EROSION CONTROL SYSTEM WITH POLYBAG METHOD AT TIU SUNTUK DAM

Jenis proyek
Slope Protection
Tahun
2023
Lokasi
WEST SUMBAWA - WEST NUSA TENGGARA - Indonesia
Klien
PT. PP – MARFRI KSO

Tantangan

Tiu Suntuk Dam is one of the PSN (Proyek Strategis Nasional) projects for dam construction in NTB. Regarding this condition, the cut slopes caused during the construction need to be protected from surface erosion. The slopes were cut steeply due to the w...

Solusi

In order to mitigate the surface erosion of slopes, the Erosion Control System was chosen due to its easy application, permeable material, and competitive price. The material used is MacMat® HS to protect the steep slope. The material works as prelimina...

Hubungi kami

Jika Anda menyetujui Kebijakan Privasi perusahaan dan telah memahami isinya, Pengendali Data menanyakan apakah Anda menyetujui pemrosesan data dengan cara yang ditetapkan dalam kebijakan privasi perusahaan, untuk tujuan pengiriman komunikasi promosi mengenai layanan/kegiatan yang disediakan oleh Pengendali Data. *

Selain itu, Pengendali Data menanyakan apakah Anda memberikan persetujuan untuk pengungkapan data pribadi Anda kepada Afiliasi Maccaferri, serta kemungkinan transfer data ke luar UE yang dapat terjadi akibatnya, untuk tujuan mereka sendiri, termasuk tujuan promosi (pengiriman komunikasi pemasaran) *