Gabion Defense - Cajuca East Corridor

Tahun
2020
Lokasi
NAZCA - ICA - Perú
Klien
CONSORCIO CAJUCA
Perancang
MUNICIPALIDAD PROVINCIAL NAZCA

Tantangan

Given the events following the El Niño phenomenon in 1998, the Nazca Valley has been affected by river overflow and ravines. The high vulnerability to overflowing on the right bank of the natural drain in the Cajuca area of the Nazca district poses a latent danger to the entire population of the populated centers Cajuca I, II, and Buena Fe.

Solusi

The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determined as a solution is the dredging and channeling through a river defense structure with gabions and an anti-undermining base of 1,300 meters on the right bank of the natural drain of Cajuca. Maccaferri provided technical advice to the Cajuca consortium, responsible for the execution of the project, in order to ensure the optimal functionality of the project and the completion of the construction process.

Unduh Kisah Sukses

Gabion Defense - Cajuca East Corridor

Unduh
Gabion Defense - Cajuca East Corridor

Produk kami untuk
kisah sukses ini Kisah Sukses

Hubungi kami

Jika Anda menyetujui Kebijakan Privasi perusahaan dan telah memahami isinya, Pengendali Data menanyakan apakah Anda menyetujui pemrosesan data dengan cara yang ditetapkan dalam kebijakan privasi perusahaan, untuk tujuan pengiriman komunikasi promosi mengenai layanan/kegiatan yang disediakan oleh Pengendali Data. *

Selain itu, Pengendali Data menanyakan apakah Anda memberikan persetujuan untuk pengungkapan data pribadi Anda kepada Afiliasi Maccaferri, serta kemungkinan transfer data ke luar UE yang dapat terjadi akibatnya, untuk tujuan mereka sendiri, termasuk tujuan promosi (pengiriman komunikasi pemasaran) *