Facebook pixel

Ιστορίες Επιτυχίας

Ιστορίες Επιτυχίας

44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massΔείτε
star
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,Δείτε
star
A2 / A282 JUNCTION IMPROVEMENTS
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecΔείτε
star
AGRIPORT, MAYDON WHARF
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Δείτε
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MΔείτε
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Δείτε
star
ASTON HOTEL ANYER BREAKWATER STRUCTURE
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tΔείτε
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosΔείτε
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErΔείτε
star
AZUDES SITIO RAMSAR RÍO DESAGUADERO
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxΔείτε
star
B19 – BLAICHACH BURGBERG
B19 – BLAICHACH BURGBERG
The GTM units met the requirements of the tight construction schedule due to its fast and undelayed construction process, even during the wintertime. Δείτε
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsΔείτε
star
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Δείτε
star
BE-ANTWERP MALINAS
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Δείτε
star
BE-MECHELEN R6
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tΔείτε
star
BEAVERNETTING EVERTSOORD
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bΔείτε
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trΔείτε
star
BOB 230KV SWITCHYARD
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aΔείτε
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that Δείτε
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to Δείτε
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshΔείτε
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshΔείτε
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenΔείτε
star
BRUG VAN DEN AZIJN
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concreteΔείτε
star
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinΔείτε
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisΔείτε
star
CATO MANOR PIPELINE & ROAD PROTECTION
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiΔείτε
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal Δείτε
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightΔείτε
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basΔείτε
star
DE-FERCH
DE-FERCH
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaverΔείτε
star
DE-WIEBELSKIRCHEN
DE-WIEBELSKIRCHEN
The external face, reinforcing panel and top return are a continuous woven mesh unit. Attached to the inside facing is a woven polyester mesh fabric tΔείτε
