Ιστορίες Επιτυχίας
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was considered sufficient to construct a stepped retaining wall from massΔείτεstar
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion apron (0.5m thick). The volume of protection was approximately 13,Δείτεstar
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecΔείτεstar
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Δείτεstar
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and proposed the MacWall Landmark segmental reinforced soil wall system. MΔείτεstar
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Δείτεstar
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tΔείτεstar
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosΔείτεstar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErΔείτεstar
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxΔείτεstar
B19 – BLAICHACH BURGBERG
The GTM units met the requirements of the tight construction schedule due to its fast and undelayed construction process, even during the wintertime. Δείτεstar
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsΔείτεstar
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Δείτεstar
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Δείτεstar
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tΔείτεstar
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bΔείτεstar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trΔείτεstar
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aΔείτεstar
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up with a suitable solution for the posed site problems. It was agreed that Δείτεstar
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings extensively along the 35-mile route which connects Edinburgh to Δείτεstar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshΔείτεstar
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenΔείτεstar
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concreteΔείτεstar
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinΔείτεstar
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisΔείτεstar
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiΔείτεstar
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assembleΔείτεstar
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lΔείτεstar
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6 feet tall. The proposed channel sidewalls will be stabilized with gabiΔείτεstar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Δείτεstar
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by 79 new spaces, to the west of the petrol filling station. The proposal Δείτεstar
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically stabilised earth walls into the pile foundations beneath. The maximum heightΔείτεstar
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Δείτεstar
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Δείτεstar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basΔείτεstar
DE-WIEBELSKIRCHEN
The external face, reinforcing panel and top return are a continuous woven mesh unit. Attached to the inside facing is a woven polyester mesh fabric tΔείτεstar
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonΔείτεstar
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeΔείτεstar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tΔείτεstar
