MURO DE CONTENCION CARR. ACAYUCAN - LA VENTOSA

ปี
2023
สถานที่ตั้ง
MATIAS ROMERO - OAXACA - México
ลูกค้า
SICT
ผู้ออกแบบ
SICT

ความท้าทาย

The modernisation works on the Acayucan - La Ventosa road include the widening of the crown from 7m to 12m, as well as the correction of curves and gradients to maintain operating speed. The new layout shifts the axis and zeros lines of the current road, which passes through numerous population centres, including Estación Sarabia at km 174+770, where space to accommodate the over-widths is limited.

โซลูชัน

The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and the one proposed by Maccaferri with a 4m high gabion gravity wall and internal staggering was chosen. The construction of a trapezoidal section channel was also considered in order to direct the discharges from 2 transversal drainage works towards the nearest natural watercourse.

ดาวน์โหลด เรื่องราวความสำเร็จ

MURO DE CONTENCION CARR. ACAYUCAN - LA VENTOSA

ดาวน์โหลด
MURO DE CONTENCION CARR. ACAYUCAN - LA VENTOSA

ติดต่อเรา

หากท่านยอมรับนโยบายความเป็นส่วนตัวของบริษัทและเข้าใจเนื้อหาดังกล่าวแล้ว ผู้ควบคุมข้อมูลขอสอบถามว่าท่านยินยอมให้มีการประมวลผลข้อมูลตามวิธีที่กำหนดไว้ในนโยบายความเป็นส่วนตัวของบริษัท เพื่อวัตถุประสงค์ในการส่งข้อมูลส่งเสริมการขายเกี่ยวกับบริการ/กิจกรรมที่จัดทำโดยผู้ควบคุมข้อมูลหรือไม่ *

นอกจากนี้ ผู้ควบคุมข้อมูลขอสอบถามว่าท่านยินยอมให้เปิดเผยข้อมูลส่วนบุคคลของท่านแก่บริษัทในเครือ Maccaferri หรือไม่ รวมถึงการโอนข้อมูลออกนอกสหภาพยุโรปที่อาจเกิดขึ้นตามมา เพื่อวัตถุประสงค์ของบริษัทในเครือดังกล่าวเอง ซึ่งรวมถึงวัตถุประสงค์ในการส่งเสริมการขาย (การส่งข้อมูลทางการตลาด) *