Second Stage MME at Puerto Escondido Airport

Viti
2022
Vendndodhja
PUERTO ESCONDIDO - OAXACA - México
Klienti
SICT OAXACA
Projektuesi
HUAROCSO SA DE CV

Sfida

The erosive action of the stream flowing parallel to kilometer 137 on the federal highway Pinotepa Nacional - Salina Cruz has caused the undermining of the embankment, risking its stability. Additionally, the urban expansion brings a larger surface covered with asphalt and concrete, which have a lower infiltration coefficient, resulting in increased hydraulic expenditure, especially during hydro-meteorological events that affect this coastal city.

Zgjidhja

To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Paragrid 200 HF geogrids. Additionally, transverse deflector-type structures and two gabion weirs were included to control the slope of the channel. Also, an increased embedment depth was implemented for this wall, located in a high seismicity zone.

Shkarkoni Histori Suksesi

Second Stage MME at Puerto Escondido Airport

Shkarko
Second Stage MME at Puerto Escondido Airport

Produktet tona për
këtë Histori Suksesi

Lidhuni me ne

Nëse jeni dakord me Politikën e Privatësisë të kompanisë dhe keni kuptuar përmbajtjen e saj, Kontrolluesi i të Dhënave ju pyet nëse jepni pëlqimin për përpunimin e të dhënave në mënyrën e parashikuar nga politika e privatësisë e kompanisë, për dërgimin e komunikimeve promovuese për shërbimet/aktivitetet e ofruara nga Kontrolluesi i të Dhënave. *

Për më tepër, Kontrolluesi i të Dhënave ju pyet nëse jepni pëlqimin për komunikimin e të dhënave tuaja personale te Filialet e Maccaferri, dhe transferimin e mundshëm jashtë BE-së që mund të rezultojë, për qëllimet e tyre, përfshirë ato të natyrës promovuese (dërgimi i komunikimeve të marketingut) *