Success Stories

Success Stories

ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or even a submerged barrier that goes parallel to the shore. Maccaferri IndonView
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErView
star
BAFOKENG CIVIC CENTRE MACWALL
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaView
star
BALESIN ISLAND CLUB RUNWAY
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TView
star
BASAL REINFORCEMENT AT EMBUNG AJI RADEN
BASAL REINFORCEMENT AT EMBUNG AJI RADEN
Soil replacement was decided to replace 1m of soft soil below the embankment. Before backfilling the excavated area, basal reinforcement was laid, togView
star
BIFURCATION A10/171 ORLEANS
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7View
star
BONIFICA DISCARICA PONTONE PONTONICCHIO LESINA FOGGIA
BONIFICA DISCARICA PONTONE PONTONICCHIO LESINA FOGGIA
La ditta Favellato avvierà e porterà a compimento un ampio programma di Messa in Sicurezza (MISP) della vasta area di discarica (11 ettari ovvero View
star
CHANNEL REVETMENT AT HEAVEN MEMORIAL PARK CEMETERY
The Revetment Structure was constructed and completed using Gabion, Reno Mattress, and Terramesh System. These materials are mainly made of Double-TwiView
star
CHARLEROI HOSPITAL
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installView
star
CIAWI DAM DROP STRUCTURE
CIAWI DAM DROP STRUCTURE
The river diversion structure is mainly using gabions and reno mattresses with stone filling as the core. Steel anchors were installed to keep the gabView
star
COASTAL PROTECTION IN KENJERAN
COASTAL PROTECTION IN KENJERAN
A 340m long gabion sea wall was installed to protect it against tidal wave that can be erosion issue in the coastal area. Countermeasures to face the View
star
COASTAL PROTECTION IN TANAH LOT, BALI
COASTAL PROTECTION IN TANAH LOT, BALI
A 100m long gabion sea wall was installed in front of the property to protect it against wave action during the rainy season. Countermeasures to faceView
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the View
star
CRECHE HEROÍNAS DO LAR
CRECHE HEROÍNAS DO LAR
El sistema de estabilización está compuesto por una malla metálica de alta resistencia, MacMat® MO 200, unida a la cabeza de las grapas a través deView
star
CRUSHER WALL AT INDOCEMENT FACTORY
CRUSHER WALL AT INDOCEMENT FACTORY
After a comparison in terms of cost and construction timing, the Client opted for the construction of an Hybrid Reinforced Soil Wall combining metal rView
star
DIDIPIO MINE ACCESS ROAD
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeView
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tView
star
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeView
star
EROSION CONTROL AT GONDANG DAM
To mitigate the surface erosion of cut slopes, an Erosion Control System was chosen due to its easy application, permeable material, and competitive pView
star
EROSION CONTROL AT KARALLOE DAM
EROSION CONTROL AT KARALLOE DAM
MacMat EM® and MacMat HS® with Vegetation are the solutions selected to protect the cut slopes at Karalloe Dam. MacMat EM® is an erosion control blView
star
EROSION CONTROL AT LEUWIKERIS DAM – PACKAGE 1
EROSION CONTROL AT LEUWIKERIS DAM – PACKAGE 1
An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cView
star
EROSION CONTROL AT OTORITA BATAM HOSPITAL (RSOB)
EROSION CONTROL AT OTORITA BATAM HOSPITAL (RSOB)
Maccaferri Indonesia meets those criteria with an erosion control system that enables vegetation, is permeable, easy to install, price competitive, anView
star
EROSION CONTROL AT PIDEKSO DAM
EROSION CONTROL AT PIDEKSO DAM
In order to mitigate the risk of surface erosion, Erosion Control System was chosen due to its easy application, permeable material, and competitive pView
star
EROSION CONTROL AT WAY SEKAMPUNG DAM
EROSION CONTROL AT WAY SEKAMPUNG DAM
An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cView
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aView
star
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionView
star
EROSION CONTROL SYSTEM AT BERINGIN SILA DAM
EROSION CONTROL SYSTEM AT BERINGIN SILA DAM
