Facebook pixel

Primary Lining

Home > Solutions > Primary Lining

Primary Lining

Image

Delivering stability and support


The primary lining phase delivers the stability of the tunnel structure providing immediate support to the excavated ground. This temporary supporting lining is commonly made of steel fiber reinforced shotcrete. When required, this phase also features the installation of reinforcement elements consisting of steel arched sections that have the shape of the tunnel contour.

Reducing costs and increasing productivity with the B.Zero TondoTM


Our patented B.Zero TondoTM Tunnel Support System is a new solution in tunnelling and provides extremely efficient first-stage support. B.Zero.TondoTM is unique tubular steel-arch ribs, filled with pumped concrete in-situ and offering greater structural efficiency than traditional steel-arch supports. Therefore fewer B.Zero TondoTM arches are needed, reducing costs and increasing tunnel productivity.


Related products

Drainage Geocomposites
These specialized product families highlight the versatility and adaptability of drainage composites, ensuring they meet the speci View
star
Multicomposite
Multicomposites are the latest and the most innovative development in the geosynthetics family. Drainage composite can, and not exclusively, be com View
star
Tunnelling – Valves
We offer a range of valves depending on the use within tunnelling operations. They are used for the pressure injection of chemical mixtures used in View
star
Tunnelling Reinforcement
GFRP Bar & StirrupsThe GFRP BAR and Stirrups are successfully used to replace the traditional reinforcement bar within concrete struct View
star
Tunnelling Steel Arch
B.Zero Tondo(TM) Steel ArchOur patented B.Zero Tondo(TM) Tunnel Support System is a new solution in Tunnelling and provides ext View
star