternatives to rigid structures since they would have developed pore water pressure behind and underneath of the protection wall. So, it was appropriate to provide a flexible and self draining structure to control the erosion.

Solution

The following Structures had been designed by Maccaferri based on the available river hydrology and topographical information: (1) River Bank Protection Works (2) Retaining Structures to strengthen the road embankment For the same, gabions were used for which the boulders were locally sourced as fill material. Advantages of using gabions embankment wall: 1 Highly stable due to its large weight & flexibility. 2 Maintains its functions even after the settlement of the foundation. 3 Structure can be built without heavy equipment. 4 Can be repaired by opening the boxes, refilling and wiring them shut again. 5. Structure is self draining in nature which prevents the formation of pore water pressure behind the wall. 6. Eco-friendly with low carbon footprint

Used Products

Gabions
Gabions
Maccaferri Gabion is a Double-Twisted “DT” wire mesh container of variable sizes uniformly partitioned into internal cells, interconnected with othView
star