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Δείτεstar
ERDOX ZERMATT
Die Gornergrat Bahn hat verschiedene Systeme miteinander verglichen und sich für das wirtschaftlichste System, das ErdoX System von Maccaferri entschΔείτεstar
ERLANGEN A73
Maccaferri through his local partner BECO Bermüller proposed a reinforced soil structure made by modular elements of Green Terramesh 70°. The typicaΔείτεstar
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Δείτεstar
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeΔείτεstar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aΔείτεstar
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cΔείτεstar
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeΔείτεstar
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DueΔείτεstar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toΔείτεstar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system creΔείτεstar
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theΔείτεstar
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineΔείτεstar
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cΔείτεstar
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challeΔείτεstar
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysΔείτεstar
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdΔείτεstar
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Δείτεstar
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useΔείτεstar
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beΔείτεstar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawΔείτεstar
KLOSTER LEHNIN
The IDAS Planungsgesellschaft chose to use the Maccaferri Road Mesh to be installed under the new roadway. T The strength and flexibility of the Road Δείτεstar
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystΔείτεstar
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beeΔείτεstar
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyΔείτεstar
LÄRCHBERG, LOFER
Die WLV hat vorab eine Gefahrenbeurteilung mit Steinschlagsimulationen erarbeitet. Danach wurde das Projekt im Detail geplant und die MateriallieferunΔείτεstar
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of ground level wet and dry holding lagoons. These were impermeably lineΔείτεstar
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Δείτεstar
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeΔείτεstar
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iΔείτεstar
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Δείτεstar
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipΔείτεstar
LV STGEGIA
The client (road authority) decided to use the most economical and effective system, the Maccaferri snow nets. It was a great challenge to install theΔείτεstar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallΔείτεstar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiΔείτεstar
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesΔείτεstar
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Δείτεstar
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moΔείτεstar
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesΔείτεstar
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a neΔείτεstar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Δείτεstar
