MSE WALL SUPPORTS THE ROAD CONNECTION OF NORTH BALI AND SOUTH BALI

Type of project
Reinforced Soil Walls and Slope Reinforcement
Year
2019
Location
BULELENG - BALI PROVINCE - Indonesia
Client
MINISTRY OF PUBLIC WORKS

Challenge

The construction of the Mengwitani-Singaraja shortcut that connects the South and North of Bali regions aims to reduce the current road bends and inclines. With the shortcut, the incline will become more gentle, the travel time reduced, and accident-prone hazards mitigated. Shortcuts will be built at 10 locations and a rest area will also be built along with the Ki Barak Panji Sakti Monument as an icon in the park and parking area. Despite the pandemic, the construction of shortcuts is still ongoing and following the health protocols. Part of the road was planned to be built on top of an embankment that needed reinforcement against external loads, such as traffic loads and earthquakes. The 30 meters height of an embankment is a great challenge to reinforce. An innovative solution is needed to overcome this challenge to create a safe and stabilized embankment for the new shortcut road.

Solution

As a solution to stabilize the embankment slope, a Paramesh System was proposed. Paramesh system consists of Para Products (Geogrid) as a primary reinforcement and Terramesh® as a secondary reinforcement which also functions as the facing of the slope on which vegetation is free to grow. The geogrid that was used was a combination of Paralink® 300 with a tensile strength of 300 kN/m and MacGrid® WG 15 with a tensile strength of 150 kN/m. The height of the structure was 20 meters with additional wrapped-around geotextiles of 10 meters on top of the Paramesh System. Maccaferri Indonesia provides comprehensive services starting from the design and planning stage with the technical recommendation, manufacture and supply materials, and construction stage with Product Assistance. Most of the materials from Maccaferri Indonesia are manufactured locally in Indonesia under International and National Standardization and verified by a TKDN certificate.

Download
the Success Story

MSE WALL SUPPORTS THE ROAD CONNECTION OF NORTH BALI AND SOUTH BALI

Download
MSE WALL SUPPORTS THE ROAD CONNECTION OF NORTH BALI AND SOUTH BALI

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *