TERRAMESH® VERDE CARRETERA MATARANI KM. 24

Tahun
2019
Lokasi
ISLAY - AREQUIPA - Perú
Klien
OBRAS DE INGENIERÍA S.A.C.
Perancang
HOB CONSULTORES S.A.

Tantangan

At km 24, access ramps were required for the bypass road to the town of Mejía, which would pass through agricultural land with an elevation of more than 12 m. in height. Due to the length and height of the ramp, the use of reinforced concrete was ruled out due to the high cost, and also because it was in the middle of agricultural areas, the use of embankments was not considered, with Terramesh® Verde being the best alternative.

Solusi

This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bridges and embankments, reducing the margins of expropriation of agricultural land, allowing for walls more than 10 m high. Furthermore, the solutions have a low environmental impact as they are in contrast with the ecosystem of the area. In this section of the road, the use of soil slopes reinforced with Terramesh® Verde was applied for the execution of the access ramps on the road.

Unduh Kisah Sukses

TERRAMESH® VERDE CARRETERA MATARANI KM. 24

Unduh
TERRAMESH® VERDE CARRETERA MATARANI KM. 24

Produk kami untuk
kisah sukses ini Kisah Sukses

Hubungi kami

Jika Anda menyetujui Kebijakan Privasi perusahaan dan telah memahami isinya, Pengendali Data menanyakan apakah Anda menyetujui pemrosesan data dengan cara yang ditetapkan dalam kebijakan privasi perusahaan, untuk tujuan pengiriman komunikasi promosi mengenai layanan/kegiatan yang disediakan oleh Pengendali Data. *

Selain itu, Pengendali Data menanyakan apakah Anda memberikan persetujuan untuk pengungkapan data pribadi Anda kepada Afiliasi Maccaferri, serta kemungkinan transfer data ke luar UE yang dapat terjadi akibatnya, untuk tujuan mereka sendiri, termasuk tujuan promosi (pengiriman komunikasi pemasaran) *