SUCCESS STORIES

Success Stories

44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massView
star
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,View
star
A2 / A282 JUNCTION IMPROVEMENTS
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecView
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MView
star
ANTIBUND SEA EROSION PROTECTION
ANTIBUND SEA EROSION PROTECTION
The Contractor has suggested the use of Gabion Mattress as an Apron Protection Work for the bunds which is one of the most practical and viable solutView
star
ANTIBUND SEA EROSION PROTECTION, SHELL HAZIRA
ANTIBUND SEA EROSION PROTECTION, SHELL HAZIRA
The contractor has suggested the use of gabion mattress as an apron protection work for the bunds which is one of the most practical and viable solutiView
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5View
star
ASH POND LINING WITH GEOMEMBRANE AT NELLORE
ASH POND LINING WITH GEOMEMBRANE AT NELLORE
Considering the importance of the project and protection of the environment, Maccaferri suggested the use of geomembrane MacLine® SDH HDPE 1.0 mm tView
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosView
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 12 (R) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (R) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 2 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 2 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 5 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 5 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 6 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 6 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AZUDES SITIO RAMSAR RÍO DESAGUADERO
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxView
star
BAFOKENG CIVIC CENTRE MACWALL
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaView
star
BALESIN ISLAND CLUB RUNWAY
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TView
star
BALLAST STABILIZATION USING GEOSYNTHETIC SOLUTIONS
BALLAST STABILIZATION USING GEOSYNTHETIC SOLUTIONS
The proposed solution is ballast stabilization using biaxial extruded geogrid i.e. Maccaferri’ s MacGrid EG and Polypropylene Multifilament Woven GeView
star
BANK PROTECTION FOR RIVER TAPI, SURAT
BANK PROTECTION FOR RIVER TAPI, SURAT
The conventional methods were not able to provide a technically and commercially viable solution to the heavy erosion problem. The consultant CWPRS fiView
star
BANK PROTECTION FOR VENNAR RIVER
BANK PROTECTION FOR VENNAR RIVER
The PWD Tamil Nadu, decided to go for an innovative method of providing a gabion structure in order to protect the river bank as well as to control erView
star
BANK PROTECTION WORK AT GATHA BHADERWAH, J&K
BANK PROTECTION WORK AT GATHA BHADERWAH, J&K
Gabions were proposed to construct the retaining wall because of its free draining nature and speed in construction. Another advantage of gabions was View
star
BANK PROTECTION WORK ON NEERU RIVER
BANK PROTECTION WORK ON NEERU RIVER
Gabions were proposed to construct the retaining wall because of its free draining nature and speed in construction. Another advantage was the effectiView
star
BANK PROTECTION WORKS ALONG RIVER GANGA NEAR DAKSHINESHWAR TEMPLE
BANK PROTECTION WORKS ALONG RIVER GANGA NEAR DAKSHINESHWAR TEMPLE
Maccaferri proposed a gabion toe wall along with a gabion mattress revetment over the slope. MacBags (geotextile bags) were used as filling material bView
star
BANK PROTECTION WORKS IN RIVER GANGA AT BUDGE BUDGE
BANK PROTECTION WORKS IN RIVER GANGA AT BUDGE BUDGE
It was important to carryout the construction planning so that the system sustained all the worst loading conditions. The design thickness calculationView
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsView
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trView
star
BHAVNAGAR PAVEMENT STABILIZATION
BHAVNAGAR PAVEMENT STABILIZATION
R & B department referred the problem to Maccaferri for the improvement of 14 km length proposed road. Ease and speed of construction was a key elemenView
star
BIFURCATION A10/171 ORLEANS
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7View
star
BLANKET THICKNESS REDUCTION USING GEOSYNTHETIC SOLUTION FOR ADANI
BLANKET THICKNESS REDUCTION USING GEOSYNTHETIC SOLUTION FOR ADANI
Geosynthetic solutions play a vital role as alternative to conventional approach in track bed stabilization projects. The design was based on modifiView
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that View
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to View
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshView
star
BRIDGE PROTECTION WORKS AT KOSI RIVER
BRIDGE PROTECTION WORKS AT KOSI RIVER
Guide bund works and afflux bund were proposed with gabion mattress. Gabion mattress adopted here was of thickness 0.3m, with length varying as 3m, 2mView
star
BRIDGE PROTECTION WORKS FOR RIVER YAMUNA
BRIDGE PROTECTION WORKS FOR RIVER YAMUNA
The river training works were designed for a design discharge of 14866 cum/s and a maximum velocity of 3.3 m/s. The solution offered made use of 1 sinView
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenView
star
BYTCO JUNCTION ROB
BYTCO JUNCTION ROB
Reinforced Soil Wall with discrete concrete panel as facia and Double Twisted Hexagonal mesh as reinforcement was selected as the system. Square discrView
star
CANAL LINING IN HARYANA
CANAL LINING IN HARYANA
The client was looking for a product which can replace the conventional granular gravel layer & arrangement of network of perforated pipe provided undView
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisView
star
CAUSEWAY CONSTRUCTION WITH GABIONS ON DHADHAR RIVER
CAUSEWAY CONSTRUCTION WITH GABIONS ON DHADHAR RIVER
The embankment being located in high flood zone, an inherently permeable and free draining structure would be technically suitable. Maccaferri suggestView
star
CHARLEROI HOSPITAL
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installView
star
CHECK DAM FOR VAMANAPURAM RIVER
CHECK DAM FOR VAMANAPURAM RIVER
The Irrigation department, decided to construct a check dam across Vamanapuram river in the downstream location of the infiltration gallery. The maiView
