MacMat
Solusi canggih untuk pengendalian erosi dan perkuatan tanah
Geomat terbuat dari filamen bahan sintetis. Filamen-filamen tersebut terjerat panas bersama untuk membentuk lapisan tiga dimensi, sangat mudah berubah bentuk dan dengan porositas tinggi (biasanya sekitar 90% atau bahkan lebih tinggi). Geomat adalah solusi permanen jangka panjang yang cocok untuk mengatasi masalah pengendalian erosi baik di lingkungan kering maupun basah. Geomat ini dapat melindungi lereng dengan baik dari erosi yang disebabkan oleh aliran air dari tetesan hujan maupun sungai.
Kisah Sukses
Dibangun, bukan hanya digambar
Temukan lebih lanjut
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
United States
They needed to protect their new infrastructure from erosion caused by the Deadman Wash in North Phoenix Arizona. They needed to re-grade a channel that was 2 miles long, 300 ft wide and 6 ft tall to divert the storm water and prevent soil loss at the bed and banks. We also used semi-rigid hydraulic protection to suit the arid climate of the region. They needed to complete the project in a short time, with enough monetary savings and approval from the Maricopa Flood Control District. The Installation of the project was performed by BUESING Corporation Contracting.
Temukan lebih lanjut
DIDIPIO MINE ACCESS ROAD
OceanaGold (Philippines), Inc. owns and operates the high-grade gold and copper Didipio mining project bounded by the provinces of Quirino and Nueva Vizcaya, about 270 km north of Manila, Philippines. Prior to opening the site for operation, construction of a 24-kilometer access road was required. Large portions of mountain slopes were cut for the said purpose. The cut slopes, when exposed to rain, were prone to erosion. Immediate prevention was required to address the problem.
Temukan lebih lanjut
FESTIVAL SUPERMALL MOUND PROMONTORY
Filinvest Land Incorporated (FLI), one of the country’s top land developers, expanded and upgraded an existing shopping mall complex, the Festival Supermall, located in the southern part of Metro Manila. The mall features a scenic landscape of terrains and flats, and right at the heart of the mall's green landscapes was a proposed mound promontory. The promontory is a naturally-cut slope with average facing angle of 70 degrees. A visit to the site was first conducted in the first quarter of 2015. The top portion of the mound was planned to be used as a small park and as a viewing deck. In this, to protect the cut slopes of the mound promontory against possible erosion due to rainfall and surface runoff, FLI required a slope protection system.
Temukan lebih lanjut
Mendalami
MacMat
Apa yang bisa kita lakukan dengan
MacMat
Hubungi kami
[contactForm_txtSuccessSubmit]