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonΔείτε
star
DEBRIS FLOW PROTECTION LERINI STREAM
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeΔείτε
star
Drainage of structures
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Δείτε
star
ERDOX ZERMATT
ERDOX ZERMATT
Die Gornergrat Bahn hat verschiedene Systeme miteinander verglichen und sich für das wirtschaftlichste System, das ErdoX System von Maccaferri entschΔείτε
star
ERLANGEN A73
ERLANGEN A73
Maccaferri through his local partner BECO Bermüller proposed a reinforced soil structure made by modular elements of Green Terramesh 70°. The typicaΔείτε
star
EROSION CONTROL AGAINST MAMMAL BURROWING
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Δείτε
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeΔείτε
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system creΔείτε
star
FV17 LIAFJELLET-OLVIKVATNET
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theΔείτε
star
Gabion Defense – Cajuca East Corridor
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineΔείτε
star
HASANKEYF ARCHEOPARK PROJECT
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysΔείτε
star
HELBOR BROOKLIN
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdΔείτε
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Δείτε
star
HENNEAULAAN ZAVENTEM
HENNEAULAAN ZAVENTEM
Maccaferri´s Corporate Technical Department, in cooperation with the local partner TEXION, has proposed an optimised solution with has supported the Δείτε
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useΔείτε
star
IPO DAM SILT CURTAINS
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beΔείτε
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawΔείτε
star
KLOSTER LEHNIN
KLOSTER LEHNIN
The IDAS Planungsgesellschaft chose to use the Maccaferri Road Mesh to be installed under the new roadway. T The strength and flexibility of the Road Δείτε
star
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyΔείτε
star
LÄRCHBERG, LOFER
LÄRCHBERG, LOFER
Die WLV hat vorab eine Gefahrenbeurteilung mit Steinschlagsimulationen erarbeitet. Danach wurde das Projekt im Detail geplant und die MateriallieferunΔείτε
star
LINCOLNSHIRE EFW
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of  ground level wet and dry holding lagoons. These were   impermeably lineΔείτε
star
LISTENING MIRRORS HISTORIC SITE
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Δείτε
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeΔείτε
star
Lower Campbell Repair
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iΔείτε