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the View
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal View
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightView
star
CONSTRUCTION OF EIGHT LANE VADODARA-MUMBAI EXPRESSWAY IN THE STATE
CONSTRUCTION OF EIGHT LANE VADODARA-MUMBAI EXPRESSWAY IN THE STATE
Out of the various alternatives, Reinforced Soil (RS) Wall system (MacRes) with precast concrete panels as fascia and Paraweb as reinforcement was selView
star
CONSTRUCTION OF GEOTEXTILE REEF AT THE COAST OF MIRYA BAY
CONSTRUCTION OF GEOTEXTILE REEF AT THE COAST OF MIRYA BAY
In order to mitigate the problem of erosion, Maharashtra Maritime Board (MMB) proposed the construction of a multipurpose submerged geotextile reef atView
star
CONSTRUCTION OF LEFT AFFLUX BUND AT JOSHIYARA BARRAGE
CONSTRUCTION OF LEFT AFFLUX BUND AT JOSHIYARA BARRAGE
Uttarakhand Jal Vidyut Nigam Ltd. (UJVNL), Govt. of Uttarakhand, had decided to reconstruct the left afflux bund using prefilled / in-situ filled gabiView
star
CONSTRUCTION OF ROB AT DWARKA
CONSTRUCTION OF ROB AT DWARKA
As per Maccaferri’s standard block, two types of blocks were proposed- one with flat facing and other one with curvature facing. Keeping the aesthetView
star
CONSTRUCTION OF RS WALLS FOR ANCILLARY BUILDINGS
CONSTRUCTION OF RS WALLS FOR ANCILLARY BUILDINGS
RS Wall system (MacRes) with precast concrete panels as fascia and Paraweb as reinforcement was proposed to the contractor for the above problem due tView
star
CONSTRUCTION OF RS WALLS FOR APPROACHES OF ROB’S/VUP’S OF NH-49
CONSTRUCTION OF RS WALLS FOR APPROACHES OF ROB’S/VUP’S OF NH-49
Reinforced Soil (RS) Wall system (MacRes) with precast concrete panels as fascia and Paraweb as reinforcement was proposed for the above problem due tView
star
CONSTRUCTION OF UNPAVED ROAD
CONSTRUCTION OF UNPAVED ROAD
The solution by CESC was to construct an embankment (with the existing local soil) 1.5 m high having a top width of 11m. The middle 7 m width (road wiView
star
CRUSHER WALL AT SERAJUDDIN MINES (JODA)  ,ORISSA
CRUSHER WALL AT SERAJUDDIN MINES (JODA)  ,ORISSA
A 22 m high vertical Terramesh TM System wall was proposed. The inherent flexibility of the Terramesh System TM made it an ideal choice. The design wView
star
CULVERT PROTECTION WITH GABION AT KURAL-SHANPUR-SOKHADA RAGHU ROAD
CULVERT PROTECTION WITH GABION AT KURAL-SHANPUR-SOKHADA RAGHU ROAD
The embankment being located in high flood zone, an inherently permeable and free draining structure would have been technically suitable. Maccaferri View
star
CUT SLOPE STABILISATION ALONG NEAR KHANDALA TUNNEL PUNE CORRIDOR
CUT SLOPE STABILISATION ALONG NEAR KHANDALA TUNNEL PUNE CORRIDOR
After conducting thorough investigation and taking into consideration the observations of geological experts and geotechnical engineers, Maccaferri haView
star
CUT SLOPE STABILISATION NEAR A HOSPITAL AT PONDA,GOA, INDIA
CUT SLOPE STABILISATION NEAR A HOSPITAL AT PONDA,GOA, INDIA
Considering the need to protect the vertical cut, soil retention works with soil nailing was suggested for the above problem. The height to be retainView
star
CUT SLOPE STABILISATION WORK AT SHRIRAM-THE GATE WAY SEZ (PHASEII)
CUT SLOPE STABILISATION WORK AT SHRIRAM-THE GATE WAY SEZ (PHASEII)
To retain the cut slope, Maccaferri proposed composite solution of soil nailing with Gabion fascia at bottom and reinforced soil system with TerraMeshView
star
CUT-SLOPE STABILISATION USING SOIL NAILING AT VILLUKURI
CUT-SLOPE STABILISATION USING SOIL NAILING AT VILLUKURI
As per geotechnical investigations carried out between KM 43/000 to KM 70/250, rocky strata is overlain by lateritic soil, clayey soil, river and coasView
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basView
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonView
star
DEBRIS FLOW MITIGATION MEASURES NEAR KEDARNATH TEMPLE
DEBRIS FLOW MITIGATION MEASURES NEAR KEDARNATH TEMPLE
Considering the extremely challenging site situation and requirement of system that can be dismantled, easy to transport and install, solution with ErView
star
DEBRIS FLOW PROTECTION LERINI STREAM
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeView
star
DIDIPIO MINE ACCESS ROAD
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeView
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tView
star
DISMANTLING WORKS OF UNSTABLE ROCK BOULDER LOCATED AT GAYA, BIHAR
DISMANTLING WORKS OF UNSTABLE ROCK BOULDER LOCATED AT GAYA, BIHAR
Immediate protection measure for the massive boulder which was in the verge of sliding has been done by wrapping the boulder with High Energy AbsorptiView
star
Drainage of structures
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed View
star
EARTH RETENTION WITH GABION WALL AT EON IT PARK
EARTH RETENTION WITH GABION WALL AT EON IT PARK
Considering the site conditions, it was decided to construct a gabion retaining wall to mitigate the specified problem. Maccaferri gabions are rectangView
star
EROSION CONTROL AGAINST MAMMAL BURROWING
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required View
star
EROSION CONTROL AT BHAUPUR KHURJA RAILWAY EMBANKMENT
EROSION CONTROL AT BHAUPUR KHURJA RAILWAY EMBANKMENT
Maccaferri has developed wide range of erosion control solutions that are applicable after judicious assessment of the slope angle and extent of erosiView
star
EROSION CONTROL MEASURES – VALLEY SIDE – HELANG, UTTARAKHAND
EROSION CONTROL MEASURES – VALLEY SIDE – HELANG, UTTARAKHAND
Reinforced soil structure (Maccaferri’s Paramesh system) has been constructed as the road side retention measures. In order to provide the toe sidView
star
EROSION CONTROL MEASURES ALONG ARIYALUR BYPASS OF NH, TAMIL NADU
EROSION CONTROL MEASURES ALONG ARIYALUR BYPASS OF NH, TAMIL NADU
To address erosion control, Maccaferri has supplied biodegradable erosion control mat (woven coir mat (BioMac CCW)) and hydraulically applied erosionView
star
EROSION CONTROL MEASURES ALONG C-Z ROAD, NAGALAND, INDIA
EROSION CONTROL MEASURES ALONG C-Z ROAD, NAGALAND, INDIA
To protect the slope, hydraulically applied erosion control measures comprising of MacFlex HP FGM (HECP), and other agronomic amendments are appliedView