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walΔείτεstar
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retΔείτεstar
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thΔείτεstar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thΔείτεstar
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Δείτεstar
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Δείτεstar
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Δείτεstar
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to impermeably line the attenuation pond and this was accepted by client HitΔείτεstar
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having removed the refuse, a separator geotextile was placed to provide a Δείτεstar
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoΔείτεstar
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aΔείτεstar
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aΔείτεstar
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aΔείτεstar
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshΔείτεstar
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Δείτεstar
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiΔείτεstar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Δείτεstar
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAΔείτεstar
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofΔείτεstar
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential for differential movement were resolved by supporting the approach rΔείτεstar
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Δείτεstar
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aΔείτεstar
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Δείτεstar
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a strong rodent deterrent. Unlike any plastic grids or thin rabbit netΔείτεstar
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiΔείτεstar
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizΔείτεstar
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininΔείτεstar
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforceΔείτεstar
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Δείτεstar
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in the Windsor area, was tasked by the Town of Amherstburg to devise aΔείτεstar
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofΔείτεstar
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was originally proposed within the design. However, the PVC coating on weldedΔείτεstar
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyΔείτεstar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeΔείτεstar
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Δείτεstar
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedΔείτεstar
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RΔείτεstar
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mΔείτεstar
SAAS BALEN
Maccaferri proposed using the greenable, environmentally friendly, modular Green Terramesh earth reinforcement system. Green Terramesh consists of preΔείτεstar
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshΔείτεstar
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Δείτεstar
SEATION TRAMWAY
The site is situated above an area of soft soil that required substantial ground improvement.The new platform area adjacent to Δείτεstar