star
LUOYANG FOUR RIVER TONGZHI PROJECT
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipΔείτε
star
LV STGEGIA
LV STGEGIA
The client (road authority) decided to use the most economical and effective system, the Maccaferri snow nets. It was a great challenge to install theΔείτε
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallΔείτε
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesΔείτε
star
Mass Gravity Retaining Walls
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Δείτε
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesΔείτε
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retΔείτε
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thΔείτε
star
NEW ASDA STORE
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Δείτε
star
NEWHURST ENERGY FROM WASTE FACILITY
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to  impermeably line the attenuation pond and this was   accepted by client HitΔείτε
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a Δείτε
star
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoΔείτε
star
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshΔείτε
star
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Δείτε
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiΔείτε
star
PRESA FRANCISCO ABELLÁN
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofΔείτε
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rΔείτε
star
PROTEÇÃO COSTEIRA COM GABIÕES
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Δείτε
star
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aΔείτε
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netΔείτε
star
REDROW HOMES DEVELOPMENT
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiΔείτε
star
Rehabilitation due to Undermining in Villalobos
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizΔείτε
star
Reinforced Soil Retaining Structure and Slope Reinforcement
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininΔείτε
star
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Δείτε
star
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in  the Windsor area, was tasked by the Town of Amherstburg   to devise aΔείτε
star
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofΔείτε
star
RETAINING WALL SUPPORTING A630
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was  originally proposed within the design. However, the PVC   coating on weldedΔείτε
star
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyΔείτε
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Δείτε
star
ROCK SUPPORT IN VÍCAR, ALMERÍA
ROCK SUPPORT IN VÍCAR, ALMERÍA