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aView
star
EROSION CONTROL MEASURES ALONG NH 39, MANIPUR, INDIA
EROSION CONTROL MEASURES ALONG NH 39, MANIPUR, INDIA
To protect the slope, hydraulically applied erosion control measures comprising of MacFlex HP FGM (HECP), MacGanics BSM (top soil alternative) and othView
star
EROSION CONTROL MEASURES FOR HINDALCO’S MINE AT MURI, JHARKHAND
EROSION CONTROL MEASURES FOR HINDALCO’S MINE AT MURI, JHARKHAND
To protect the slope, Maccaferri used Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such as AquaView
star
EROSION CONTROL MEASURES FOR RAILWAY EMBANKMENT AT LUCKNOW
EROSION CONTROL MEASURES FOR RAILWAY EMBANKMENT AT LUCKNOW
Maccaferri has suggested the erosion control system consisting of rolled erosion control product (RECP)- MacMat R (steel reinforced synthetic geomat) View
star
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionView
star
EROSION CONTROL MEASURES TRIAL AT HINDALCO’S MURI PLANT
EROSION CONTROL MEASURES TRIAL AT HINDALCO’S MURI PLANT
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asView
star
EROSION CONTROL MEASURES TRIAL AT HINDALCO’S RENUKOOT PLANT
EROSION CONTROL MEASURES TRIAL AT HINDALCO’S RENUKOOT PLANT
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asView
star
EROSION CONTROL MEASURES TRIAL AT KANNUR INTERNATIONAL AIRPORT
EROSION CONTROL MEASURES TRIAL AT KANNUR INTERNATIONAL AIRPORT
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control products (HECPs)- MacFlex, MacGanics and other agronomic amendments sView
star
EROSION CONTROL TRIAL ALONG OOTY STATE HIGHWAY, TAMILNADU
EROSION CONTROL TRIAL ALONG OOTY STATE HIGHWAY, TAMILNADU
To carry out the trial in identified slope area of 300 sq.m, Maccaferri suggested surface nails (Self drilling Anchors (SDA) of 32mm dia.), 3D erosionView
star
EROSION CONTROL TRIALS DONE ON RAILWAY EMBANKMENT AT HOSHANGABAD
EROSION CONTROL TRIALS DONE ON RAILWAY EMBANKMENT AT HOSHANGABAD
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asView
star
EROSION CONTROL TRIALS DONE ON RAILWAY EMBANKMENT, CHATTISGARH
EROSION CONTROL TRIALS DONE ON RAILWAY EMBANKMENT, CHATTISGARH
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asView
star
EROSION CONTROL TRIALS DONE ON RED MUD OB DUMP AT BELAGAVI
EROSION CONTROL TRIALS DONE ON RED MUD OB DUMP AT BELAGAVI
To protect the slope, Maccaferri suggested Hydraulically Applied Erosion Control materials – MacFlex, MacGanics and other agronomic amendments such asView
star
EROSION CONTROL WORKS ON SONA RIVER
EROSION CONTROL WORKS ON SONA RIVER
A gabion wall was constructed to protect further erosion of the pier of the existing bridge on the Sona river. Slope revetment protection was done usView
star
EROSION PROTECTION WORKS ALONG BANKS OF BRAHMAPUTRA RIVER
EROSION PROTECTION WORKS ALONG BANKS OF BRAHMAPUTRA RIVER
Water Resource Department suggested the use of MacBag® for the bank protection, which is one of the most practical and viable solutions. Maccaferri&#View
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeView
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toView
star
FLOOD PROTECTION WORKS ON RIGHT BANK OF NARMADA RIVER
FLOOD PROTECTION WORKS ON RIGHT BANK OF NARMADA RIVER
Considering the river bank erosion happening constantly in this region and leading to loss of land and property, Maccaferri suggested to go for simpleView
star
FLY OVER AT PUNJAGUTTA JUNCTION
FLY OVER AT PUNJAGUTTA JUNCTION
Reinforced soil wall (RS wall) with concrete panels as facia and ParaWeb as reinforcement was selected as the best solution for the above problem. T-View
star
FLYOVER FOR BRIDGE ACROSS CHAKKAI CANAL
FLYOVER FOR BRIDGE ACROSS CHAKKAI CANAL
Reinforced Soil wall with concrete panels as facia and Paraweb as reinforcement was selected as the best solution in comparison to RS wall with steel View
star
FORMATION TREATMENT WORK IN AGARTALA SABROOM BG RAILWAY LINE (NFR)
FORMATION TREATMENT WORK IN AGARTALA SABROOM BG RAILWAY LINE (NFR)
The consultant proposed woven multifilament geotextile as a separation & filtration purpose in between blanketing & subgrade material along with biaxiView
star
FOUR LANING OF HYDERABAD – KARIMNAGAR-RAMAGUNDAM ROAD (SH-01)
FOUR LANING OF HYDERABAD – KARIMNAGAR-RAMAGUNDAM ROAD (SH-01)
Maccaferri proposed reinforced soil wall with concrete panels as facia. ParaWeb® as reinforcement was adopted due to its technical and economic advanView
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system creView
star
FV17 LIAFJELLET-OLVIKVATNET
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theView
star
GABION CHECK DAM FOR KILLI RIVER,TRIVANDRUM
GABION CHECK DAM FOR KILLI RIVER,TRIVANDRUM
The main purpose of constructing the check dam was: 1) To recharge the ground water table and to recoup the water level in the nearby wells adjacent tView
star
Gabion Defense – Cajuca East Corridor
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineView
star
GABION RETAINING WALL AS WING WALL AT NH8 VADODARA-BHARUCH
GABION RETAINING WALL AS WING WALL AT NH8 VADODARA-BHARUCH
L & T’s conventional solution was to provide RCC retaining walls as wing walls for minor bridges and culverts. The in-situ soil was clayey in natureView
star
GABION RETAINING WALL AT IT PARK MAGARPATTA, PUNE
GABION RETAINING WALL AT IT PARK MAGARPATTA, PUNE
Since black cotton soil is highly sensitive to seasonal moisture content variations and can lead to distress of the structure, foundation replacement View
star
GABION RETAINING WALL AT MUMBAI PUNE EXPRESSWAY
GABION RETAINING WALL AT MUMBAI PUNE EXPRESSWAY
Retaining were deemed necessary. Gabions were preferrred because of its free draining nature and speed of construction. Another advantage of the effecView
star
GABION RETAINING WALL FOR BARRAGE BANK PROTECTION, NASHIK
GABION RETAINING WALL FOR BARRAGE BANK PROTECTION, NASHIK
Gabion retaining walls were provided as the solution. The maximum height of retention for bank protection was 11m. Due to the presence of water, it waView
star
GABION RETAINING WALLS AT GODA PARK
GABION RETAINING WALLS AT GODA PARK
A gabion wall for retaining the earth was constructed. The main function of a bank protection structure is to provide a substantial interface between View
