Tantangan

The Public Works Department planned to build a check dam on the river Ruhu with flood control and sediment catchment purpose in order to stabilize the river basin surrounding the populated areas.

Solusi

The check dam is 3,5 m high and 35 m wide provided with a 15 m long stilling basin. The weir and the stilling basin are entirely built using flexible and 1,0 m Gabions and 30 cm Reno Mattresses. Mattresses are flexible modular elements which allow high levels of deformation and settlements without compromising the weir body integrity. The metallic structures are concrete capped to prevent the excessive abrasion of the double twist mesh due to debris and sediment impact. After the weir construction, the structure experienced a severe flood without any visible damage. Gabions and Reno Mattresses have shown to be a valid alternative to the use of reinforced concrete for weir construction traditionally used in Indonesia both in terms of flexibility, durability and cost effectiveness.

Unduh Kisah Sukses

RIVER REVETMENT WAY RUHU

Unduh
RIVER REVETMENT WAY RUHU

Produk kami untuk
 Kisah Sukses

Hubungi kami

Jika Anda menyetujui Kebijakan Privasi perusahaan dan telah memahami isinya, Pengendali Data menanyakan apakah Anda menyetujui pemrosesan data dengan cara yang ditetapkan dalam kebijakan privasi perusahaan, untuk tujuan pengiriman komunikasi promosi mengenai layanan/kegiatan yang disediakan oleh Pengendali Data. *

Selain itu, Pengendali Data menanyakan apakah Anda memberikan persetujuan untuk pengungkapan data pribadi Anda kepada Afiliasi Maccaferri, serta kemungkinan transfer data ke luar UE yang dapat terjadi akibatnya, untuk tujuan mereka sendiri, termasuk tujuan promosi (pengiriman komunikasi pemasaran) *