INDOCEMENT FACTORY RIVERBANK PROTECTION

Type of project
Channelling Works
Year
2020
Location
CIBINONG - WEST JAVA - Indonesia
Client
PT Indocement Tunggal Prakarsa Tbk in cooperation with Heidelberg Technology Center

Challenge

Indocement factory is located in the South of Jakarta and it is the second-largest cement producer in Indonesia. PT Indocement Tunggal Prakarsa Tb in cooperation with Heidelberg Technology Center aimed to provide protection against the erosion affecting the banks of the river flowing adjacent to their cement production plant. During the rainy season, the riverbanks were severely damaged by erosion processes which were threatening the plant structures nearby (conveyor belts and storage tanks). The ongoing erosion had to be minimized through an engineered river lining.

Solution

The solution proposed by Maccaferri involved mainly Gabion structures coupled with Reno Mattresses used as toe scouring protection. The solution, if compared to traditional stone masonry walls, is more flexible, permeable and durable. In addition, all the areas interested by occasional floods were protected using a 100% natural biomat (Maccaferri BioMac) along with the manual application of mulching in order to rapidly establish the vegetation. The solution proposed is designed in order to withstand a maximum water velocity equal to 3,0 m/s. The riverbank protection designed and build is approximately 1,0 km long and divided in the following stretches: Chainage 0+400 - 0+650: BioMac + Mulching as riverbank erosion control. Chainage 0+650 - 1+250: Gabion wall + Reno Mattresses as scour protection Chainage 1+250 - 1+320: Reno Mattresses All the factory outflow structures are protected using Reno Mattresses supported by Gabions. All the double twisted products involved are Galfan (Zn+Al) and PVC coated in order to guarantee high durability when used in river training works. All the stability checks of the Gabions and Reno Mattresses structures were performed using the internally developed Maccaferri software (MacStars W 4.0). Furthermore, Maccafferri provided the Client with job site supervision and the Contractor with installation assistance in order to ensure that the highest construction and installation standards were followed.

Download
the Success Story

INDOCEMENT FACTORY RIVERBANK PROTECTION

Download
INDOCEMENT FACTORY RIVERBANK PROTECTION

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *