Success Stories
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was considered sufficient to construct a stepped retaining wall from massViewstar
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion apron (0.5m thick). The volume of protection was approximately 13,Viewstar
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecViewstar
AEROPORTO PLÁCIDO DE CASTRO
Debido a esto fue necesario la adopción de un geosintético tipo geomembrana para impermeabilización de los laterales de la pista y también de un geViewstar
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and proposed the MacWall Landmark segmental reinforced soil wall system. MViewstar
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Viewstar
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or even a submerged barrier that goes parallel to the shore. Maccaferri IndonViewstar
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosViewstar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErViewstar
AYAMARU LAKE EMBANKMENT IN SORONG, WEST PAPUA
Maccaferri proposes a reliable solution by using Reno Mattresses Plus as a substitute for concrete to cover the embankment in Lake Ayamaru. The designViewstar
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxViewstar
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CoViewstar
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaViewstar
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaViewstar
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TViewstar
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TViewstar
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solutionViewstar
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsViewstar
BASAL REINFORCEMENT AT EMBUNG AJI RADEN
Soil replacement was decided to replace 1m of soft soil below the embankment. Before backfilling the excavated area, basal reinforcement was laid, togViewstar
BASES AVANCÉES DE LA MINUSMA
Pour ce faire, les Defencell Mac, (éléments multicellulaires fabriqués à partir de panneaux en treillis soudés et reliés à l’aide de spirales) ont Viewstar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trViewstar
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Viewstar
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Viewstar
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Viewstar
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up with a suitable solution for the posed site problems. It was agreed that Viewstar
BONIFICA DISCARICA PONTONE PONTONICCHIO LESINA FOGGIA
La ditta Favellato avvierà e porterà a compimento un ampio programma di Messa in Sicurezza (MISP) della vasta area di discarica (11 ettari ovvero Viewstar
BONIFICA DISCARICA PONTONE PONTONICCHIO LESINA FOGGIA
La ditta Favellato avvierà e porterà a compimento un ampio programma di Messa in Sicurezza (MISP) della vasta area di discarica (11 ettari ovvero Viewstar
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings extensively along the 35-mile route which connects Edinburgh to Viewstar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshViewstar
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenViewstar
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisViewstar
CHANNEL REVETMENT AT HEAVEN MEMORIAL PARK CEMETERY
The Revetment Structure was constructed and completed using Gabion, Reno Mattress, and Terramesh System. These materials are mainly made of Double-TwiViewstar
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installViewstar
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installViewstar
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the instaViewstar
CIAWI DAM DROP STRUCTURE
The river diversion structure is mainly using gabions and reno mattresses with stone filling as the core. Steel anchors were installed to keep the gabViewstar
COASTAL PROTECTION IN KENJERAN
A 340m long gabion sea wall was installed to protect it against tidal wave that can be erosion issue in the coastal area. Countermeasures to face the Viewstar
COASTAL PROTECTION IN TANAH LOT, BALI
A 100m long gabion sea wall was installed in front of the property to protect it against wave action during the rainy season. Countermeasures to faceViewstar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Viewstar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Viewstar
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by 79 new spaces, to the west of the petrol filling station. The proposal Viewstar
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically stabilised earth walls into the pile foundations beneath. The maximum heightViewstar
COMBINATION OF MSE WALL & EROSION CONTROL FOR LANDSLIDE MANAGEMENT
Maccaferri Indonesia recommends a combination of solutions involving MSE Wall and erosion control using Terramesh as a reinforcement and MacMat that fViewstar
CONSOLIDAMENTO DELLA RUPE DEL CENTRO STORICO DI CASTIGNANO (AP)
Al fine di salvaguardare i fabbricati del centro storico di Castignano e di mettere in sicurezza l’asse viario situato al di sotto della rupe, è stViewstar
CRECHE HEROÍNAS DO LAR
El sistema de estabilización está compuesto por una malla metálica de alta resistencia, MacMat® MO 200, unida a la cabeza de las grapas a través deViewstar
CRUSHER WALL AT INDOCEMENT FACTORY
After a comparison in terms of cost and construction timing, the Client opted for the construction of an Hybrid Reinforced Soil Wall combining metal rViewstar
CUT-SLOPE STABILISATION USING SOIL NAILING AT VILLUKURI