To address this problem, the following support measures were implemented:LEA 300-8 cable net with a tensile strength of 130 kN/m and a puncture resistΔείτε
star
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RΔείτε
star
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mΔείτε
star
SAAS BALEN
SAAS BALEN
Maccaferri proposed using the greenable, environmentally friendly, modular Green Terramesh earth reinforcement system. Green Terramesh consists of preΔείτε
star
SADAWARNA DAM PARAMESH WALL
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshΔείτε
star
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Δείτε
star
SEATION TRAMWAY
SEATION TRAMWAY
The site is situated above an area of soft soil that required  substantial ground improvement.The new platform area   adjacent to Δείτε
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Δείτε
star
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VΔείτε
star
SLOPE STABILISATION PORT OF ZIERBENA
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryΔείτε
star
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeΔείτε
star
Small green lung in the Metelliana Valley
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoΔείτε
star
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fΔείτε
star
St Andrews Royal & Ancient Golf Club
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byΔείτε
star
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaΔείτε
star
SUNSET CLIFF
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersΔείτε
star
TERRAMESH RD PATRIMONIAL
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Δείτε
star
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengΔείτε
star
The Ash Yard of the Thermal Power Plant
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionΔείτε
star
THE GRAND BOHEMIAN HOTEL
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prΔείτε
star
THE NEW ROUTE DU LITTORAL
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Δείτε
star
THREE CITIES TRAIL
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and  implemented a tie-back reinforced gabion retaining wall to   act as the slΔείτε
star
TK 2018 – 006 – MRV
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxΔείτε
star
VIERSEN FRITZBRUCH
VIERSEN FRITZBRUCH
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Δείτε
star
Village Brow, Crawfordsburn
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingΔείτε
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comΔείτε
star
WALTHAM HIGH SCHOOL
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mΔείτε
star
WASSERBURG – NOISE BARRIER
WASSERBURG – NOISE BARRIER