star
GABION WALL AT PANCHKARMA AYURVEDIC HOSPITAL
GABION WALL AT PANCHKARMA AYURVEDIC HOSPITAL
Considering weak soil parameters and seepage, a flexible free draining structure would be an ideal solution and the same was proposed with gabion wallView
star
GABION WALL FOR KOLLAM-SHENKOTTA SECTION GUAGE CONVERSION
GABION WALL FOR KOLLAM-SHENKOTTA SECTION GUAGE CONVERSION
Gabions were proposed to construct the retaining wall because of its free draining nature and speed of construction. Another advantage was the effectiView
star
GABION WALLS AT AHMEDABAD VADODARA EXPRESSWAY
GABION WALLS AT AHMEDABAD VADODARA EXPRESSWAY
Maccaferri provided gabions for the wing walls and culverts since that was the most preferred solution because of its flexibility and free draining naView
star
GABION WALLS AT SATARA-KOLHAPUR ROAD
GABION WALLS AT SATARA-KOLHAPUR ROAD
Conventional Structures like concrete walls were ruled out since it may require deep foundation because of the existence of the clay. So, gabion wallsView
star
GABION WALLS FOR KSTP UPGRADATION, KERALA
GABION WALLS FOR KSTP UPGRADATION, KERALA
Consultants LBI proposed three alternatives such as gabion walls, random rubble walls and concrete walls out of which gabion walls were selected becauView
star
GABION WALLS FOR MUNNAR VATTAVADA ROAD
GABION WALLS FOR MUNNAR VATTAVADA ROAD
Taking into consideration the critical situation at site, Maccaferri adopted Gabion for embankment and culverts head walls. The height of the walls whView
star
GABION WALLS FOR OOTY-METTUPALAYAM ROAD
GABION WALLS FOR OOTY-METTUPALAYAM ROAD
National Highway Authority of India consulted Maccaferri for the problems faced by the Highway department for widening of existing road and retention View
star
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cView
star
GABION WALLS FOR TRIVANDRUM-PONMUDI ROAD
GABION WALLS FOR TRIVANDRUM-PONMUDI ROAD
Gabion retaining walls were provided as the solution. The maximum height of retention for road embankment was 6m. The foundation at site was rocky in View
star
GROUND IMPROVEMENT USING PRE-FABRICATED VERTICAL DRAIN ALONG WITH
GROUND IMPROVEMENT USING PRE-FABRICATED VERTICAL DRAIN ALONG WITH
Considering the extremely challenging site situation in terms of weak, compressible foundation strata, Maccaferri suggested the pre-fabricated verticaView
star
GUIDE BUND & RIVER PROTECTION WORKS ON RIVER GANGA NEAR ALLAHABAD
GUIDE BUND & RIVER PROTECTION WORKS ON RIVER GANGA NEAR ALLAHABAD
Usually, riprap (pitching) is used for river bank and guide bund protection. Thickness of such riprap vary from 0.3m to 2m as per design. Gabion mattrView
star
HASANKEYF ARCHEOPARK PROJECT
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysView
star
HELBOR BROOKLIN
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdView
star
HELLOMAC – Ponza – Cala Fonte
HELLOMAC – Ponza – Cala Fonte
Maccaferri has always pursued innovation and has already taken part in this digital transformation developing a new alert system: HELLOMAC. Thanks to View
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-View
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useView
star
IPO DAM SILT CURTAINS
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beView
star
JAIPUR-KISHANGARH EXPRESSWAY
JAIPUR-KISHANGARH EXPRESSWAY
Reinforced soil wall with concrete panels as facia and Paraweb® as reinforcement was selected as the best solution. Three types of panels were used aView
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawView
star
KONKAN RAILWAY (KRCL) ROUTE
KONKAN RAILWAY (KRCL) ROUTE
Maccaferri Gabion walls with stepped rear face were adopted in many vulnerable stretches of hill cuttings of Konkan Railway. Backfill soil was carefulView
star
LAKE PROTECTION WORKS IN NAVI MUMBAI
LAKE PROTECTION WORKS IN NAVI MUMBAI
The existing UCR Wall had failed to protect the lake banks, and so the client was in favor of an environment friendly solution, so a gabion retaining View
star
LANDFILL PROJECT AT GYASPUR VILLAGE
LANDFILL PROJECT AT GYASPUR VILLAGE
The scope of work for Maccaferri was supplying, laying and joining of the geomembrane (1.5mm thick) at the bottom and on the slopes. The geomembrane cView
star
LANDFILL PROJECT FOR PINCOL PARA  GARULIA MUNICIPAL CORPORATION
LANDFILL PROJECT FOR PINCOL PARA  GARULIA MUNICIPAL CORPORATION
The KMDA has designed a landfill which has a total area of about 4168 sqm. The secured landfill consists of 4 slopes of approximately 4.5 m height. 1View
star
LANDSLIDE MITIGATION WITH FLEXIBLE STRUCTURES IN JHARKHAND
LANDSLIDE MITIGATION WITH FLEXIBLE STRUCTURES IN JHARKHAND
The State Road Construction Department was on look out for appropriate mass gravity wall for slope stabilisation. Gabion retaining walls were selectedView
star
LANDSLIDE PROTECTION WORKS WITH GABION RETAINING WALL AT NH-47
LANDSLIDE PROTECTION WORKS WITH GABION RETAINING WALL AT NH-47
National Highway Authority of India asked solutions for the problem to Maccaferri India. They required a speedy solution since the proposed site was oView
star
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyView
star
LINCOLNSHIRE EFW
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of  ground level wet and dry holding lagoons. These were   impermeably lineView
star
LISTENING MIRRORS HISTORIC SITE
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and View
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeView
star
Lower Campbell Repair
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iView
star
LUOYANG FOUR RIVER TONGZHI PROJECT
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipView
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallView
star
MacSport AC Monza
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaView
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiView
star
MANGALA PROCESSING TERMINAL GABION FLOOD PROTECTION SCHEME
MANGALA PROCESSING TERMINAL GABION FLOOD PROTECTION SCHEME
System is designed in such a way that the Gabion retaining wall along with apron & lower revetment can minimize the effect of rainfall, erosion or anyView
star
MANILA-CAVITE EXPRESSWAY