As per geotechnical investigations carried out between KM 43/000 to KM 70/250, rocky strata is overlain by lateritic soil, clayey soil, river and cViewstar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basViewstar
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonViewstar
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeViewstar
DÉPLACEMENT DIGUES SUITE À CONSTRUCTION DE LA NOUVELLE LIGNE TGV
Sur la rive droite, à Lunel, la digue définitive est conçue pour être déversante sur un linéaire de 150 m. En amont et en aval, la digue est raccorViewstar
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeViewstar
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeViewstar
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeViewstar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tViewstar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tViewstar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tViewstar
DISCARICA DI BELLOLAMPO V VASCA
La realizzazione della vasca prevede l'impiego di una membrana in HDPE, di un gesontetico bentonitico e di un gecomposito drenante per la captazioViewstar
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Viewstar
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Viewstar
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeViewstar
EROSION CONTROL AT GONDANG DAM
To mitigate the surface erosion of cut slopes, an Erosion Control System was chosen due to its easy application, permeable material, and competitive pViewstar
EROSION CONTROL AT KARALLOE DAM
MacMat EM® and MacMat HS® with Vegetation are the solutions selected to protect the cut slopes at Karalloe Dam. MacMat EM® is an erosion control blViewstar
EROSION CONTROL AT LEUWIKERIS DAM – PACKAGE 1
An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cViewstar
EROSION CONTROL AT OTORITA BATAM HOSPITAL (RSOB)
Maccaferri Indonesia meets those criteria with an erosion control system that enables vegetation, is permeable, easy to install, price competitive, anViewstar
EROSION CONTROL AT PIDEKSO DAM
In order to mitigate the risk of surface erosion, Erosion Control System was chosen due to its easy application, permeable material, and competitive pViewstar
EROSION CONTROL AT WAY SEKAMPUNG DAM
An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cViewstar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aViewstar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aViewstar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomatViewstar
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionViewstar
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionViewstar
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosViewstar
EROSION CONTROL SYSTEM AT BERINGIN SILA DAM
Our erosion control system is made of a combination of one unity between HDPE geomat and a double-twisted wire mesh panel with longitudinal high tensiViewstar
EROSION CONTROL SYSTEM WITH POLYBAG METHOD AT TIU SUNTUK DAM
In order to mitigate the surface erosion of slopes, the Erosion Control System was chosen due to its easy application, permeable material, and competiViewstar
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeViewstar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toViewstar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toViewstar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toViewstar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system creViewstar
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theViewstar
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineViewstar
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysViewstar
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdViewstar
HELLOMAC – Ponza – Cala Fonte
Maccaferri has always pursued innovation and has already taken part in this digital transformation developing a new alert system: HELLOMAC. Thanks to Viewstar
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Viewstar
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Viewstar
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Viewstar
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useViewstar
INDOCEMENT FACTORY RIVERBANK PROTECTION
The solution proposed by Maccaferri involved mainly Gabion structures coupled with Reno Mattresses used as toe scouring protection. The solution, if cViewstar
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beViewstar
KALIORANG, WING WALL PIT CRUSHER
The solution proposed was Paramesh System (Paralink & Terramesh) from Maccaferri Indonesia. The combination of hybrid material like Terramesh and ParaViewstar
KANAWA SLOPE AND RIVER PROTECTION
The Public Works Department decided to build a Reinforced Soil Slope as retaining structure and a gabion-made drop structure to dissipate the energy oViewstar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawViewstar
LANDSLIDE REHABILITATION MAKALE-PALOPO ROAD
The subgrade consists of andesit with limited and isolated area, so it is not possible for heavy equipments to do pilling work. A structure with permeViewstar
LANDSLIDE REHABILITATION RIAU – JAMBI ROAD
Maccaferri Terramesh System as a flexible structure able to provide the solution. Construction of a reinforced embankment with a gabion facing structuViewstar
LANDSLIDE REHABILITATION SP. TUAN – MERLUNG ROAD
Maccaferri Terramesh System as a flexible structure can provide solution for the problems. Reinforced embankment structure is able to reconstructed thViewstar
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyViewstar
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of ground level wet and dry holding lagoons. These were impermeably lineViewstar