Maccaferri through his local partner BECO Bermüller proposed a noise barrier made of the modular elements Green Terramesh Duo. Different sectors had Δείτε
star
Α/Δ ΠΑΘΕ-ΥΠΟΛ.ΕΡΓΑΣΙΕΣ ΤΜ.ΣΚΑΡΦΕΙΑ-ΛΑΜΙΑ-ΡΑΧΕΣ
Α/Δ ΠΑΘΕ-ΥΠΟΛ.ΕΡΓΑΣΙΕΣ ΤΜ.ΣΚΑΡΦΕΙΑ-ΛΑΜΙΑ-ΡΑΧΕΣ
As solution to this problem Maccaferri’s product RoadΜesh® L was applied. It is very important to rehabilitate and reinforce the pavement of the hΔείτε
star
ΑΘΗΝΑ  – ΜΑΡΙΝΑ ΦΛΟΙΣΒΟΥ  – Ελλάδα
ΑΘΗΝΑ – ΜΑΡΙΝΑ ΦΛΟΙΣΒΟΥ – Ελλάδα
Για τη λύση του προβλήματος της υποσκαφής του θαλασσίου πυθμένα επιλέχθηκε η λύσηΔείτε
star
ΑΝΤΙΠΛΗΜΜΥΡΙΚΗ ΠΡΟΣΤΑΣΙΑ ΠΕΡΙΟΧΗΣ Ν.ΕΦΕΣΣΟΥ
ΑΝΤΙΠΛΗΜΜΥΡΙΚΗ ΠΡΟΣΤΑΣΙΑ ΠΕΡΙΟΧΗΣ Ν.ΕΦΕΣΣΟΥ
Τα μέτρα προστασίας για των υποδομών από πλημμύρες περιλάμβαναν τη διεθέτηση τωνΔείτε
star
ΑΠΟΚΑΤΑΣΤΑΣΗ ΑΣΦΑΛΤΙΚΟΥ ΟΔΟΣΤΡΩΜΑΤΟΣ ΚΑΙ ΤΕΧΝΙΚΩΝ ΕΡΓΩΝ ΣΗΜΑΝΣΗΣ Σ
ΑΠΟΚΑΤΑΣΤΑΣΗ ΑΣΦΑΛΤΙΚΟΥ ΟΔΟΣΤΡΩΜΑΤΟΣ ΚΑΙ ΤΕΧΝΙΚΩΝ ΕΡΓΩΝ ΣΗΜΑΝΣΗΣ Σ
Η λύση του ελεύθερου πλέγματος προτιμήθηκε για λόγους σχέσης κόστους – αποτελεσμΔείτε
star
ΑΠΟΚΑΤΑΣΤΑΣΗ ΑΣΦΑΛΤΙΚΟΥ ΟΔΟΣΤΡΩΜΑΤΟΣ ΣΤΗΝ ΠΕ ΚΟΖΑΝΗΣ
ΑΠΟΚΑΤΑΣΤΑΣΗ ΑΣΦΑΛΤΙΚΟΥ ΟΔΟΣΤΡΩΜΑΤΟΣ ΣΤΗΝ ΠΕ ΚΟΖΑΝΗΣ
Ως λύση στο πρόβλημα αυτό, εφαρμόστηκε το προϊόν της Maccaferri Roadmesh®. Η αποκατάσταση κΔείτε
star
ΑΠΟΚΑΤΆΣΤΑΣΗ ΚΑΤΟΛΊΣΘΗΣΗΣ THΣ ΟΔΟΥ ΔΙΑΚΟΠΤΟΥ ΚΑΛΑΒΡΥΤΩΝ
ΑΠΟΚΑΤΆΣΤΑΣΗ ΚΑΤΟΛΊΣΘΗΣΗΣ THΣ ΟΔΟΥ ΔΙΑΚΟΠΤΟΥ ΚΑΛΑΒΡΥΤΩΝ
Η μελέτη προέβλεπε την τοποθέτηση Φράχτη Ανάσχεσης βραχοπτώσεων με ικανότητα αποΔείτε
star
ΑΠΟΚΑΤΑΣΤΑΣΗ ΟΔΟΠΟΙΙΑΣ ΣΤΗΝ ΑΓΙΑ ΜΑΡΙΝΑ ΧΑΝΙΩΝ
ΑΠΟΚΑΤΑΣΤΑΣΗ ΟΔΟΠΟΙΙΑΣ ΣΤΗΝ ΑΓΙΑ ΜΑΡΙΝΑ ΧΑΝΙΩΝ
Καθώς στα πρανή το πρόβλημα ήταν ο έλεγχος της επιφανειακής διάβρωσης αλλά και η εΔείτε
star
ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΡΕΜΑΤΟΣ ΛΟΥΤΡΑΚΙΟΥ
ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΡΕΜΑΤΟΣ ΛΟΥΤΡΑΚΙΟΥ
Η τεχνική πρόταση της Maccaferri Hellas ήταν η χρήση 3-d γεωπλεγμάτων για την επένδυση των πΔείτε
star
ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΣΕ ΤΜΗΜΑΤΑ ΤΗΣ ΕΟ ΘΕΣΣΑΛΟΝΙΚΗΣ ΜΟΥΔΑNIΩΝ
ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΣΕ ΤΜΗΜΑΤΑ ΤΗΣ ΕΟ ΘΕΣΣΑΛΟΝΙΚΗΣ ΜΟΥΔΑNIΩΝ
Για την αντιστήριξη του αρχικού πρανούς θα κατασκευαστεί τοίχος με συρματοκιβώτΔείτε
star
ΑΠΟΚΑΤΑΣΤΑΣΗ ΤΟΥ ΕΘ. ΟΔ. ΔΙΚΤΥΟΥ ΣΤΟΥΣ ΔΕΛΦΟΥΣ
ΑΠΟΚΑΤΑΣΤΑΣΗ ΤΟΥ ΕΘ. ΟΔ. ΔΙΚΤΥΟΥ ΣΤΟΥΣ ΔΕΛΦΟΥΣ
As solution to this problem Maccaferri’s product Roadmesh was applied. It is very important to rehabilitate and reinforce the pavement of the highwaΔείτε
star
ΑΠΟΚΑΤΑΣΤΑΣΗ ΧΑΔΑ ΩΡΩΠΟΥ
ΑΠΟΚΑΤΑΣΤΑΣΗ ΧΑΔΑ ΩΡΩΠΟΥ
Το τρισδιάστατο γεώπλεγμα MACGRID T 55 τοποθετήθηκε σαν κάλυμμα του κυττάρου με σκοπόΔείτε
star
ΒΕΛΤΙΩΣΗ ΠΡΑΝΩΝ ΚΟΡΙΝΘΟΥ – ΤΡΙΠΟΛΗΣ
ΒΕΛΤΙΩΣΗ ΠΡΑΝΩΝ ΚΟΡΙΝΘΟΥ – ΤΡΙΠΟΛΗΣ
