EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN

Tahun
2019
Lokasi
PALI - RAJASTHAN - India
Klien
Dedicated Freight Corridor Corporation of India Limited (DFCCL)
Perancang
Maccaferri Environmental Solutions Pvt Ltd

Tantangan

The site was a railway embankment in state of Rajasthan constructed using silty sand with slope height upto 18m. The embankment slope was at risk of eroding or failing due to reasons such as heavy precipitation during the rainy season, steep gradient, absence of vegetation cover, drainage issues, etc. Denudation of vegetation from soil slopes or the lack of vegetative cover on embankment slopes was often responsible for formation of rills and rain-cuts, eventually leading to a surficial slide or undermining of the edges of the railway embankments.   There was a need identified to protect the railway embankment slope from erosion by growing sustainable vegetation. Aspects such as extremely high temperature in range of 45 degree celsius, absence of organic content in soil, long slopes, etc. made the project very challenging.  

Solusi

To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosion. Initially, tests were carried out for required soil amendments (nutrients, pH balancing agents, etc.) and seed selection considering the challenging soil and environmental conditions existing at site. For slope height upto 4m, Hydraulically Applied Erosion Control Products (HECPs) solution in form of MacFlex and Macganics along with necessary soil amendments in combination with seeds were sprayed on the slope surface. For slope height more than 4m and upto 7m, HECP was first applied on the slope surface followed by installation of biodegradable erosion control mat (BioMac CCW) for erosion protection and vegetation growth. For slope height more than 7m, HECP was followed by installation of unreinforced 3-dimensional geosynthetic mat (MacMat 9.1) for erosion protection and vegetation growth.  

Unduh Kisah Sukses

EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN

Unduh
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN

Hubungi kami

Jika Anda menyetujui Kebijakan Privasi perusahaan dan telah memahami isinya, Pengendali Data menanyakan apakah Anda menyetujui pemrosesan data dengan cara yang ditetapkan dalam kebijakan privasi perusahaan, untuk tujuan pengiriman komunikasi promosi mengenai layanan/kegiatan yang disediakan oleh Pengendali Data. *

Selain itu, Pengendali Data menanyakan apakah Anda memberikan persetujuan untuk pengungkapan data pribadi Anda kepada Afiliasi Maccaferri, serta kemungkinan transfer data ke luar UE yang dapat terjadi akibatnya, untuk tujuan mereka sendiri, termasuk tujuan promosi (pengiriman komunikasi pemasaran) *