Facebook pixel

MSE WALL – BATU HIJAU NEWMONT

Home > Success stories > MSE WALL – BATU HIJAU NEWMONT

Reinforced Soil Walls and Slope Reinforcement

2020

SEJORONG - NUSA TENGGARA BARAT - Indonesia

PT. NEWMONT NUSA TENGGARA

MSE WALL – BATU HIJAU NEWMONT

Problem

PT Newmont Nusa Tenggara is a mining company producing primarily copper. PT Newmont would like to built a concentrator to source the valuable ore from the excavated material. The concentrator, built at Sejorong, required a Mechanical Stabilized Earth (MSE) wall to be constructed as a center piece of the entire facility. Limited and difficult site access, lack of level ground, hazard earthquake zone, lack of availability of local construction material, shortage of skilled labor, and 25 meter height of vertical wall to kept maximum usage of the area shall be taken into consideration on the MSE design.

Solution

In early 1997 PT Maccaferri Indonesia proposed Terramesh system to built a 30 m height of vertical MSE wall. Macstar software (Maccaferri inhouse software that use limit equilibrium method) was extensively used during the design process. PT Fluor Daniel Indonesia were responsible for acting as the Owner Engineer for PT Newmont Nusa Tenggara. PT Maccaferri Indonesia worked closely with PT Golder Geotek Utama to evalaluated the design to fine tune the structure. The final designed optimised the reinforcement spacing and tail length based on the material ready at site for backfill in the reinforced zone. Consideration need to be given to an earthquake load acceleration in order of 0.32g. The structure was completed in less than 12 months. Over 3400 m2 of wall face was built with the capacity of installation average 50 m2/day. The teramesh “tail” structure embedded almost 23 m into the soil embankment. Various maintenance tunnels placed in the middle of the wall which required more detailed design and installation.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.