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Δείτεstar
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VΔείτεstar
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryΔείτεstar
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeΔείτεstar
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoΔείτεstar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designΔείτεstar
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fΔείτεstar
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplΔείτεstar
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byΔείτεstar
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
Initially, a granular drain mat was installed at the PST (Upper Part of Earthworks) level to capture flows and percolations from surrounding water basΔείτεstar
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaΔείτεstar
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersΔείτεstar
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiΔείτεstar
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Δείτεstar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaΔείτεstar
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bΔείτεstar
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengΔείτεstar
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionΔείτεstar
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacΔείτεstar
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prΔείτεstar
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Δείτεstar
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and implemented a tie-back reinforced gabion retaining wall to act as the slΔείτεstar
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxΔείτεstar
VIERSEN FRITZBRUCH
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Δείτεstar
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingΔείτεstar
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comΔείτεstar
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mΔείτεstar
WASSERBURG – NOISE BARRIER
Maccaferri through his local partner BECO Bermüller proposed a noise barrier made of the modular elements Green Terramesh Duo. Different sectors had Δείτεstar
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfaΔείτεstar
Α/Δ ΠΑΘΕ-ΥΠΟΛ.ΕΡΓΑΣΙΕΣ ΤΜ.ΣΚΑΡΦΕΙΑ-ΛΑΜΙΑ-ΡΑΧΕΣ
As solution to this problem Maccaferri’s product RoadΜesh® L was applied. It is very important to rehabilitate and reinforce the pavement of the hΔείτεstar
ΑΘΗΝΑ – ΜΑΡΙΝΑ ΦΛΟΙΣΒΟΥ – Ελλάδα
Για τη λύση του προβλήματος της υποσκαφής του θαλασσίου πυθμένα επιλέχθηκε η λύσηΔείτεstar
ΑΝΤΙΠΛΗΜΜΥΡΙΚΗ ΠΡΟΣΤΑΣΙΑ ΠΕΡΙΟΧΗΣ Ν.ΕΦΕΣΣΟΥ
Τα μέτρα προστασίας για των υποδομών από πλημμύρες περιλάμβαναν τη διεθέτηση τωνΔείτεstar
ΑΠΟΚΑΤΑΣΤΑΣΗ ΑΣΦΑΛΤΙΚΟΥ ΟΔΟΣΤΡΩΜΑΤΟΣ ΚΑΙ ΤΕΧΝΙΚΩΝ ΕΡΓΩΝ ΣΗΜΑΝΣΗΣ Σ
Η λύση του ελεύθερου πλέγματος προτιμήθηκε για λόγους σχέσης κόστους – αποτελεσμΔείτεstar
ΑΠΟΚΑΤΑΣΤΑΣΗ ΑΣΦΑΛΤΙΚΟΥ ΟΔΟΣΤΡΩΜΑΤΟΣ ΣΤΗΝ ΠΕ ΚΟΖΑΝΗΣ
Ως λύση στο πρόβλημα αυτό, εφαρμόστηκε το προϊόν της Maccaferri Roadmesh®. Η αποκατάσταση κΔείτεstar
ΑΠΟΚΑΤΆΣΤΑΣΗ ΚΑΤΟΛΊΣΘΗΣΗΣ THΣ ΟΔΟΥ ΔΙΑΚΟΠΤΟΥ ΚΑΛΑΒΡΥΤΩΝ
Η μελέτη προέβλεπε την τοποθέτηση Φράχτη Ανάσχεσης βραχοπτώσεων με ικανότητα αποΔείτεstar
ΑΠΟΚΑΤΑΣΤΑΣΗ ΟΔΟΠΟΙΙΑΣ ΣΤΗΝ ΑΓΙΑ ΜΑΡΙΝΑ ΧΑΝΙΩΝ
Καθώς στα πρανή το πρόβλημα ήταν ο έλεγχος της επιφανειακής διάβρωσης αλλά και η εΔείτεstar
ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΡΕΜΑΤΟΣ ΛΟΥΤΡΑΚΙΟΥ