Our erosion control system is made of a combination of one unity between HDPE geomat and a double-twisted wire mesh panel with longitudinal high tensiView
star
EROSION CONTROL SYSTEM WITH POLYBAG METHOD AT TIU SUNTUK DAM
In order to mitigate the surface erosion of slopes, the Erosion Control System was chosen due to its easy application, permeable material, and competiView
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toView
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-View
star
INDOCEMENT FACTORY RIVERBANK PROTECTION
INDOCEMENT FACTORY RIVERBANK PROTECTION
The solution proposed by Maccaferri involved mainly Gabion structures coupled with Reno Mattresses used as toe scouring protection. The solution, if cView
star
KALIORANG, WING WALL PIT CRUSHER
KALIORANG, WING WALL PIT CRUSHER
The solution proposed was Paramesh System (Paralink & Terramesh) from Maccaferri Indonesia. The combination of hybrid material like Terramesh and ParaView
star
KANAWA SLOPE AND RIVER PROTECTION
KANAWA SLOPE AND RIVER PROTECTION
The Public Works Department decided to build a Reinforced Soil Slope as retaining structure and a gabion-made drop structure to dissipate the energy oView
star
LANDSLIDE REHABILITATION MAKALE-PALOPO ROAD
LANDSLIDE REHABILITATION MAKALE-PALOPO ROAD
The subgrade consists of andesit with limited and isolated area, so it is not possible for heavy equipments to do pilling work. A structure with permeView
star
LANDSLIDE REHABILITATION RIAU – JAMBI ROAD
LANDSLIDE REHABILITATION RIAU – JAMBI ROAD
Maccaferri Terramesh System as a flexible structure able to provide the solution. Construction of a reinforced embankment with a gabion facing structuView
star
LANDSLIDE REHABILITATION SP. TUAN – MERLUNG ROAD
LANDSLIDE REHABILITATION SP. TUAN – MERLUNG ROAD
Maccaferri Terramesh System as a flexible structure can provide solution for the problems. Reinforced embankment structure is able to reconstructed thView
star
LOW PERMEABILITY LINING AT KUNINGAN DAM
LOW PERMEABILITY LINING AT KUNINGAN DAM
A 2,500 m2 area of MacLine GCL W10 has been installed on an existing slope at the side of the access road. The construction was then continued with anView
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiView
star
MANILA-CAVITE EXPRESSWAY
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duView
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting View
star
MSE WALL – BATU HIJAU NEWMONT
MSE WALL – BATU HIJAU NEWMONT
In early 1997 PT Maccaferri Indonesia proposed Terramesh system to built a 30 m height of vertical MSE wall. Macstar software (Maccaferri inhouse softView
star
MSE WALL FOR ROAD REHABILITATION AT BUKIT KEMUNING
MSE WALL FOR ROAD REHABILITATION AT BUKIT KEMUNING
Maccaferri Indonesia proposes to use its innovative Paramesh system – an MSE (Mechanically Stabilized Earth) wall – as a solution to the landslideView
star
MSE WALL FOR SLOPE PROTECTION AT KARIANGAU OFFSHORE
MSE WALL FOR SLOPE PROTECTION AT KARIANGAU OFFSHORE
PT. Maccaferri Indonesia proposed the hybrid MSE Wall structure called Terramesh System as an alternative to mass gravity retaining structure with gaView
star
MSE WALL SUPPORTS THE ROAD CONNECTION OF NORTH BALI AND SOUTH BALI
MSE WALL SUPPORTS THE ROAD CONNECTION OF NORTH BALI AND SOUTH BALI
As a solution to stabilize the embankment slope, a Paramesh System was proposed. Paramesh system consists of Para Products (Geogrid) as a primary reinView
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thView
star
NANJUNG TUNNEL EROSION CONTROL
NANJUNG TUNNEL EROSION CONTROL
An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cView
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureView
star
NL BERGEN
NL BERGEN
The anti-erosion mat MacMat R020 is reinforced by a polyester geogrid with a tensile strength of 20 kN/m. The MacMat R020 was secured to the slope witView
star
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsView
star
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aView
star
PARAMESH SYSTEM OF SOEKARNO HATTA RAILWAY PROJECT  
PARAMESH SYSTEM OF SOEKARNO HATTA RAILWAY PROJECT  
Following the described and identified problems, Paramesh – MSE Wall System was chosen compared to conventional method. Paramesh System by MaccaferrView
