Problema

WSP Canada was the prime consultant on a natural gas compression station expansion project for Enbridge Pipelines Inc., located in Savona, which is 38 Kms west of Kamloops, BC. According to Geotechnical assessment done by BGC Engineering Inc. (hired by Enbridge), a steep uphill slope was present along the south edge of the site. Loose rocks from the slope could be a hazard to the compression station located at the bottom of the slope. WSP was working on 2 possible options to protect the site from any potential rockfall hazard. One was a gravity retaining wall (gabion) and the second was a rockfall catchment fence.

Solución

Maccaferri Canada was asked to provide preliminary design and cost estimates for a gravity retaining wall and a rockfall catchment fence. After reviewing the geotechnical assessment provided by BGC and a thorough site visit, Maccaferri proposed a 2000 KJ barrier. This barrier was 175 linear meter and 4 meter high.

Abre WA
Cotiza aquí!
Hola, estamos para servirle! En qué le podemos apoyar?
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.