Καθώς στα πρανή το πρόβλημα ήταν ο έλεγχος της επιφανειακής διάβρωσης αλλά και η εΔείτε
star
Ε.Ο ΑΓΡΙΝΙΟΥ ΚΑΡΠΕΝΗΣΙΟΥ  
Ε.Ο ΑΓΡΙΝΙΟΥ ΚΑΡΠΕΝΗΣΙΟΥ  
Ως λύση στο πρόβλημα αυτό, εφαρμόστηκε το πολυεστερικό γεώπλεγμα τύπου Macgrid WG 4 τηςΔείτε
star
Ε.Ο.ΠΑΤΡΑ-ΤΡΙΠΟΛΗ-ΠΑΡ.ΤΜ.ΦΡΑΓΜΑΤΟΣ ΠΕΙΡΟΥ ΠΑΡΑΠΕΙΡΟΥ
Ε.Ο.ΠΑΤΡΑ-ΤΡΙΠΟΛΗ-ΠΑΡ.ΤΜ.ΦΡΑΓΜΑΤΟΣ ΠΕΙΡΟΥ ΠΑΡΑΠΕΙΡΟΥ
Η εταιρεία μας πρότεινε τη κατασκευή του οπλισμένου επιχώματος με το σύστημα PARAMESΔείτε
star
ΕΓΝΑΤΙΑ ΟΔΟΣ  / ΤΜΗΜΑ ΑΝΘΟΧΩΡΙ – ΜΕΤΣΟΒΟ
ΕΓΝΑΤΙΑ ΟΔΟΣ  / ΤΜΗΜΑ ΑΝΘΟΧΩΡΙ – ΜΕΤΣΟΒΟ
Η Maccaferri Hellas συνεργάστηκε με τον ανάδοχο του έργου προσφέροντας τεχνικές λύσεις μΔείτε
star
ΕΝΙΧΥΣΗ ΕΔΑΦΟΥΣ ΣΕ ΙΔΙΩΤΙΚΟ ΕΡΓΟ
ΕΝΙΧΥΣΗ ΕΔΑΦΟΥΣ ΣΕ ΙΔΙΩΤΙΚΟ ΕΡΓΟ
Ως λύση στο πρόβλημα αυτό, εφαρμόστηκε το πολυεστερικά γεώπλεγμα τύπου Macgrid WG. Πιο Δείτε
star
ΕΠΕΝΔΥΣΗ ΠΡΑΝΟΥΣ ΓΗΠΕΔΟ ΚΑΛΛΙΘΕΑΣ
ΕΠΕΝΔΥΣΗ ΠΡΑΝΟΥΣ ΓΗΠΕΔΟ ΚΑΛΛΙΘΕΑΣ
Στη συγκεκριμένη εφαρμογή ήταν απαραίτητη η φιλική προς το περιβάλλον αντιμετώπιΔείτε
star
ΕΡΓΑΣΙΕΣ ΕΠΑΡΧΙΑΚΗΣ ΟΔΟΥ ΕΛΛΗΝΙΚΟ – ΚΑΛΕΤΖΙ
ΕΡΓΑΣΙΕΣ ΕΠΑΡΧΙΑΚΗΣ ΟΔΟΥ ΕΛΛΗΝΙΚΟ – ΚΑΛΕΤΖΙ
H χρήση του ελεύθερου πλέγματος SteelGrid MO – 300, αγκυρωμένο στην στέψη και τον πόδα τουΔείτε
star
ΕΡΓΑΣΙΕΣ ΠΡΟΣΤΑΣΙΑΣ ΠΡΑΝΩΝ  ΣΠΗΛΑΙΟΥ ΚΟΥΤΟΥΚΙ
ΕΡΓΑΣΙΕΣ ΠΡΟΣΤΑΣΙΑΣ ΠΡΑΝΩΝ  ΣΠΗΛΑΙΟΥ ΚΟΥΤΟΥΚΙ
Η τεχνική πρόταση της Maccaferri Hellas ήταν η χρήση πλήρως αγκυρούμενου πλέγματος προσταΔείτε
star
ΙΟΝΙΑ ΟΔΟΣ
ΙΟΝΙΑ ΟΔΟΣ
Βάση των τεχνικών προδιαγραφών της κατασκευάστριας εταιρείας χρησιμοποιήθηκαν 3Δείτε
star
ΚΑΝΑΛΙ ΛΟΥΤΡΑΚΙΟΥ
ΚΑΝΑΛΙ ΛΟΥΤΡΑΚΙΟΥ
Οι υπεύθυνοι μηχανικοί σε συνεργασία με τη Maccaferri , έκριναν ως την καλύτερη και πιο Δείτε
star
ΚΑΤΑΣΚ.ΟΠΛ.ΕΠΙΧΩΜΑΤΟΣ ΓΙΑ ΥΠΟΣΤΗΡΙΞΗ ΝΕΟΥ Α/Δ Α2
ΚΑΤΑΣΚ.ΟΠΛ.ΕΠΙΧΩΜΑΤΟΣ ΓΙΑ ΥΠΟΣΤΗΡΙΞΗ ΝΕΟΥ Α/Δ Α2
Οι μηχανικοί μας υποστήριξαν τη μελετητική ομάδα των μηχανικών όσον αφορά την εφαΔείτε
star
ΚΑΤΑΣΚΕΥΗ Α/Δ ΟΛΥΜΠΙΑ ΟΔΟΣ
ΚΑΤΑΣΚΕΥΗ Α/Δ ΟΛΥΜΠΙΑ ΟΔΟΣ
Η λύση του συστήματος με Green Terramesh προτιμήθηκε για λόγους σχέσης κόστους – αποτελεΔείτε
star
ΚΑΤΑΣΚΕΥΗ Α/Δ ΟΛΥΜΠΙΑ ΟΔΟΣ-Ελλάδα
ΚΑΤΑΣΚΕΥΗ Α/Δ ΟΛΥΜΠΙΑ ΟΔΟΣ-Ελλάδα
Η Maccaferri Hellas συνεργάστηκε με τους μελετητές κατά τη φάση του σχεδιασμού καθώς και μΔείτε
star
ΚΑΤΑΣΚΕΥΗ ΤΟΙΧΙΟΥ ΑΝΤΙΣΤΗΡΙΞΗΣ ΣΤΟ Δ.Δ ΜΕΝΔΕΝΙΤΣΑΣ
ΚΑΤΑΣΚΕΥΗ ΤΟΙΧΙΟΥ ΑΝΤΙΣΤΗΡΙΞΗΣ ΣΤΟ Δ.Δ ΜΕΝΔΕΝΙΤΣΑΣ
Η μελέτη προέβλεπε την κατασκευή ενός οπλισμένου τοιχίου στον πόδα του πρανούς καΔείτε
star
ΜΕΤΑΛΛΕΙΟ ΣΤΗΝ ΒΟΡΕΙΑ ΕΛΛΑΔΑ
ΜΕΤΑΛΛΕΙΟ ΣΤΗΝ ΒΟΡΕΙΑ ΕΛΛΑΔΑ
Η λύση του ελεύθερου πλέγματος Steelgrid MO-300, προτιμήθηκε για λόγους σχέσης κόστους –Δείτε
star
ΜΕΤΡΑ ΠΡΟΣΤΑΣΙΑΣ-ΑΡΣΗ ΚΑΤΑΠΤΩΣΕΩΝ ΠΡΑΝΩΝ ΝΟΜΟΥ ΑΡΓΟΛΙΔΑΣ
ΜΕΤΡΑ ΠΡΟΣΤΑΣΙΑΣ-ΑΡΣΗ ΚΑΤΑΠΤΩΣΕΩΝ ΠΡΑΝΩΝ ΝΟΜΟΥ ΑΡΓΟΛΙΔΑΣ
Οι παράγοντες οι οποίοι μπορούν να επηρεάσουν την επιλογή των κατάλληλων παρεμβάΔείτε