star
PARAMESH WALL (MSE WALL) AT NICKEL LATERITE SMELTER PROJECT
PARAMESH WALL (MSE WALL) AT NICKEL LATERITE SMELTER PROJECT
As the Client needed a solution that not as expensive as the traditional concrete retaining structure, Paramesh System as a retaining wall with heightView
star
PARAMESH WALL AT DAARUT TAUHIID MOSQUE, BATAM – KEPULAUAN RIAU
PARAMESH WALL AT DAARUT TAUHIID MOSQUE, BATAM – KEPULAUAN RIAU
Maccaferri Indonesia recommends the innovation of retaining wall structure using Paramesh Wall because of its ability on permeability, flexibility, duView
star
PARAMESH WALL OF TANA TORAJA AIRPORT
PARAMESH WALL OF TANA TORAJA AIRPORT
Different types of retaining structures have been considered during the design stages: traditional concrete walls, bored piles and hybrid MSE walls (PView
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has View
star
RANCAMAYA RETAINING WALL
RANCAMAYA RETAINING WALL
As landslide rehabilitation, Maccaferri provided a solution using a 7 m high Gabion made retaining wall. In addition, as scour protection of the GabioView
star
REINFORCED SOIL STRUCTURE NAGREG RING ROAD
REINFORCED SOIL STRUCTURE NAGREG RING ROAD
Maccaferri Terramesh System and Macgrid as a flexible structure can provide solution for the problems. Reinforced embankment structure is able to haveView
star
RETAINING WALL AT BATAM CHURCH REVITALIZATION
RETAINING WALL AT BATAM CHURCH REVITALIZATION
Terramesh System decided to build in the area affected by the landslide. The foundation uses Terramesh System with 2m depth, and the structure on the View
star
RETAINING WALL AT KUNINGAN DAM
RETAINING WALL AT KUNINGAN DAM
A combination of Terramesh System and geogrid combined with an additional structure of wrapped-around geogrid were built with 10.0m – 13.0m height. MaView
star
RETAINING WALL BONTANG CITY OFFICE
RETAINING WALL BONTANG CITY OFFICE
Maccaferri Terramesh System as a flexible structure can provide solution for the problem of unstable soil condition. It is a reinforced embankment strView
star
RETAINING WALL FOR LANDSLIDE MITIGATION, JAMBI
RETAINING WALL FOR LANDSLIDE MITIGATION, JAMBI
The Public Works Department decided to build a reinforced soil wall as retaining structure using Maccaferri Terramesh System modular and flexible elemView
star
RETAINING WALL REHABILITATION AT CEMETERY BOGOR
RETAINING WALL REHABILITATION AT CEMETERY BOGOR
Maccaferri proposed to use MSE Wall built behind the existing masonry wall. The MSE Wall consisted of Terrramesh and MacGrid WG20. In order to installView
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeView
star
RIVER BANK PROTECTION AT CITRAGRAN CIBUBUR
RIVER BANK PROTECTION AT CITRAGRAN CIBUBUR
Maccaferri as a slope protection specialist provided cost-effective, environmentally friendly, and tailored solutions for the client’s problems. UsiView
star
RIVER BANK PROTECTION GRESIK
RIVER BANK PROTECTION GRESIK
Maccaferri proposed a reliable solution using a revetment made from Reno Mattresses in order to provide protection against the erosion affecting the bView
star
RIVER REVETMENT IN WAY LIRANG
RIVER REVETMENT IN WAY LIRANG
The Public Works Department decided therefore to build the dike and to cover it with a durable and flexible revetment system to prevent the erosion ofView
star
RIVER REVETMENT WAY RUHU
RIVER REVETMENT WAY RUHU
The check dam is 3,5 m high and 35 m wide provided with a 15 m long stilling basin. The weir and the stilling basin are entirely built using flexible View
star
RIVER TRAINING WORK SENTUL NIRWANA
RIVER TRAINING WORK SENTUL NIRWANA
Combination of Maccaferri Gabion and Reno Mattress become a right choice to solve the problem on site. Gabion as counterweight structure able to maintView
star
ROCKFALL BARRIER AT MARTABE GOLD MINE, SOUTH TAPANULI
ROCKFALL BARRIER AT MARTABE GOLD MINE, SOUTH TAPANULI
The Rockfall Mitigation Barrier by Maccaferri is certified on “EOTA-EAD 340059-00-0106 – Falling Rock Protection Kits” according to the dynamic imView
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringView
star
ROCKFALL MITIGATION (NETTING) AT PRESERVASI JALAN AEGELA – BATAS K
