Gabions
Our Legacy in every twist
Born at the inception of our company, the Maccaferri Gabion is more than a product—it's a cornerstone of innovation. These Double-Twisted "DT" wire mesh containers transform into flexible, permeable structures like gravity walls, retaining walls and revetments, pivotal for modern geotechnical and erosion control projects.
PoliMac Coating: Engineering Resilience
Infused with our groundbreaking PoliMac® coating, our gabions defy the harshest elements. This coating enhances their durability against abrasion, chemicals, cold, and UV rays, ensuring they withstand time and nature alike. Also available is Bio PoliMac®, made from bio-naphtha derived from sustainable raw materials and originated from biobased feedstock , further emphasizing our commitment to environmental sustainability.
Optimizing with Maccaferri GAWAC 3.0
The future of structural integrity is here with our GAWAC 3.0 software. It uses the GSC concept to predict a century-spanning lifespan, marrying cost-effectiveness with robust environmental stewardship.
Sustainable Engineering
By integrating PoliMac with the GSC concept, we’re setting new standards in sustainability—reducing material use, slashing CO2 emissions by 40%, and fostering an environment where nature thrives alongside human ingenuity. Visit maccaferri.com/EPD to see how we're pioneering products that respect both the planet and our future. Embrace a design philosophy that's as economically savvy as it is environmentally sound.
Reduced Total Cost of Ownership
The strategic use of gabions results in a lower total cost of ownership by:
Reducing the amount of stone required, thus saving costs
Offering outstanding performance with PoliMac® coating, which minimizes maintenance needs
Facilitating faster and easier installation due to material reduction, thereby increasing production rates
Prioritizing the environment by cutting down on quarry stone extraction
Seamless Integration with BIM
Efficiency meets accuracy with our BIM-ready products, ensuring seamless integration into any project, enhancing collaboration, and cutting both costs and time significantly.
A Wide Portfolio of Solutions
Maccaferri offers an extensive range of tailored solutions to meet every specific need. From CubiMac for pre-filled and liftable gabions to Gabion Strong Face units optimized for cost and mechanical efficiency, to our new enhanced wires designed for varied demands, we provide the best solution for every situation.
EXPLORE OUR GABIONS' HISTORY
Success Stories
Built, not just drawn
Discover more
HATTA WADIS DEVELOPMENT LEEM POND
United Arab Emirates
As part of Hatta comprehensive development plan launched by His Highness Sheikh Mohammed Bin Rashid Al Maktoum, Ruler of Dubai; the Dubai Municipality is required to develop Leem Pond to sustain water in all seasons which will enhance its scenic value to boost tourism in Hatta. It is intended to feed the Leem pond from ground water and compensate for evaporation losses through periodic pumping. The project would involve the typical civil works like excavation, filling, concreting, ducts etc but the main scope of the contractor would be lining and bank stabilization of Leem pond. Since the overall object of the project is to improve the Hatta Wadi tourism, the required scheme of protection and lining must be environmentally friendly and natural such that the new development works will easily integrate with the existing natural surroundings.
Discover more
THE NEW ROUTE DU LITTORAL
France
Situated between the sea and the cliffs, the current Route du Littoral (RN1) was subject to numerous rockfalls requiring frequent restrictions or closures and very heavy maintenance, and regularly causing fatal accidents, despite the barrier measures previously put in place. The Nouvelle Route du Littoral (New Coastal Road), which is intended to replace the existing RN1, has been laid out at sea, 80 to 300 metres from the shore, to avoid the risk of rockfalls. It is 12. 5 km long, including 6. 7 km of embankments and 5. 6 km of viaduct, and 29 m wide (2x3 traffic lanes + BU + cycle paths). Total cost of the project: €1. 6 billion. The road is based on a sea embankment and a viaduct: the Viaduct package being led by the Vinci/Bouygues consortium, and the Dykes package by the GTOI (Colas)/SBTPC consortium, which subcontracted the installation of the gabions to Inexence Réalisation OI. Four dykes were to be built, totaling 3 km in length.
Discover more
JUMEIRAH HOTEL MAS POOL
United Arab Emirates
M/s. Jumeirah Group appointed AK Design to develop the new MAS swimming pool at Al Qasr within the Madinat Jumeirah project in Dubai. The swimming pool is to be located on the open beachfront of the hotel. The Marine designer considered a return period of 1 in 100 years for the extreme design storm condition, and the client required a design life of 50 years for the pool. For the required 50-year design life, the 1 in 100-year storm event's probability is approximately 40%. The cross-shore beach response modeling studies revealed that the potential scours below the pool could be as deep as 2. 5m. Consequently, the pools' foundations must be designed to prevent lateral movement, settlement, and tilting of the pool when the beach sand is mobilized. The designer considered different conventional foundation protection options out of which secant pile option was recommended. However, the end client identified the following practical disadvantages with the secant pile wall solution; (1) Moderately costly (2) Significant disturbance to hotel guests due to noisy construction, (3) Heavy equipment required, (4) Reflects wave energy leading to beach scour and (5) Poor appearance when uncovered.
Discover more
Deep dive into
Gabions
What we can do with
Gabions
Get in touch with us
[contactForm_txtSuccessSubmit]