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duView
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesView
star
Mass Gravity Retaining Walls
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in View
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesView
star
MITIGATION MEAURES NEAR PANGI BRIGDE APPROACH, HIMACHAL PRADESH
MITIGATION MEAURES NEAR PANGI BRIGDE APPROACH, HIMACHAL PRADESH
The solutions for critical stretches with the potential risk of rockfall and surficial instability were identified and adopted. Considering the probleView
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting View
star
MUCK DISPOSAL FROM RAMPUR HYDROELECTRIC POWER PLANT
MUCK DISPOSAL FROM RAMPUR HYDROELECTRIC POWER PLANT
With consideration of specified problem, it was decided to dump the muck on the upper slopes of the Satluj river. To avoid the muck from falling down View
star
MUMBAI PUNE EXPRESSWAY – ROCKFALL MITIGATION WORKS AT GHAT SECTION
MUMBAI PUNE EXPRESSWAY – ROCKFALL MITIGATION WORKS AT GHAT SECTION
After conducting detailed engineering investigation and taking geological and geotechnical observations of the experts into consideration, Maccaferri View
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retView
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thView
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thView
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureView
star
NEW ASDA STORE
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and View
star
NEW MODI LEKHNATH 132 KV TRANSMISSION LINE PROJECT
NEW MODI LEKHNATH 132 KV TRANSMISSION LINE PROJECT
The following Structures had been designed by Maccaferri based on the available river hydrology and topographical information: (1) River Bank ProtectView
star
NEWHURST ENERGY FROM WASTE FACILITY
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to  impermeably line the attenuation pond and this was   accepted by client HitView
star
NL BERGEN
NL BERGEN
The anti-erosion mat MacMat R020 is reinforced by a polyester geogrid with a tensile strength of 20 kN/m. The MacMat R020 was secured to the slope witView
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a View
star
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsView
star
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoView
star
OCEANS UMHLANGA MALL
OCEANS UMHLANGA MALL
After evaluating the geotechnical parameters, loading  constraints and required structure geometry, Maccaferri   provided a designView
star
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aView
star
PARAMESH WALL AT KALIAPANI CHROMITE MINES
PARAMESH WALL AT KALIAPANI CHROMITE MINES
Reinforced soil wall was considered as an ideal solution. Paramesh wall system consisting of Terramesh (gabion facia units with an integrated double tView
star
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshView
star
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. View
star
PAVEMENT STRENGTHENING AT AIRFORCE STATION, KALAIKUNDA
PAVEMENT STRENGTHENING AT AIRFORCE STATION, KALAIKUNDA
Damaged pavement was required to be repaired by placing an asphalt layer to increase the load carrying capacity of the pavement section so that it caView
star
PAVEMENT STRENGTHENING AT NADIA – KAPADWANJ – MODASA ROAD
PAVEMENT STRENGTHENING AT NADIA – KAPADWANJ – MODASA ROAD
Current pavement was needed to be repaired by placing an asphalt layer to increase the load carrying capacity of the pavement section. However the abiView
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiView
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has View
star
POND LINING WORKS AT LANJHA
POND LINING WORKS AT LANJHA
Considering water seepage and storage problems, an impermeable lining of the pond was the ideal solution. The side slopes of the pond were dressed iView
star
PRESA FRANCISCO ABELLÁN
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofView
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rView
star
PROTEÇÃO COSTEIRA COM GABIÕES
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,View
star
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aView
star
PROTECTION FROM SEA EROSION USING GEOTEXTILE TUBE IN AMBALAPUZHA
PROTECTION FROM SEA EROSION USING GEOTEXTILE TUBE IN AMBALAPUZHA
Maccaferri’s expertise and engineering solutions were integrated in this project. The Irrigation department, Govt of Kerala, decided to construct aView
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netView
star
REDROW HOMES DEVELOPMENT
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiView
star
REFURBISHMENT OF SPURS & BANK PROTECTION OF ERODING ZONE IN KULPI
REFURBISHMENT OF SPURS & BANK PROTECTION OF ERODING ZONE IN KULPI
In order to protect bank from waves and current, transverse structures were needed to be provided which will deflect the water away from the river banView
star
REHABILITATION & WIDENING OF NH-09 HYDERABAD TO VIJAYAWADA SECTION
REHABILITATION & WIDENING OF NH-09 HYDERABAD TO VIJAYAWADA SECTION
Gabion retaining walls were provided as the solution for the problem mentioned. The maximum height of retention for road embankment was 5m. Due to theView
star
Rehabilitation due to Undermining in Villalobos
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizView
star
Reinforced Soil Retaining Structure and Slope Reinforcement
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininView
star
REINFORCED SOIL STRUCTURE AT MB ROAD
REINFORCED SOIL STRUCTURE AT MB ROAD
Reinforced Soil Wall with concrete panels as facia and Geogrid as reinforcement was selected as the best solution for the above problem. Cruciform shaView
star
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforceView
star
REINFORCED SOIL WALL AT JAGATPURA RAILWAY CROSSING
REINFORCED SOIL WALL AT JAGATPURA RAILWAY CROSSING
Reinforced Soil Wall with concrete panels as facia and ParaWeb® as reinforcement was selected as the best solution for the above problem. ParaWeb sView
star
REINFORCED SOIL WALL AT MIDC CHAKAN,
REINFORCED SOIL WALL AT MIDC CHAKAN,
Fill material for retaining wall was proposed to be crushed stone. ParaWeb was chosen as soil reinforcement in view of better resistance to installatiView
star
REINFORCED SOIL WALL AT WATSON PHARMA, GOA
REINFORCED SOIL WALL AT WATSON PHARMA, GOA
Maccaferri proposed RS wall with concrete panels as fascia and ParaWeb® as reinforcement for the boundary retaining wall because this system has seveView
star
REINFORCED SOIL WALL FOR ARRIVAL & DEPARTURE RAMPS AT RGI AIRPORT
REINFORCED SOIL WALL FOR ARRIVAL & DEPARTURE RAMPS AT RGI AIRPORT
Out of the various alternatives available, reinforced soil (RS) wall system (MacRes) with precast concrete panels as fascia and Paraweb as reinforcemeView
star
REINFORCED SOIL WALL FOR ASH POND IN BELLARY
REINFORCED SOIL WALL FOR ASH POND IN BELLARY
Reinforced soil panel wall using Paraweb® (MacRes® system) was proposed to build the embankment within available width. The system is comprised of dView
star
REINFORCED SOIL WALL FOR HIMMATNAGAR ROB
REINFORCED SOIL WALL FOR HIMMATNAGAR ROB
Out of the various alternatives available, reinforced soil (RS) walls with segmental block as facia and geogrid as reinforcement was selected by the RView
star
REINFORCED SOIL WALL FOR ROB FOR JNPT DRY PORT AT JALNA
REINFORCED SOIL WALL FOR ROB FOR JNPT DRY PORT AT JALNA
Reinforced Soil (RS) wall system (MacRes) with concrete panels as facia and ParaWeb as reinforcement was selected as the best solution for the above pView
star
REINFORCED SOIL WALL FOR VUP AT KEMPEGOWDA INTERNATIONAL AIRPORT
REINFORCED SOIL WALL FOR VUP AT KEMPEGOWDA INTERNATIONAL AIRPORT
Compared to conventional structures, RS Wall system with precast concrete panels as facia and Paraweb as reinforcement was selected as the best solutiView
star
REINFORCED SOIL WALLS ALONG THE STRETCH OF FIROZABAD & ETAWAH
REINFORCED SOIL WALLS ALONG THE STRETCH OF FIROZABAD & ETAWAH
Reinforced Soil Wall system (MacRes) was proposed over conventional RCC wall due to its economy, flexibility, aesthetics and quick construction. RS WaView
star
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the View
star
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in  the Windsor area, was tasked by the Town of Amherstburg   to devise aView
star
RESTORATION OF GILBERT HILL
RESTORATION OF GILBERT HILL
Considering the space restrictions at toe of hill, presence of buildings in the vicinity and nearly vertical slopes, secured drapery system with rasteView
star
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofView
star
RETAINING WALL SUPPORTING A630
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was  originally proposed within the design. However, the PVC   coating on weldedView
star
RETENTION AND BOX CULVERT PROTECTION WORKS, VADODARA
RETENTION AND BOX CULVERT PROTECTION WORKS, VADODARA
Maccaferri’s Terramesh system with gabion facia and ParaLink as primary reinforcement and mesh as a secondary reinforcement was selected as the beView
star
RETENTION WORKS FOR HAJJ HOUSE
RETENTION WORKS FOR HAJJ HOUSE
Considering the heights to be retained, expected loads, site constraints and client requirements, Maccaferri proposed a Paramesh System which is very View
star
RETENTION WORKS FOR JOJOBERA GU EXPANSION
RETENTION WORKS FOR JOJOBERA GU EXPANSION
Keeping in mind all the aspects of project, the client decided to go with Maccaferri's products. Considering the scope of project and client'sView
star
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyView
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeView
star
RIVER BANK PROTECTION FOR MULA RIVER AT SANGAM BRIDGE
RIVER BANK PROTECTION FOR MULA RIVER AT SANGAM BRIDGE
At the location 1, to protect the bungalow as well as bank, a gabion wall (Zn +PVC coated mesh type 10X12; 2.7/3.7 mm wire dia) of height 6m was constView
star
RIVER BANK PROTECTION FOR TAWI RIVER
RIVER BANK PROTECTION FOR TAWI RIVER
Considering the described problem, it was suggested to provide an erosion control structure which will withstand the water forces and control the flooView
star
ROAD OVER BRIDGE NEAR DIBRUGARH (ROB 15)
ROAD OVER BRIDGE NEAR DIBRUGARH (ROB 15)
For retaining the bridge approaches, Maccaferri proposed ParaWeb® wall system (i.e. reinforced soil system) as the retaining wall. In order to avoid View
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in View
star
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedView
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringView
star
ROCKFALL MITIGATION – KHANDALA (MUMBAI CORRIDOR), MUMBAI–PUNE EW
ROCKFALL MITIGATION – KHANDALA (MUMBAI CORRIDOR), MUMBAI–PUNE EW
After conducting thorough investigation and taking into consideration the observations of geological experts and geotechnical engineers, Maccaferri haView
star
ROCKFALL MITIGATION – MONKEY HILL- THAKURWADI STRETCH-116/300 -500
ROCKFALL MITIGATION – MONKEY HILL- THAKURWADI STRETCH-116/300 -500
As per the site observations, previous history of rockfall incidents in this area and analysis, a critical location along chainage km 116/300 – 116/View
star
ROCKFALL MITIGATION -NEAR ADOSHI TUNNEL, MUMBAI –PUNE EW
ROCKFALL MITIGATION -NEAR ADOSHI TUNNEL, MUMBAI –PUNE EW
After conducting thorough investigation and taking into consideration the observations of geological experts and geotechnical engineers, Maccaferri haView
star
ROCKFALL MITIGATION ALONG NEAR AMRUTANJAN BRIDGE, MUMBAI -PUNE EW
ROCKFALL MITIGATION ALONG NEAR AMRUTANJAN BRIDGE, MUMBAI -PUNE EW
After conducting thorough investigation and taking into consideration the observations of geological experts and geotechnical engineers, Maccaferri haView
star
ROCKFALL MITIGATION ALONG RAILWAY LINE CUT SLOPES-DUDHNOI
ROCKFALL MITIGATION ALONG RAILWAY LINE CUT SLOPES-DUDHNOI
Traditional rockfall mitigation solution is using drapery meshes function by controlling the falling rocks behind a containment curtain of drapery mesView
star
ROCKFALL MITIGATION MEASURES AGAINST FALLING BOULDERS AT GHOLTEER
ROCKFALL MITIGATION MEASURES AGAINST FALLING BOULDERS AT GHOLTEER
As per the site observations and previous history of rockfall incidents in this area, existing nallah location between Ch 379+450 km to Ch 379+550 km View
star
ROCKFALL MITIGATION MEASURES ALONG KONKAN RAILWAY ROUTE,INDIA
ROCKFALL MITIGATION MEASURES ALONG KONKAN RAILWAY ROUTE,INDIA
