CONSTRUCTION OF ROAD NOS. 1 & 5 AND DRAINAGE SYSTEMS AT DUQM PORT

Jahr
2020
Standort
DUQM - AL WUSTA - Oman
Kunde
Special Economic Zone Authority, Duqm

Herausforderung

The Special Economic Zone Authority at Duqm (SEZAD) has commissioned Parsons International Company LLC (Parsons) for the "Design and Supervision of Road Nos. 1 and 5 and Drainage Systems, as part of the road infrastructure works in the SEZAD area. The proposed project intends to provide and improve access to the Duqm Port and the Liquid Jetty. The Liquid Jetty will serve the Duqm Refinery and several proposed heavy/ petrochemical industries in Duqm. The Duqm area is marked by the significant presence of 'soft clay / sabkha' soil, which drastically influences the construction of foundations for civil engineering structures in that area. From that scenario, a suitable ground improvement solution had to be adopted before the construction of the embankments of Road Nos 1 and 5. After making a critical techno-commercial review of the ground improvement options available in the Oman market, the solution of stone columns became preferential. Nevertheless, the potential cost involved in achieving stone columns below the road embankment of average width 75 m and length 8.5 km would be prohibitively expensive and significantly time-consuming

Lösung

Maccaferri Middle East (MME) was approached by the project stakeholders to propose a suitable alternate scheme of ground stabilization. After studying the geotechnical reports and history of ground failures in the project area, MME proposed a ground stabilization solution consisting of high strength ParaLink geogrids as basal reinforcements, underlain by a layer of thick boulder layer. The basal reinforcement design was done following the guidelines of the British Standard BS:8006-2010. ParaLink geogrid with a strength of up to 500 KN/m was required for the stabilization of the road embankments. The boulder layer was expected to function initially as a working platform. However, it also works to speed up the consolidation settlement and contributes to reducing differential settlements through a beam effect. While comparing with the cost of initially preferred stone columns approach, the cost of the ground improvement was decreased by 85%, by adopting the MME’s proposal. MME was involved in the design, supply, and site assistance of the

Laden Sie
die Erfolgsgeschichte

CONSTRUCTION OF ROAD NOS. 1 & 5 AND DRAINAGE SYSTEMS AT DUQM PORT

Herunterladen
CONSTRUCTION OF ROAD NOS. 1 & 5 AND DRAINAGE SYSTEMS AT DUQM PORT

Unsere Produkte für
diese Erfolgsgeschichte

Nehmen Sie Kontakt mit uns auf

Wenn Sie mit der Datenschutzerklärung des Unternehmens einverstanden sind und deren Inhalt verstanden haben, fragt Sie der Verantwortliche, ob Sie der Verarbeitung in der in der Datenschutzerklärung des Unternehmens vorgesehenen Weise zum Zweck der Zusendung von Werbemitteilungen über die vom Verantwortlichen angebotenen Dienstleistungen/Aktivitäten zustimmen. *

Darüber hinaus fragt Sie der Verantwortliche, ob Sie der Weitergabe Ihrer personenbezogenen Daten an die Maccaferri-Partnergesellschaften sowie der daraus möglicherweise resultierenden Übermittlung außerhalb der EU zustimmen, zu deren eigenen Zwecken, einschließlich Werbezwecken (Versand von Marketingmitteilungen) *