Second Stage MME at Puerto Escondido Airport

Jahr
2022
Standort
PUERTO ESCONDIDO - OAXACA - México
Kunde
SICT OAXACA
Planer
HUAROCSO SA DE CV

Herausforderung

The erosive action of the stream flowing parallel to kilometer 137 on the federal highway Pinotepa Nacional - Salina Cruz has caused the undermining of the embankment, risking its stability. Additionally, the urban expansion brings a larger surface covered with asphalt and concrete, which have a lower infiltration coefficient, resulting in increased hydraulic expenditure, especially during hydro-meteorological events that affect this coastal city.

Lösung

To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Paragrid 200 HF geogrids. Additionally, transverse deflector-type structures and two gabion weirs were included to control the slope of the channel. Also, an increased embedment depth was implemented for this wall, located in a high seismicity zone.

Laden Sie
die Erfolgsgeschichte

Second Stage MME at Puerto Escondido Airport

Herunterladen
Second Stage MME at Puerto Escondido Airport

Unsere Produkte für
diese Erfolgsgeschichte

Nehmen Sie Kontakt mit uns auf

Wenn Sie mit der Datenschutzerklärung des Unternehmens einverstanden sind und deren Inhalt verstanden haben, fragt Sie der Verantwortliche, ob Sie der Verarbeitung in der in der Datenschutzerklärung des Unternehmens vorgesehenen Weise zum Zweck der Zusendung von Werbemitteilungen über die vom Verantwortlichen angebotenen Dienstleistungen/Aktivitäten zustimmen. *

Darüber hinaus fragt Sie der Verantwortliche, ob Sie der Weitergabe Ihrer personenbezogenen Daten an die Maccaferri-Partnergesellschaften sowie der daraus möglicherweise resultierenden Übermittlung außerhalb der EU zustimmen, zu deren eigenen Zwecken, einschließlich Werbezwecken (Versand von Marketingmitteilungen) *