CLOSE ROAD - RIO RUIDOSO CROSSING STRUCTURE

สถานที่ตั้ง
RUIDOSO - NEW MEXICO - U.S.A.
ลูกค้า
Village of Ruidoso
ผู้ออกแบบ
ZIA Engineering & Environmental Consultants

ความท้าทาย

After significant flooding events within the Rio Ruidoso,  several business and municipal facilities experienced   challenges attempting to travel to the Upper Canyon via   Close Road crossing the Main Bridge. The project area is   identified within Section 27 of Township 11 South, Range 13   East, within the Village of Ruidoso, New Mexico. The existing   channel is a well- defined watercourse composed of large   boulders. The existing channel is approximately 28 feet wide   and ranges from approximately 4 to 9 feet tall.  

โซลูชัน

The proposed channel is approximately 28 feet wide and 6  feet tall. The proposed channel sidewalls will be stabilized   with gabion baskets. On October 12, 2017, the Village and   Zia Engineering conducted a public status meeting at the   Upper Canyon Lodging Company in order to update the   affected property owners and explain the project challenges,   construction schedule, USACE permitting and final design.  

ดาวน์โหลด เรื่องราวความสำเร็จ

CLOSE ROAD - RIO RUIDOSO CROSSING STRUCTURE

ดาวน์โหลด
CLOSE ROAD - RIO RUIDOSO CROSSING STRUCTURE

ผลิตภัณฑ์ของเราสำหรับ
เรื่องราวความสำเร็จนี้ เรื่องราวความสำเร็จ

ติดต่อเรา

หากท่านยอมรับนโยบายความเป็นส่วนตัวของบริษัทและเข้าใจเนื้อหาดังกล่าวแล้ว ผู้ควบคุมข้อมูลขอสอบถามว่าท่านยินยอมให้มีการประมวลผลข้อมูลตามวิธีที่กำหนดไว้ในนโยบายความเป็นส่วนตัวของบริษัท เพื่อวัตถุประสงค์ในการส่งข้อมูลส่งเสริมการขายเกี่ยวกับบริการ/กิจกรรมที่จัดทำโดยผู้ควบคุมข้อมูลหรือไม่ *

นอกจากนี้ ผู้ควบคุมข้อมูลขอสอบถามว่าท่านยินยอมให้เปิดเผยข้อมูลส่วนบุคคลของท่านแก่บริษัทในเครือ Maccaferri หรือไม่ รวมถึงการโอนข้อมูลออกนอกสหภาพยุโรปที่อาจเกิดขึ้นตามมา เพื่อวัตถุประสงค์ของบริษัทในเครือดังกล่าวเอง ซึ่งรวมถึงวัตถุประสงค์ในการส่งเสริมการขาย (การส่งข้อมูลทางการตลาด) *