star
ΟΔΟΠΟΙΙΑ ΣΧΗΜΑΤΑΡΙ ΧΑΛΚΙΔΑ
ΟΔΟΠΟΙΙΑ ΣΧΗΜΑΤΑΡΙ ΧΑΛΚΙΔΑ
Η μελέτη προέβλεπε σαν προσωρινό μέτρο την τοποθέτηση Φράχτη Ανάσχεσης βραχοπτώσΔείτε
star
ΟΛΟΚΛΗΡΩΣΗ ΚΑΤΑΣΚΕΥΗΣ ΤΗΣ ΟΔΟΥ ΑΓ. ΒΑΡΒΑΡΑ – ΑΠΟΜΑΡΜΑ
ΟΛΟΚΛΗΡΩΣΗ ΚΑΤΑΣΚΕΥΗΣ ΤΗΣ ΟΔΟΥ ΑΓ. ΒΑΡΒΑΡΑ – ΑΠΟΜΑΡΜΑ
Επιλέχθηκε ένας συνδυασμός υλικών για το καλύτερο δυνατόν αποτέλεσμα. Η MACCAFERRI HELLASΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΑΓΩΓΟΥ-ΑΝΤΙΣΤΗΡΙΞΗ ΠΡΑΝΟΥΣ
ΠΡΟΣΤΑΣΙΑ ΑΓΩΓΟΥ-ΑΝΤΙΣΤΗΡΙΞΗ ΠΡΑΝΟΥΣ
Οι υπεύθυνοι μηχανικοί σε συνεργασία με τη Maccaferri Hellas, έκριναν ως την καλύτερη καιΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΑΠΟ ΒΡΑΧΟΠΤΩΣΕΙΣ ΤΕΛΕΦΕΡΙΚ—ΛΙΜΕΝΑΣ ΑΘΗΝΙΟΥ , ΣΑΝΤΟΡΙΝΗ,
ΠΡΟΣΤΑΣΙΑ ΑΠΟ ΒΡΑΧΟΠΤΩΣΕΙΣ ΤΕΛΕΦΕΡΙΚ—ΛΙΜΕΝΑΣ ΑΘΗΝΙΟΥ , ΣΑΝΤΟΡΙΝΗ,
Μια αρχική προμελέτη είχε γίνει η οποία προέβλεπε Φράχτες Ανάσχεσης βραχοπτώσεωνΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΒΑΘΡΩΝ ΓΕΦΥΡΑΣ ΣΤΗΝ ΕΓΝΑΤΙΑ ΟΔΟ
ΠΡΟΣΤΑΣΙΑ ΒΑΘΡΩΝ ΓΕΦΥΡΑΣ ΣΤΗΝ ΕΓΝΑΤΙΑ ΟΔΟ
Η ταχύτερη αλλά και η καλύτερη οικονομοτεχνικά λύση ήταν η επένδυση όλων των βάθρΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΒΡΑΧΟΠΤΩΣΕΩΝ ΛΙΜΝΟΔΕΞΑΜΕΝΗΣ ΞΗΡΟΠΟΤΑΜΟΥ ΣΤΗΝ ΣΑΜΟΘΡΑΚΗΣ
ΠΡΟΣΤΑΣΙΑ ΒΡΑΧΟΠΤΩΣΕΩΝ ΛΙΜΝΟΔΕΞΑΜΕΝΗΣ ΞΗΡΟΠΟΤΑΜΟΥ ΣΤΗΝ ΣΑΜΟΘΡΑΚΗΣ
Καθώς τα επικίνδυνα βραχοτεμάχια ήταν ιδιαίτερα ογκώδη, επιλέχθηκε η λύση του πλήΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΕΠΙΣΚΕΠΤΩΝ ΣΤΟ NOTIO ΤΕΙΧΟΣ ΑΚΡΟΠΟΛΗΣ
ΠΡΟΣΤΑΣΙΑ ΕΠΙΣΚΕΠΤΩΝ ΣΤΟ NOTIO ΤΕΙΧΟΣ ΑΚΡΟΠΟΛΗΣ
Η Maccaferri Hellas συνεργάστηκε με την αρμόδια υπηρεσία του Υπουργείου Πολιτισμού και μεΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΚΑΝΑΛΙΟΥ ΜΟΡΝΟΥ – ΔΙΩΡΥΓΑ ΤΑΞΙΑΡΧΩΝ
ΠΡΟΣΤΑΣΙΑ ΚΑΝΑΛΙΟΥ ΜΟΡΝΟΥ – ΔΙΩΡΥΓΑ ΤΑΞΙΑΡΧΩΝ
Η Maccaferri πρότεινε στον εργολάβο την τοποθέτηση ενός φράκτη ανάσχεσης βραχοπτώσεωνΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΚΑΤΟΙΚΙΩΝ ΑΠΟ ΒΡΑΧΟΠΤΩΣΕΙΣ  
ΠΡΟΣΤΑΣΙΑ ΚΑΤΟΙΚΙΩΝ ΑΠΟ ΒΡΑΧΟΠΤΩΣΕΙΣ  
H αρχική μελέτη είχε πραγματοποιηθεί και προέβλεπε τοποθέτηση Φράχτη ΑνάσχεσηςΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΟΙΚΙΣΜΟΥ Δ.Δ. ΝΕΑΠΟΛΗ (ΛΑΚΩΝΙΑΣ) ΑΠΟ ΚΑΤΟΛΙΣΘΗΣΕΙΣ
ΠΡΟΣΤΑΣΙΑ ΟΙΚΙΣΜΟΥ Δ.Δ. ΝΕΑΠΟΛΗ (ΛΑΚΩΝΙΑΣ) ΑΠΟ ΚΑΤΟΛΙΣΘΗΣΕΙΣ
Η Maccaferri Hellas συνεργάστηκε με τον ανάδοχο του έργου προσφέροντας εκτός από προϊόνταΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ ΕΡΓΟΣΤΑΣΙΟΥ ΗΛΕΚΤΡΙΚΗΣ ΕΝΕΡΓΕΙΑΣ
ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ ΕΡΓΟΣΤΑΣΙΟΥ ΗΛΕΚΤΡΙΚΗΣ ΕΝΕΡΓΕΙΑΣ
Η τεχνική πρόταση της Maccaferri Hellas ήταν η χρήση τρισδιάστατων γεωπλεγμάτων για την εΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ ΝΟΤΙΑ ΠΑΡΑΚΑΜΨΗ ΕΔΕΣΣΑΣ
ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ ΝΟΤΙΑ ΠΑΡΑΚΑΜΨΗ ΕΔΕΣΣΑΣ