ROCKFALL MITIGATION (NETTING) AT PRESERVASI JALAN AEGELA – BATAS K
Rockfall Netting – Secured Drapery System was applied by using a combination of Steelgrid HR30 as Netting Material and Rock Nailing with Length of 8View
star
ROCKFALL PROTECTION ALONG MAROS ELEVATED ROAD
ROCKFALL PROTECTION ALONG MAROS ELEVATED ROAD
Our engineers, together with the local Public Works technical department based in Makassar, designed the rockfall drapery system. The client wanted a View
star
ROCKFALL PROTECTION FOR NARINGGUL ACCESS ROAD WITH SIMPLE DRAPERY
ROCKFALL PROTECTION FOR NARINGGUL ACCESS ROAD WITH SIMPLE DRAPERY
The client required two types of steel mesh with a certain specification. The first one was a high strength wire mesh, Zn-Al coated with 150 kN/m tensView
star
ROCKFALL PROTECTION OF BTS. BANDUNG/CIANJUR-NARINGGUL-CIDAUN ROAD
ROCKFALL PROTECTION OF BTS. BANDUNG/CIANJUR-NARINGGUL-CIDAUN ROAD
To comply with the requirements of enduring the estimated falling rocks, Maccaferri Indonesia provided a rockfall barrier (RB 3000) to dissipate the eView
star
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thView
star
SAMPOERNA ACADEMY GREEN TERRAMESH
SAMPOERNA ACADEMY GREEN TERRAMESH
MSE Wall structure by Maccaferri consists of Green Terramesh and Macgrid WG 15 (Geogrid) as the main reinforcement. Green Terramesh, that is fabricateView
star
SEMARANG-DEMAK TIDAL FLOOD CONTROL PROJECT
As contractor, Nindya Karya – Mataram KSO has been instructed to install an embankment near Ahmad Yani Airport to control seawater from flowing througView
star
SENTANI NATIONAL ROAD ROCKFALL PROTECTION
SENTANI NATIONAL ROAD ROCKFALL PROTECTION
The solution chosen by the Ministry of Public Works was to substitute the expensive and rigid shotcrete protection with a more flexible and permeable View
star
SINDANGHEULA DAM
SINDANGHEULA DAM
An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cView
star
SLOPE PROTECTION JATIGEDE DAM PROJECT
SLOPE PROTECTION JATIGEDE DAM PROJECT
The problem was solved with the implementation of a combo between Maccaferri Terramesh® System and bore piles. The bore pile structure purpose is toView
star
SLOPE STABILIZATION AT MUARA LABOH GEOTHERMAL POWER PROJECT
To mitigate the slope surfaces and prevent the further possibility of landslides, several solutions are combined due to the height conditions of the sView
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designView
star
TANA TORAJA AIRPORT PARAMESH
TANA TORAJA AIRPORT PARAMESH
Maccaferri hybrid MSE structures (DT + Paralink) have been selected as the best solution. In October 2015, the construction of the first Paramesh re-tView
star
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tView
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaView
star
WAY ARA RIVER BANK PROTECTION
WAY ARA RIVER BANK PROTECTION
The Public Works Department decided therefore to build the dike and to cover it with a durable and flexible revetment system to prevent the erosion ofView
star
WAY LOLA BESAR RIVER BANK PROTECTION
WAY LOLA BESAR RIVER BANK PROTECTION
The Public Works Department decided therefore to build the dike and to cover it in with a durable and flexible revetment system to prevent the erosionView
star
WAY LOLA KECIL RIVER BANK PROTECTION
WAY LOLA KECIL RIVER BANK PROTECTION
The Public Works Department decided therefore to build the dike and to cover it in with a durable and flexible revetment system to prevent the erosionView
star
ΤΕΛΙΚΗ ΚΑΛΥΨΗ ΧΑΔΑ
ΤΕΛΙΚΗ ΚΑΛΥΨΗ ΧΑΔΑ
Ο γεωσυνθετικός φραγμός από μπετονίτη MACLINE GCL W21 τοποθετήθηκε στη τελική κάλυψη των ΧΑΔΑ για να σφραγίσει αποτελεσματικά την είσοδο ύδατος πουView
star

Haven’t found what you were looking for?

Filter by:
Advanced Search












Meet our Experts


We represent a winning partner for the complex world of civil and industrial constructions. Thanks to a wide range, our products are the answer to the various technical demands of the sector: from drainage and protection to water and waterproofing of structures and coverings, to energy-saving to housing comfort, from steam control to issues concerning.

This site is registered on wpml.org as a development site.