Based upon the problem, different solutions were proposed in this project. To mitigate rockfall from the hill side slopes, mechanically woven hexagonView
star
ROCKFALL MITIGATION MEASURES AT PATALGANGA VALLEY, UTTARAKHAND
ROCKFALL MITIGATION MEASURES AT PATALGANGA VALLEY, UTTARAKHAND
As per the site observations and previous history of rockfall incidents in this area, 4 critical locations are identified as the critical locations baView
star
ROCKFALL MITIGATION MEASURES FOR HILL SLOPE AT SHRI RAM LAXMAN GAD
ROCKFALL MITIGATION MEASURES FOR HILL SLOPE AT SHRI RAM LAXMAN GAD
Selection of rockfall mitigation was done in such a way that the drapery/netting shall be capable of retaining detached boulders of small as well as lView
star
ROCKFALL MITIGATION MEASURES FOR PEACOCK PROJECT, RABALE
ROCKFALL MITIGATION MEASURES FOR PEACOCK PROJECT, RABALE
After studying the geological and topographical details, suitable rockfall mitigation solutions were devised to contain rocks falling from the face. TView
star
ROCKFALL MITIGATION WORKS ALONG RAILWAY TRACK – VANGAL AND KARUR
ROCKFALL MITIGATION WORKS ALONG RAILWAY TRACK – VANGAL AND KARUR
To reduce the risk of falling rock from cut slope of approx. 15m on to the railway line, Maccaferri proposed secured drapery system with raster of naiView
star
ROCKFALL MITIGATION WORKS ALONG SOUTH-WESTERN RAILWAYS, KARNATAKA
ROCKFALL MITIGATION WORKS ALONG SOUTH-WESTERN RAILWAYS, KARNATAKA
As per the site observations and previous history of rockfall events, multiple locations have been identified as the critical locations. Among these,View
star
ROCKFALL MITIGATION WORKS AT SAPTHSHRUNGI  
ROCKFALL MITIGATION WORKS AT SAPTHSHRUNGI  
Presence of heavy joint loose rock mass at the top of the cliff, and multiple vertical open joints in rock mass on vertical slope above and around theView
star
ROCKFALL MITIGATION WORKS AT ST-1 OF TEESTA STAGE-III HEP, SIKKIM
ROCKFALL MITIGATION WORKS AT ST-1 OF TEESTA STAGE-III HEP, SIKKIM
As per the site observations and previous history of rockfall events, the critical location above the spillway tunnel, ST-1 has been identified based View
star
ROCKFALL MITIGATION WORKS ON HILLSIDE – HELANG, UTTARAKHAND
ROCKFALL MITIGATION WORKS ON HILLSIDE – HELANG, UTTARAKHAND
The selection of system had to be resilient to subsurface water, high seismic forces, and steep topography. On the hillside, where there is a rocky stView
star
ROCKFALL MITIGATION WORKS- CS DAM TOP-TEESTA STAGE-III HEP, SIKKIM
ROCKFALL MITIGATION WORKS- CS DAM TOP-TEESTA STAGE-III HEP, SIKKIM
As per the site observations and previous history of rockfall events, the critical location above the Chute Spillway(CS) Dam top has been identified bView
star
ROCKFALL MITIGATION WORKS- DHAULIGANGA HEP STATION, UTTARAKHAND
ROCKFALL MITIGATION WORKS- DHAULIGANGA HEP STATION, UTTARAKHAND
As per the site observations and previous history of rockfall events, the stretch above the buildings have been identified as the critical location baView
star
ROCKFALL MITIGATION WORKS- MAT – TEESTA STAGE-III HEP, SIKKIM
ROCKFALL MITIGATION WORKS- MAT – TEESTA STAGE-III HEP, SIKKIM
As per the site observations and previous history of rockfall events, the critical location above the main access tunnel(MAT) portals for power house View
star
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RView
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringView
star
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mView
star
ROCKFALL PROTECTION WORK AT CCTEB, KHAD CITY RAJGURUNAGAR, PUNE
ROCKFALL PROTECTION WORK AT CCTEB, KHAD CITY RAJGURUNAGAR, PUNE
A rockfall mitigation solution involving secured drapery was installed to capture and contain rocks falling from the face. The close proximity of the View
star
ROCKFALL PROTECTION WORKS ALONG RAILWAY LINE VANGAL & KARUR
ROCKFALL PROTECTION WORKS ALONG RAILWAY LINE VANGAL & KARUR
To reduce the risk of rockfall on to railway line, it was proposed to drape the surface of the exposed cut slope with HEA square panels and chain linkView
star
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thView
star
SABARMATI RIVER FRONT DEVELOPMENT PROJECT
SABARMATI RIVER FRONT DEVELOPMENT PROJECT
Terramesh® system with gabion facia and mesh as reinforcement was selected as the best solution due to its environmental friendliness. The system wView
star
SADAWARNA DAM PARAMESH WALL
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshView
star
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for View
star
SEATION TRAMWAY
SEATION TRAMWAY
The site is situated above an area of soft soil that required  substantial ground improvement.The new platform area   adjacent to View
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with View
star
SHORE PROTECTION OF RIVER MAHANADI
SHORE PROTECTION OF RIVER MAHANADI
This was a world bank aided project. The project involved launching of pre-filled gabion mattress in India. In the rehabilitation process, the eroded View
star
SIX LANING OF GURGAON-KOTPUTLI-JAIPUR SECTION OF NH-8
SIX LANING OF GURGAON-KOTPUTLI-JAIPUR SECTION OF NH-8
Maccaferri proposed a better alternative solution of placing a layer of MacDrain® behind the retaining wall, replacing the conventional drainage arrView
star
SLOPE PROTECTION – ALONG PEDDAR ROAD NEAR MALABAR HILL, MUMBAI
SLOPE PROTECTION – ALONG PEDDAR ROAD NEAR MALABAR HILL, MUMBAI
Slope protection measures in the involving toe wall near the slope toe, biodegradable erosion control mat, mechanically woven double twist (DT) mesh wView
star
SLOPE PROTECTION AT KOTESHWAR MAHADEV TEMPLE
SLOPE PROTECTION AT KOTESHWAR MAHADEV TEMPLE
As the temple was located in high flood zone it was necessary to provide retaining structure which is permeable and free draining. Taking in to consView
star
SLOPE PROTECTION MEASURES – HILL SIDE SLOPE AT BIRAHI, UTTARAKHAND
SLOPE PROTECTION MEASURES – HILL SIDE SLOPE AT BIRAHI, UTTARAKHAND
After a judicious assessment of the site conditions, a combination of slope protection solutions along with a 100m long 3m high gabion toe wall has beView
star
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VView
star
SLOPE PROTECTION WORKS AT ZIRAKPUR-PARWANOO SECTION NH-22
SLOPE PROTECTION WORKS AT ZIRAKPUR-PARWANOO SECTION NH-22