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Viewstar
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeViewstar
LOW PERMEABILITY LINING AT KUNINGAN DAM
A 2,500 m2 area of MacLine GCL W10 has been installed on an existing slope at the side of the access road. The construction was then continued with anViewstar
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iViewstar
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipViewstar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallViewstar
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaViewstar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiViewstar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiViewstar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiViewstar
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duViewstar
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duViewstar
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocksViewstar
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesViewstar
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Viewstar
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesViewstar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Viewstar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Viewstar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shiftiViewstar
MSE WALL – BATU HIJAU NEWMONT
In early 1997 PT Maccaferri Indonesia proposed Terramesh system to built a 30 m height of vertical MSE wall. Macstar software (Maccaferri inhouse softViewstar
MSE WALL FOR ROAD REHABILITATION AT BUKIT KEMUNING
Maccaferri Indonesia proposes to use its innovative Paramesh system – an MSE (Mechanically Stabilized Earth) wall – as a solution to the landslideViewstar
MSE WALL FOR SLOPE PROTECTION AT KARIANGAU OFFSHORE
PT. Maccaferri Indonesia proposed the hybrid MSE Wall structure called Terramesh System as an alternative to mass gravity retaining structure with gaViewstar
MSE WALL SUPPORTS THE ROAD CONNECTION OF NORTH BALI AND SOUTH BALI
As a solution to stabilize the embankment slope, a Paramesh System was proposed. Paramesh system consists of Para Products (Geogrid) as a primary reinViewstar
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retViewstar
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thViewstar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thViewstar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thViewstar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thViewstar
NANJUNG TUNNEL EROSION CONTROL
An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cViewstar
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureViewstar
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureViewstar
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureViewstar
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Viewstar
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to impermeably line the attenuation pond and this was accepted by client HitViewstar
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having removed the refuse, a separator geotextile was placed to provide a Viewstar
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsViewstar
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsViewstar
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsViewstar
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoViewstar
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aViewstar
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aViewstar
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aViewstar
PARAMESH SYSTEM OF SOEKARNO HATTA RAILWAY PROJECT
Following the described and identified problems, Paramesh – MSE Wall System was chosen compared to conventional method. Paramesh System by MaccaferrViewstar
PARAMESH WALL (MSE WALL) AT NICKEL LATERITE SMELTER PROJECT
As the Client needed a solution that not as expensive as the traditional concrete retaining structure, Paramesh System as a retaining wall with heightViewstar
PARAMESH WALL AT DAARUT TAUHIID MOSQUE, BATAM – KEPULAUAN RIAU
Maccaferri Indonesia recommends the innovation of retaining wall structure using Paramesh Wall because of its ability on permeability, flexibility, duViewstar
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshViewstar
PARAMESH WALL OF TANA TORAJA AIRPORT
Different types of retaining structures have been considered during the design stages: traditional concrete walls, bored piles and hybrid MSE walls (PViewstar
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Viewstar
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiViewstar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Viewstar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Viewstar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Viewstar
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofViewstar
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential for differential movement were resolved by supporting the approach rViewstar
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Viewstar
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aViewstar
PROTECTION DE BERGES – M2565 – DÉPÔT CACHAT
Une solution de confortement de berge par un massif en sol renforcé a été retenue, pour rétablir le talus d’une douzaine de mètre de hauteur. En piViewstar
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Viewstar
PROTEZIONE CADUTA MASSI – S.P. 477 DI CASTELLUCCIO DI NORCIA (PG)
Considerato lo stato dei luoghi, l’ampiezza dell’area oggetto di possibili distacchi e l’urgenza di messa in sicurezza della viabilità, è stato reaViewstar
