Tantangan

This project has implied reinforced soil wall design, material supply and installation for a high-speed bike lane between the neighborhood of Deurne and Borgerhout in the city of Antwerp (Belgium). The main contractor was the Colas Group. Tractebel Engineering N.V. made the whole design with several different inclinations of the RSS to give a more natural and pleasant view. The walls were built along a very trafficked highway and they were aimed to act as a sound barrier for the houses in the suburban neighborhood as well. 

Solusi

Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh Green Light that was produced specifically to meet the design requirements and slope inclinations. The project included also welded gabions walls and RSS built using EPS blocks to reduce the weight of the walls since the poor bearing capacity of the soil in situ. The construction took place between May 2019 and November 2019. In May 2020 the slopes were already completely vegetated.

Unduh Kisah Sukses

RINGFIETSPAD ANTWERP

Unduh
RINGFIETSPAD ANTWERP

Produk kami untuk
kisah sukses ini Kisah Sukses

Hubungi kami

Jika Anda menyetujui Kebijakan Privasi perusahaan dan telah memahami isinya, Pengendali Data menanyakan apakah Anda menyetujui pemrosesan data dengan cara yang ditetapkan dalam kebijakan privasi perusahaan, untuk tujuan pengiriman komunikasi promosi mengenai layanan/kegiatan yang disediakan oleh Pengendali Data. *

Selain itu, Pengendali Data menanyakan apakah Anda memberikan persetujuan untuk pengungkapan data pribadi Anda kepada Afiliasi Maccaferri, serta kemungkinan transfer data ke luar UE yang dapat terjadi akibatnya, untuk tujuan mereka sendiri, termasuk tujuan promosi (pengiriman komunikasi pemasaran) *