Πολλοί είναι οι παράγοντες που μπορούν να επηρεάσουν την επιλογή των κατάλληλων πΔείτε
star
ΠΡΟΣΤΑΣΙΑ ΣΗΡΑΓΓΑΣ ΓΚΡΟΠΑΣ
ΠΡΟΣΤΑΣΙΑ ΣΗΡΑΓΓΑΣ ΓΚΡΟΠΑΣ
Στα πρανή το πρόβλημα ήταν ο έλεγχος της επιφανειακής διάβρωσης αλλά και η ενίσχυΔείτε
star
ΣΤΑΘΕΡΟΠΟΙΗΣΗ& ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΣΤΟΝ ΟΙΚΙΣΜΟ ΗΡΕΜΟ ΚΥΜΑ ΜΕΓΑΡΩΝ
ΣΤΑΘΕΡΟΠΟΙΗΣΗ& ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΣΤΟΝ ΟΙΚΙΣΜΟ ΗΡΕΜΟ ΚΥΜΑ ΜΕΓΑΡΩΝ
Επιλέχθηκε η λύση του πλήρως αγκυρούμενου πλέγματος και συγκεκριμένα το STEELGRID ΒO30Δείτε
star
ΣΤΑΘΜΟΣ ΣΤΑΘΕΥΣΗΣ ΕΓΝΑΤΙΑΣ ΟΔΟΥ
ΣΤΑΘΜΟΣ ΣΤΑΘΕΥΣΗΣ ΕΓΝΑΤΙΑΣ ΟΔΟΥ
Maccaferri Hellas has provided local authorities and the contractor with all available data on the geogrids in order to support them during the designΔείτε
star
ΤΕΛΙΚΗ ΚΑΛΥΨΗ ΧΑΔΑ
ΤΕΛΙΚΗ ΚΑΛΥΨΗ ΧΑΔΑ
Ο γεωσυνθετικός φραγμός από μπετονίτη MACLINE GCL W21 τοποθετήθηκε στη τελική κάλυψη τωΔείτε
star
ΤΕΧΝ.ΕΡΓΑ ΑΝΑΣΧΕΣΗΣ ΒΡΑΧΟΠΤΩΣΕΩΝ ΠΡΑΝΟΥΣ, 5Η Ε.Ο. ΠΑΡΓΑ-ΑΝΘΟΥΣΑ
ΤΕΧΝ.ΕΡΓΑ ΑΝΑΣΧΕΣΗΣ ΒΡΑΧΟΠΤΩΣΕΩΝ ΠΡΑΝΟΥΣ, 5Η Ε.Ο. ΠΑΡΓΑ-ΑΝΘΟΥΣΑ
Επιλέχθηκε η λύση του πλήρως αγκυρούμενου πλέγματος και συγκεκριμένα το STEELGRID ΒO30Δείτε
star
ΥΔΡΑΥΛΙΚΑ ΕΡΓΑ – ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ-ΑΓΩΓΟΥ
ΥΔΡΑΥΛΙΚΑ ΕΡΓΑ – ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ-ΑΓΩΓΟΥ
Οι μηχανικοί του έργου, με την υποστήριξη της εταιρείας μας, θεώρησαν ως καλύτερη Δείτε
star
ΥΔΡΕΥΣΗ ΗΡΑΚΛΕΙΟΥ ΚΑΙ ΑΓΙΟΥ ΝΙΚΟΛΑΟΥ ΑΠΟ ΤΟ ΦΡΑΓΜΑ ΑΠΟΣΕΛΕΜΗ
ΥΔΡΕΥΣΗ ΗΡΑΚΛΕΙΟΥ ΚΑΙ ΑΓΙΟΥ ΝΙΚΟΛΑΟΥ ΑΠΟ ΤΟ ΦΡΑΓΜΑ ΑΠΟΣΕΛΕΜΗ
Τα υδραυλικά έργα περιελάμβαναν την χρήση προκατασκευασμένων συρματοκιβωτιών καΔείτε
star
ΦΡΑΓΜΑ ΜΑΥΡΟΜΑΤΙ, ΟΛΟΚΛΗΡΩΣΗ ΚΑΤΑΣΚΕΥΗΣ ΦΡ. ΝΕΡΟΥ
ΦΡΑΓΜΑ ΜΑΥΡΟΜΑΤΙ, ΟΛΟΚΛΗΡΩΣΗ ΚΑΤΑΣΚΕΥΗΣ ΦΡ. ΝΕΡΟΥ
Οι παράγοντες οι οποίοι μπορούν να επηρεάσουν την επιλογή των κατάλληλων παρεμβάΔείτε
star
ΧΩΡΟΙ ΑΝΕΞΕΛΕΓΚΤΗΣ ΔΙΑΘΕΣΗΣ ΑΠΟΡΡΙΜΜΑΤΩΝ  
ΧΩΡΟΙ ΑΝΕΞΕΛΕΓΚΤΗΣ ΔΙΑΘΕΣΗΣ ΑΠΟΡΡΙΜΜΑΤΩΝ  
Maccaferri’s geosynthetics were applied in 3 different areas of the Municipality according to the project’s design. Geomembrane and drainage compoΔείτε
star

Δεν βρήκατε αυτό που αναζητούσατε?

Filter by:
Προχωρημένη Αναζήτηση












Γνωρίστε τους ειδικούς μας

Εκπροσωπούμε ένα νικητήριο συνεργάτη για τον πολύπλοκο κόσμο των πολιτικών και βιομηχανικών κατασκευών. Χάρη σε μια ευρεία γκάμα προϊόντων μας, απαντούμε στις διάφορες τεχνικές απαιτήσεις του τομέα: από την αποστράγγιση και προστασία έως το νερό και την υδατοστεγανοποίηση των δομών και επικαλύψεων, την εξοικονόμηση ενέργειας έως την άνεση της κατοικίας, από τον έλεγχο του ατμού έως τα ζητήματα που σχετίζονται με αυτό.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.