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a strong rodent deterrent. Unlike any plastic grids or thin rabbit netViewstar
RANCAMAYA RETAINING WALL
As landslide rehabilitation, Maccaferri provided a solution using a 7 m high Gabion made retaining wall. In addition, as scour protection of the GabioViewstar
RD 93 ESPENEL SECTEUR 2 – PROTECTION CONTRE LES CHUTES DE PIERRES
La société Maccaferri a été choisie pour fournir les écrans pare-blocs : ce sont cinq lignes d’écrans EPFM 5000 qui ont été installées. La maitriseViewstar
RD980 RECTIFICATION DE VIRAGES
Initialement, le projet prévoyait de conforter les talus par réalisation de parois clouées. France Maccaferri, sollicité par l’entreprise TETRA, a Viewstar
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiViewstar
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizViewstar
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininViewstar
REINFORCED SOIL STRUCTURE NAGREG RING ROAD
Maccaferri Terramesh System and Macgrid as a flexible structure can provide solution for the problems. Reinforced embankment structure is able to haveViewstar
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Viewstar
REMEDIATION AND ENVIRONMENTAL RESTORATION OF THE MUNICIPAL DUMP
L’impiego del sistema terramesh “Liner” costituito dal sistema Terramesh Verde o Liner con inserito all’interno un cassero sul quale è stato posto Viewstar
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in the Windsor area, was tasked by the Town of Amherstburg to devise aViewstar
RESTAURACIÓN – AUTÓDROMO INTERNACIONAL DE GOIÂNI
Pensando en ello, AGETOP, la agencia estatal responsable de la administración del autódromo, decidió utilizar geomallas para el refuerzo del asfaltViewstar
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofViewstar
RETAINING WALL AT BATAM CHURCH REVITALIZATION
Terramesh System decided to build in the area affected by the landslide. The foundation uses Terramesh System with 2m depth, and the structure on the Viewstar
RETAINING WALL AT KUNINGAN DAM
A combination of Terramesh System and geogrid combined with an additional structure of wrapped-around geogrid were built with 10.0m – 13.0m height. MaViewstar
RETAINING WALL BONTANG CITY OFFICE
Maccaferri Terramesh System as a flexible structure can provide solution for the problem of unstable soil condition. It is a reinforced embankment strViewstar
RETAINING WALL FOR LANDSLIDE MITIGATION, JAMBI
The Public Works Department decided to build a reinforced soil wall as retaining structure using Maccaferri Terramesh System modular and flexible elemViewstar
RETAINING WALL REHABILITATION AT CEMETERY BOGOR
Maccaferri proposed to use MSE Wall built behind the existing masonry wall. The MSE Wall consisted of Terrramesh and MacGrid WG20. In order to installViewstar
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was originally proposed within the design. However, the PVC coating on weldedViewstar
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyViewstar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeViewstar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreenViewstar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeViewstar
RIVER BANK PROTECTION AT CITRAGRAN CIBUBUR
Maccaferri as a slope protection specialist provided cost-effective, environmentally friendly, and tailored solutions for the client’s problems. UsiViewstar
RIVER BANK PROTECTION GRESIK
Maccaferri proposed a reliable solution using a revetment made from Reno Mattresses in order to provide protection against the erosion affecting the bViewstar
RIVER REVETMENT IN WAY LIRANG
The Public Works Department decided therefore to build the dike and to cover it with a durable and flexible revetment system to prevent the erosion ofViewstar
RIVER REVETMENT WAY RUHU
The check dam is 3,5 m high and 35 m wide provided with a 15 m long stilling basin. The weir and the stilling basin are entirely built using flexible Viewstar
RIVER TRAINING WORK SENTUL NIRWANA
Combination of Maccaferri Gabion and Reno Mattress become a right choice to solve the problem on site. Gabion as counterweight structure able to maintViewstar
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Viewstar
ROCKFALL BARRIER AT MARTABE GOLD MINE, SOUTH TAPANULI
The Rockfall Mitigation Barrier by Maccaferri is certified on “EOTA-EAD 340059-00-0106 – Falling Rock Protection Kits” according to the dynamic imViewstar
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringViewstar
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringViewstar
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringViewstar
ROCKFALL MITIGATION (NETTING) AT PRESERVASI JALAN AEGELA – BATAS K
Rockfall Netting – Secured Drapery System was applied by using a combination of Steelgrid HR30 as Netting Material and Rock Nailing with Length of 8Viewstar
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RViewstar
ROCKFALL PROTECTION ALONG MAROS ELEVATED ROAD
Our engineers, together with the local Public Works technical department based in Makassar, designed the rockfall drapery system. The client wanted a Viewstar
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mViewstar
ROCKFALL PROTECTION FOR NARINGGUL ACCESS ROAD WITH SIMPLE DRAPERY
The client required two types of steel mesh with a certain specification. The first one was a high strength wire mesh, Zn-Al coated with 150 kN/m tensViewstar
ROCKFALL PROTECTION OF BTS. BANDUNG/CIANJUR-NARINGGUL-CIDAUN ROAD