Η τεχνική πρόταση της Maccaferri Hellas ήταν η χρήση 3-d γεωπλεγμάτων για την επένδυση των πΔείτεstar
ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΣΕ ΤΜΗΜΑΤΑ ΤΗΣ ΕΟ ΘΕΣΣΑΛΟΝΙΚΗΣ ΜΟΥΔΑNIΩΝ
Για την αντιστήριξη του αρχικού πρανούς θα κατασκευαστεί τοίχος με συρματοκιβώτΔείτεstar
ΑΠΟΚΑΤΑΣΤΑΣΗ ΤΟΥ ΕΘ. ΟΔ. ΔΙΚΤΥΟΥ ΣΤΟΥΣ ΔΕΛΦΟΥΣ
As solution to this problem Maccaferri’s product Roadmesh was applied. It is very important to rehabilitate and reinforce the pavement of the highwaΔείτεstar
ΑΠΟΚΑΤΑΣΤΑΣΗ ΧΑΔΑ ΩΡΩΠΟΥ
Το τρισδιάστατο γεώπλεγμα MACGRID T 55 τοποθετήθηκε σαν κάλυμμα του κυττάρου με σκοπόΔείτεstar
ΒΕΛΤΙΩΣΗ ΠΡΑΝΩΝ ΚΟΡΙΝΘΟΥ – ΤΡΙΠΟΛΗΣ
Καθώς στα πρανή το πρόβλημα ήταν ο έλεγχος της επιφανειακής διάβρωσης αλλά και η εΔείτεstar
Ε.Ο ΑΓΡΙΝΙΟΥ ΚΑΡΠΕΝΗΣΙΟΥ
Ως λύση στο πρόβλημα αυτό, εφαρμόστηκε το πολυεστερικό γεώπλεγμα τύπου Macgrid WG 4 τηςΔείτεstar
Ε.Ο.ΠΑΤΡΑ-ΤΡΙΠΟΛΗ-ΠΑΡ.ΤΜ.ΦΡΑΓΜΑΤΟΣ ΠΕΙΡΟΥ ΠΑΡΑΠΕΙΡΟΥ
Η εταιρεία μας πρότεινε τη κατασκευή του οπλισμένου επιχώματος με το σύστημα PARAMESΔείτεstar
ΕΓΝΑΤΙΑ ΟΔΟΣ / ΤΜΗΜΑ ΑΝΘΟΧΩΡΙ – ΜΕΤΣΟΒΟ
Η Maccaferri Hellas συνεργάστηκε με τον ανάδοχο του έργου προσφέροντας τεχνικές λύσεις μΔείτεstar
ΕΝΙΧΥΣΗ ΕΔΑΦΟΥΣ ΣΕ ΙΔΙΩΤΙΚΟ ΕΡΓΟ
Ως λύση στο πρόβλημα αυτό, εφαρμόστηκε το πολυεστερικά γεώπλεγμα τύπου Macgrid WG. Πιο Δείτεstar
ΕΠΕΝΔΥΣΗ ΠΡΑΝΟΥΣ ΓΗΠΕΔΟ ΚΑΛΛΙΘΕΑΣ
Στη συγκεκριμένη εφαρμογή ήταν απαραίτητη η φιλική προς το περιβάλλον αντιμετώπιΔείτεstar
ΕΡΓΑΣΙΕΣ ΕΠΑΡΧΙΑΚΗΣ ΟΔΟΥ ΕΛΛΗΝΙΚΟ – ΚΑΛΕΤΖΙ
H χρήση του ελεύθερου πλέγματος SteelGrid MO – 300, αγκυρωμένο στην στέψη και τον πόδα τουΔείτεstar
ΕΡΓΑΣΙΕΣ ΠΡΟΣΤΑΣΙΑΣ ΠΡΑΝΩΝ ΣΠΗΛΑΙΟΥ ΚΟΥΤΟΥΚΙ
Η τεχνική πρόταση της Maccaferri Hellas ήταν η χρήση πλήρως αγκυρούμενου πλέγματος προσταΔείτεstar
ΙΟΝΙΑ ΟΔΟΣ
Βάση των τεχνικών προδιαγραφών της κατασκευάστριας εταιρείας χρησιμοποιήθηκαν 3Δείτεstar
ΚΑΝΑΛΙ ΛΟΥΤΡΑΚΙΟΥ
Οι υπεύθυνοι μηχανικοί σε συνεργασία με τη Maccaferri , έκριναν ως την καλύτερη και πιο Δείτεstar
ΚΑΤΑΣΚ.ΟΠΛ.ΕΠΙΧΩΜΑΤΟΣ ΓΙΑ ΥΠΟΣΤΗΡΙΞΗ ΝΕΟΥ Α/Δ Α2
Οι μηχανικοί μας υποστήριξαν τη μελετητική ομάδα των μηχανικών όσον αφορά την εφαΔείτεstar
ΚΑΤΑΣΚΕΥΗ Α/Δ ΟΛΥΜΠΙΑ ΟΔΟΣ
Η λύση του συστήματος με Green Terramesh προτιμήθηκε για λόγους σχέσης κόστους – αποτελεΔείτεstar
ΚΑΤΑΣΚΕΥΗ Α/Δ ΟΛΥΜΠΙΑ ΟΔΟΣ-Ελλάδα
Η Maccaferri Hellas συνεργάστηκε με τους μελετητές κατά τη φάση του σχεδιασμού καθώς και μΔείτεstar
ΚΑΤΑΣΚΕΥΗ ΤΟΙΧΙΟΥ ΑΝΤΙΣΤΗΡΙΞΗΣ ΣΤΟ Δ.Δ ΜΕΝΔΕΝΙΤΣΑΣ
Η μελέτη προέβλεπε την κατασκευή ενός οπλισμένου τοιχίου στον πόδα του πρανούς καΔείτεstar
ΜΕΤΑΛΛΕΙΟ ΣΤΗΝ ΒΟΡΕΙΑ ΕΛΛΑΔΑ
Η λύση του ελεύθερου πλέγματος Steelgrid MO-300, προτιμήθηκε για λόγους σχέσης κόστους –Δείτεstar
ΜΕΤΡΑ ΠΡΟΣΤΑΣΙΑΣ-ΑΡΣΗ ΚΑΤΑΠΤΩΣΕΩΝ ΠΡΑΝΩΝ ΝΟΜΟΥ ΑΡΓΟΛΙΔΑΣ
Οι παράγοντες οι οποίοι μπορούν να επηρεάσουν την επιλογή των κατάλληλων παρεμβάΔείτεstar
ΟΔΟΠΟΙΙΑ ΣΧΗΜΑΤΑΡΙ ΧΑΛΚΙΔΑ
Η μελέτη προέβλεπε σαν προσωρινό μέτρο την τοποθέτηση Φράχτη Ανάσχεσης βραχοπτώσΔείτεstar
ΟΛΟΚΛΗΡΩΣΗ ΚΑΤΑΣΚΕΥΗΣ ΤΗΣ ΟΔΟΥ ΑΓ. ΒΑΡΒΑΡΑ – ΑΠΟΜΑΡΜΑ
Επιλέχθηκε ένας συνδυασμός υλικών για το καλύτερο δυνατόν αποτέλεσμα. Η MACCAFERRI HELLASΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΑΓΩΓΟΥ-ΑΝΤΙΣΤΗΡΙΞΗ ΠΡΑΝΟΥΣ
Οι υπεύθυνοι μηχανικοί σε συνεργασία με τη Maccaferri Hellas, έκριναν ως την καλύτερη καιΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΑΠΟ ΒΡΑΧΟΠΤΩΣΕΙΣ ΤΕΛΕΦΕΡΙΚ—ΛΙΜΕΝΑΣ ΑΘΗΝΙΟΥ , ΣΑΝΤΟΡΙΝΗ,
