Facebook pixel

EROSION CONTROL AT GONDANG DAM

Home > Success stories > EROSION CONTROL AT GONDANG DAM

Slope Protection

2023

KARANGANYAR - CENTRAL JAVA - Indonesia

MINISTRY OF PUBLIC WORKS

EROSION CONTROL AT GONDANG DAM

Problem

The construction of the Gondang Dam resulted in exposed cut slopes. The cut slopes would be exposed to rain or surface flow causing the surface material to be dissipated by the water run-off leading to surface erosion. The slopes need to be protected to …

Solution

To mitigate the surface erosion of cut slopes, an Erosion Control System was chosen due to its easy application, permeable material, and competitive price. The material used for this solution is MacMat HS. This solution had been defined as Selimut Pengen…

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.