ความท้าทาย

This project has implied reinforced soil wall design, material supply and installation for a high-speed bike lane between the neighborhood of Deurne and Borgerhout in the city of Antwerp (Belgium). The main contractor was the Colas Group. Tractebel Engineering N.V. made the whole design with several different inclinations of the RSS to give a more natural and pleasant view. The walls were built along a very trafficked highway and they were aimed to act as a sound barrier for the houses in the suburban neighborhood as well. 

โซลูชัน

Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh Green Light that was produced specifically to meet the design requirements and slope inclinations. The project included also welded gabions walls and RSS built using EPS blocks to reduce the weight of the walls since the poor bearing capacity of the soil in situ. The construction took place between May 2019 and November 2019. In May 2020 the slopes were already completely vegetated.

ดาวน์โหลด เรื่องราวความสำเร็จ

RINGFIETSPAD ANTWERP

ดาวน์โหลด
RINGFIETSPAD ANTWERP

ผลิตภัณฑ์ของเราสำหรับ
เรื่องราวความสำเร็จนี้ เรื่องราวความสำเร็จ

ติดต่อเรา

หากท่านยอมรับนโยบายความเป็นส่วนตัวของบริษัทและเข้าใจเนื้อหาดังกล่าวแล้ว ผู้ควบคุมข้อมูลขอสอบถามว่าท่านยินยอมให้มีการประมวลผลข้อมูลตามวิธีที่กำหนดไว้ในนโยบายความเป็นส่วนตัวของบริษัท เพื่อวัตถุประสงค์ในการส่งข้อมูลส่งเสริมการขายเกี่ยวกับบริการ/กิจกรรมที่จัดทำโดยผู้ควบคุมข้อมูลหรือไม่ *

นอกจากนี้ ผู้ควบคุมข้อมูลขอสอบถามว่าท่านยินยอมให้เปิดเผยข้อมูลส่วนบุคคลของท่านแก่บริษัทในเครือ Maccaferri หรือไม่ รวมถึงการโอนข้อมูลออกนอกสหภาพยุโรปที่อาจเกิดขึ้นตามมา เพื่อวัตถุประสงค์ของบริษัทในเครือดังกล่าวเอง ซึ่งรวมถึงวัตถุประสงค์ในการส่งเสริมการขาย (การส่งข้อมูลทางการตลาด) *