The highway concessionaire (Himalayan Expressway Ltd), Jaypee approached Maccaferri for providing a solution to overcome the slope hazards. The entirView
star
SLOPE PROTECTION/ROCKFALL MITIGATION WORKS ALONG BOMDIR LUMLA ROAD
SLOPE PROTECTION/ROCKFALL MITIGATION WORKS ALONG BOMDIR LUMLA ROAD
The proposed solutions consist of following systems: Slide stretch: – Loose scaling – MacMat HS(+Bio-Engineering measures) with top anchoring and sView
star
SLOPE RETENTION -ACCESS RAMP WALL OF ‘THE PROMONT’ HOUSING PROJECT
SLOPE RETENTION -ACCESS RAMP WALL OF ‘THE PROMONT’ HOUSING PROJECT
The solution comprised of Gabion retaining wall (Height – 4.5m to 14.0m) (with base and /or lateral anchoring) with surcharge soil slope of max. 30 deView
star
SLOPE STABILISATION – TOP WALL OF ‘THE PROMONT’ HOUSING PROJECT
SLOPE STABILISATION – TOP WALL OF ‘THE PROMONT’ HOUSING PROJECT
Different combinations were proposed based on wall alignment, space availability, height and insitu strata topography. The general solutions are as fView
star
SLOPE STABILISATION PORT OF ZIERBENA
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryView
star
SLOPE STABILISATION- BOTTOM WALL OF ‘THE PROMONT’ HOUSING PROJECT
SLOPE STABILISATION- BOTTOM WALL OF ‘THE PROMONT’ HOUSING PROJECT
The solution comprised of nailing (HYSD bars of 25mm dia) with Gabion facia of width 2m. The Gabion facia units had H-frame arrangement at the rear eView
star
SLOPE STABILISATION- WALL NEAR CDP ROAD OF ‘THE PROMONT’ PROJECT
SLOPE STABILISATION- WALL NEAR CDP ROAD OF ‘THE PROMONT’ PROJECT
The solution comprised of nailing with Gabion facia for lower portion and Gabion wall at upper portion of the slope. The gabion facia units at foundaView
star
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeView
star
SLOPE SURFACE EROSION PROTECTION WORKS
SLOPE SURFACE EROSION PROTECTION WORKS
The client was looking for the solution from which they can ensure easy installation and quick growth of vegetation.  The soil used to prepare slope View
star
Small green lung in the Metelliana Valley
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoView
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designView
star
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fView
star
St Andrews Royal & Ancient Golf Club
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byView
star
STABILISATION OF OVERBURDEN DUMPS IN SINGRAULI
STABILISATION OF OVERBURDEN DUMPS IN SINGRAULI
The slope was divided into fragments with berms in between. Gabion toe walls were placed at the toe of each slope fragment and mulching (to promote veView
star
SUBGRADE IMPROVEMENT OF PAVEMENT
SUBGRADE IMPROVEMENT OF PAVEMENT
The solution involves, reinforcing the soft subgrade in order to improve the load bearing capacity and subgrade property in terms of CBR, by using biaView
star
SUNSET CLIFF
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersView
star
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tView
star
TEMPORARY PROTECTION MEASURES FOR  KIRATPUR-NERCHOWK PART OF NH-21
TEMPORARY PROTECTION MEASURES FOR  KIRATPUR-NERCHOWK PART OF NH-21
As per the site observations, multiple Rockfall barrier lines of nominal capacity 750kJ (RB 750 Plus) and 4 m height has been constructed for 300 m ovView
star
TERRAMESH RD PATRIMONIAL
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the View
star
TERRAMESH REINFORCED SOIL WALL TO APPROACH A RAILWAY OVER BRIDGE (
TERRAMESH REINFORCED SOIL WALL TO APPROACH A RAILWAY OVER BRIDGE (
The Terramesh System was preferred due to the cost effectiveness when compared with alternative solutions. The construction of Terramesh in fact did nView
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaView
star
TERRAMESH SYSTEM AT NAGAR
TERRAMESH SYSTEM AT NAGAR
Terramesh (back to back) with a gabion facia was adopted as a solution. Terramesh was selected over other types of reinforced soil wall systems due toView
star
TERRAMESH WALL SYSTEM IN NANDGAON
TERRAMESH WALL SYSTEM IN NANDGAON
Terramesh with gabion facia was adopted as a solution. It was the first of its kind for the client, Maharashtra State Road Development Corporation LimView
star
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bView
star
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengView
star
The Ash Yard of the Thermal Power Plant
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionView
star
THE GRAND BOHEMIAN HOTEL
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prView
star
THE NEW ROUTE DU LITTORAL
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.View
star
THREE CITIES TRAIL
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and  implemented a tie-back reinforced gabion retaining wall to   act as the slView
star
TK 2018 – 006 – MRV
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxView
star
TSHO ROLPA GLACIER LAKE OUT BURST PROTECTION WORK
TSHO ROLPA GLACIER LAKE OUT BURST PROTECTION WORK
Lined canal (using Gabions and Reno Mattresses) and a gated structure was constructed for controlled discharge of water which helped lower the water lView
star
VADODARA-MUMBAI EXPRESSWAY – TWO TIERED WALL
VADODARA-MUMBAI EXPRESSWAY – TWO TIERED WALL
Out of the various alternatives, Reinforced Soil (RS) Wall system MacRes with precast concrete panels as fascia and BBA certified ParaWeb geostrip as View
star
VARIOUS STRUCTURES AT ANANDPUR SAHIB CANAL AT NH-21
VARIOUS STRUCTURES AT ANANDPUR SAHIB CANAL AT NH-21
Reinforced soil wall with concrete panels as facia and Paraweb as reinforcement was selected as the best solution. Three types of panels were used as View
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comView
star
WALTHAM HIGH SCHOOL
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mView
star

Haven’t found what you were looking for?

Filter by:
Advanced Search












Meet our Experts

We represent a winning partner for the complex world of civil and industrial constructions. Thanks to a wide range, our products are the answer to the various technical demands of the sector: from drainage and protection to water and waterproofing of structures and coverings, to energy-saving to housing comfort, from steam control to issues concerning.