To comply with the requirements of enduring the estimated falling rocks, Maccaferri Indonesia provided a rockfall barrier (RB 3000) to dissipate the eViewstar
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thViewstar
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thViewstar
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thViewstar
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshViewstar
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Viewstar
SAMPOERNA ACADEMY GREEN TERRAMESH
MSE Wall structure by Maccaferri consists of Green Terramesh and Macgrid WG 15 (Geogrid) as the main reinforcement. Green Terramesh, that is fabricateViewstar
SEATION TRAMWAY
The site is situated above an area of soft soil that required substantial ground improvement.The new platform area adjacent to Viewstar
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Viewstar
SÉCURISATION DE LA ROUTE M2565 – LE COUGNE
France Maccaferri a été sollicitée par l’entreprise Garelli pour dimensionner, concevoir, fabriquer et fournir un écran débris flow (DF) capable deViewstar
SÉCURISATION DU BARRAGE DU PLANAS
Le choix d’une rehausse de la digue actuelle par l’aval est motivé d’une part par la réalisation des travaux à l’abri de la digue existante en cas Viewstar
SEMARANG-DEMAK TIDAL FLOOD CONTROL PROJECT
As contractor, Nindya Karya – Mataram KSO has been instructed to install an embankment near Ahmad Yani Airport to control seawater from flowing througViewstar
SENTANI NATIONAL ROAD ROCKFALL PROTECTION
The solution chosen by the Ministry of Public Works was to substitute the expensive and rigid shotcrete protection with a more flexible and permeable Viewstar
SINDANGHEULA DAM
An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cViewstar
SISTEMAZIONE IDRAULICA SUL FIUME METAURO
La realizzazione di un’opera di sostegno in gabbioni si è rivelata, grazie alla flessibilità che la caratterizza, la soluzione più adeguata per ricViewstar
SLOPE PROTECTION JATIGEDE DAM PROJECT
The problem was solved with the implementation of a combo between Maccaferri Terramesh® System and bore piles. The bore pile structure purpose is toViewstar
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VViewstar
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryViewstar
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeViewstar
SLOPE STABILIZATION AT MUARA LABOH GEOTHERMAL POWER PROJECT
To mitigate the slope surfaces and prevent the further possibility of landslides, several solutions are combined due to the height conditions of the sViewstar
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoViewstar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designViewstar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designViewstar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designViewstar
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fViewstar
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byViewstar
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersViewstar
TANA TORAJA AIRPORT PARAMESH
Maccaferri hybrid MSE structures (DT + Paralink) have been selected as the best solution. In October 2015, the construction of the first Paramesh re-tViewstar
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tViewstar
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tViewstar
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed&nbsViewstar
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Viewstar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaViewstar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaViewstar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaViewstar
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengViewstar
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionViewstar
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prViewstar
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Viewstar
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and implemented a tie-back reinforced gabion retaining wall to act as the slViewstar
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxViewstar
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comViewstar
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mViewstar
WAY ARA RIVER BANK PROTECTION
The Public Works Department decided therefore to build the dike and to cover it with a durable and flexible revetment system to prevent the erosion ofViewstar
WAY LOLA BESAR RIVER BANK PROTECTION
The Public Works Department decided therefore to build the dike and to cover it in with a durable and flexible revetment system to prevent the erosionViewstar
WAY LOLA KECIL RIVER BANK PROTECTION
The Public Works Department decided therefore to build the dike and to cover it in with a durable and flexible revetment system to prevent the erosionViewstar
ΤΕΛΙΚΗ ΚΑΛΥΨΗ ΧΑΔΑ
Ο γεωσυνθετικός φραγμός από μπετονίτη MACLINE GCL W21 τοποθετήθηκε στη τελική κάλυψη των ΧΑΔΑ για να σφραγίσει αποτελεσματικά την είσοδο ύδατος πουViewstar
ΤΕΛΙΚΗ ΚΑΛΥΨΗ ΧΑΔΑ
Ο γεωσυνθετικός φραγμός από μπετονίτη MACLINE GCL W21 τοποθετήθηκε στη τελική κάλυψη των ΧΑΔΑ για να σφραγίσει αποτελεσματικά την είσοδο ύδατος πουViewstar
Haven’t found what you were looking for?
Meet our Experts
We represent a winning partner for the complex world of civil and industrial constructions. Thanks to a wide range, our products are the answer to the various technical demands of the sector: from drainage and protection to water and waterproofing of structures and coverings, to energy-saving to housing comfort, from steam control to issues concerning.