Μια αρχική προμελέτη είχε γίνει η οποία προέβλεπε Φράχτες Ανάσχεσης βραχοπτώσεωνΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΒΑΘΡΩΝ ΓΕΦΥΡΑΣ ΣΤΗΝ ΕΓΝΑΤΙΑ ΟΔΟ
Η ταχύτερη αλλά και η καλύτερη οικονομοτεχνικά λύση ήταν η επένδυση όλων των βάθρΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΒΡΑΧΟΠΤΩΣΕΩΝ ΛΙΜΝΟΔΕΞΑΜΕΝΗΣ ΞΗΡΟΠΟΤΑΜΟΥ ΣΤΗΝ ΣΑΜΟΘΡΑΚΗΣ
Καθώς τα επικίνδυνα βραχοτεμάχια ήταν ιδιαίτερα ογκώδη, επιλέχθηκε η λύση του πλήΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΕΠΙΣΚΕΠΤΩΝ ΣΤΟ NOTIO ΤΕΙΧΟΣ ΑΚΡΟΠΟΛΗΣ
Η Maccaferri Hellas συνεργάστηκε με την αρμόδια υπηρεσία του Υπουργείου Πολιτισμού και μεΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΚΑΝΑΛΙΟΥ ΜΟΡΝΟΥ – ΔΙΩΡΥΓΑ ΤΑΞΙΑΡΧΩΝ
Η Maccaferri πρότεινε στον εργολάβο την τοποθέτηση ενός φράκτη ανάσχεσης βραχοπτώσεωνΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΚΑΤΟΙΚΙΩΝ ΑΠΟ ΒΡΑΧΟΠΤΩΣΕΙΣ
H αρχική μελέτη είχε πραγματοποιηθεί και προέβλεπε τοποθέτηση Φράχτη ΑνάσχεσηςΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΟΙΚΙΣΜΟΥ Δ.Δ. ΝΕΑΠΟΛΗ (ΛΑΚΩΝΙΑΣ) ΑΠΟ ΚΑΤΟΛΙΣΘΗΣΕΙΣ
Η Maccaferri Hellas συνεργάστηκε με τον ανάδοχο του έργου προσφέροντας εκτός από προϊόνταΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ ΕΡΓΟΣΤΑΣΙΟΥ ΗΛΕΚΤΡΙΚΗΣ ΕΝΕΡΓΕΙΑΣ
Η τεχνική πρόταση της Maccaferri Hellas ήταν η χρήση τρισδιάστατων γεωπλεγμάτων για την εΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ ΝΟΤΙΑ ΠΑΡΑΚΑΜΨΗ ΕΔΕΣΣΑΣ
Πολλοί είναι οι παράγοντες που μπορούν να επηρεάσουν την επιλογή των κατάλληλων πΔείτεstar
ΠΡΟΣΤΑΣΙΑ ΣΗΡΑΓΓΑΣ ΓΚΡΟΠΑΣ
Στα πρανή το πρόβλημα ήταν ο έλεγχος της επιφανειακής διάβρωσης αλλά και η ενίσχυΔείτεstar
ΣΤΑΘΕΡΟΠΟΙΗΣΗ& ΑΠΟΚΑΤΑΣΤΑΣΗ ΠΡΑΝΩΝ ΣΤΟΝ ΟΙΚΙΣΜΟ ΗΡΕΜΟ ΚΥΜΑ ΜΕΓΑΡΩΝ
Επιλέχθηκε η λύση του πλήρως αγκυρούμενου πλέγματος και συγκεκριμένα το STEELGRID ΒO30Δείτεstar
ΣΤΑΘΜΟΣ ΣΤΑΘΕΥΣΗΣ ΕΓΝΑΤΙΑΣ ΟΔΟΥ
Maccaferri Hellas has provided local authorities and the contractor with all available data on the geogrids in order to support them during the designΔείτεstar
ΤΕΛΙΚΗ ΚΑΛΥΨΗ ΧΑΔΑ
Ο γεωσυνθετικός φραγμός από μπετονίτη MACLINE GCL W21 τοποθετήθηκε στη τελική κάλυψη τωΔείτεstar
ΤΕΧΝ.ΕΡΓΑ ΑΝΑΣΧΕΣΗΣ ΒΡΑΧΟΠΤΩΣΕΩΝ ΠΡΑΝΟΥΣ, 5Η Ε.Ο. ΠΑΡΓΑ-ΑΝΘΟΥΣΑ
Επιλέχθηκε η λύση του πλήρως αγκυρούμενου πλέγματος και συγκεκριμένα το STEELGRID ΒO30Δείτεstar
ΥΔΡΑΥΛΙΚΑ ΕΡΓΑ – ΠΡΟΣΤΑΣΙΑ ΠΡΑΝΩΝ-ΑΓΩΓΟΥ
Οι μηχανικοί του έργου, με την υποστήριξη της εταιρείας μας, θεώρησαν ως καλύτερη Δείτεstar
ΥΔΡΕΥΣΗ ΗΡΑΚΛΕΙΟΥ ΚΑΙ ΑΓΙΟΥ ΝΙΚΟΛΑΟΥ ΑΠΟ ΤΟ ΦΡΑΓΜΑ ΑΠΟΣΕΛΕΜΗ
Τα υδραυλικά έργα περιελάμβαναν την χρήση προκατασκευασμένων συρματοκιβωτιών καΔείτεstar
ΦΡΑΓΜΑ ΜΑΥΡΟΜΑΤΙ, ΟΛΟΚΛΗΡΩΣΗ ΚΑΤΑΣΚΕΥΗΣ ΦΡ. ΝΕΡΟΥ
Οι παράγοντες οι οποίοι μπορούν να επηρεάσουν την επιλογή των κατάλληλων παρεμβάΔείτεstar
ΧΩΡΟΙ ΑΝΕΞΕΛΕΓΚΤΗΣ ΔΙΑΘΕΣΗΣ ΑΠΟΡΡΙΜΜΑΤΩΝ
Maccaferri’s geosynthetics were applied in 3 different areas of the Municipality according to the project’s design. Geomembrane and drainage compoΔείτεstar
Δεν βρήκατε αυτό που αναζητούσατε?
Γνωρίστε τους ειδικούς μας
Εκπροσωπούμε ένα νικητήριο συνεργάτη για τον πολύπλοκο κόσμο των πολιτικών και βιομηχανικών κατασκευών. Χάρη σε μια ευρεία γκάμα προϊόντων μας, απαντούμε στις διάφορες τεχνικές απαιτήσεις του τομέα: από την αποστράγγιση και προστασία έως το νερό και την υδατοστεγανοποίηση των δομών και επικαλύψεων, την εξοικονόμηση ενέργειας έως την άνεση της κατοικίας, από τον έλεγχο του ατμού έως τα ζητήματα που σχετίζονται με αυτό.