CONSERVATION AND RESTORATION PROJECT FOR BUENG TAKENG, BANG RAKAM

ปี
2024
สถานที่ตั้ง
PHITSANULOK - THAILAND - Thailand
ลูกค้า
Department of Water Resources
ผู้ออกแบบ
Department of Water Resources

ความท้าทาย

Bueng TaKeng is a big freshwater area located in Bang Rakam district having the potential to store water of around 14.0 million cubic meters and before this project, the potential for water reservation was lost by around 50%. If the study of the potential of this project for restoration to improve the efficiency of restoration by get the inlet from KhaoRang Canal, Pho Canal and Tamo Canal this can be reducing the drought problem during the dry season and mitigating flooding issues during the Monsoon season. Moreover, the main issue in the area is the collapse of riverbanks due to erosion caused by water flow, which leads to instability and sloping. Therefore, it is necessary to address this problem properly and sustainably to accommodate the water diversion from the mentioned canals.

โซลูชัน

Maccaferri designed solutions with technicians from the Water Resources Department by surveying and gathering data such as Water level, Average precipitation, Soil Profile and Contour line for designing and presenting proper solution. Maccaferri present soil compaction with gabion facing to create a scour protection from rivers flux, this solution consists of gabion with special coating by Maccaferri, known as ‘GalMac’ together with geogrid to be a strong reinforce soil structure with the following details. 1. GalMac Gabion size 2x1x0.5 considerably use at height 0 to 7 meters with 1.5m embedded to layer compaction in accordance with the use of MacGrid WG with lengths of 13 meters and 9 meters. While GalMac Gabion size 2x1x1 are used at height of 7 to 12 meters for using accordance with MacGrid WG length of 5 m. 2. Geotextile are used to lay behind gabion box to let water goes to and Filter soil particles to prevent them from escaping the soil compaction system to enhance load-bearing capacity in the retainin

ดาวน์โหลด เรื่องราวความสำเร็จ

CONSERVATION AND RESTORATION PROJECT FOR BUENG TAKENG, BANG RAKAM

ดาวน์โหลด
CONSERVATION AND RESTORATION PROJECT FOR BUENG TAKENG, BANG RAKAM

ผลิตภัณฑ์ของเราสำหรับ
 เรื่องราวความสำเร็จ

ติดต่อเรา

หากท่านยอมรับนโยบายความเป็นส่วนตัวของบริษัทและเข้าใจเนื้อหาดังกล่าวแล้ว ผู้ควบคุมข้อมูลขอสอบถามว่าท่านยินยอมให้มีการประมวลผลข้อมูลตามวิธีที่กำหนดไว้ในนโยบายความเป็นส่วนตัวของบริษัท เพื่อวัตถุประสงค์ในการส่งข้อมูลส่งเสริมการขายเกี่ยวกับบริการ/กิจกรรมที่จัดทำโดยผู้ควบคุมข้อมูลหรือไม่ *

นอกจากนี้ ผู้ควบคุมข้อมูลขอสอบถามว่าท่านยินยอมให้เปิดเผยข้อมูลส่วนบุคคลของท่านแก่บริษัทในเครือ Maccaferri หรือไม่ รวมถึงการโอนข้อมูลออกนอกสหภาพยุโรปที่อาจเกิดขึ้นตามมา เพื่อวัตถุประสงค์ของบริษัทในเครือดังกล่าวเอง ซึ่งรวมถึงวัตถุประสงค์ในการส่งเสริมการขาย (การส่งข้อมูลทางการตลาด) *